X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395040110000

Well Details

Well ID: 0395040110000
Loading map...
Location: 00/10-01-039-04W5/0
Location Alias: 00/10-01-39-04 W5M
Location Alias 2: 00/10-01-039-04 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 04
Section: 01
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 10-1-39-4
Operator Name: Cenovus Energy Inc.
License Number: 0024137
License Date: 1963-05-10
License Status: Issued
Spud Date: 1963-05-26
Final Drill Date: 1963-06-10
Well Total Depth: 2331.70 m
Surface Hole Latitude: 52.328349
Surface Hole Longitude: -114.442446

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-05-10 Obtained License
1963-06-10 Finished Drilling
1963-06-10 Well Mode changed to Drilled and Cased
1963-06-12 Drill Stem Test Performed
1963-06-14 Drill Stem Test Performed
1963-06-15 Production Casing Operation Performed
1963-06-21 Perforation Treatment Performed - Jet Perforation
1963-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-07-04 Perforation Treatment Performed - Cement Squeeze
1963-07-06 Perforation Treatment Performed - Bullet Perforation
1963-07-07 Perforation Treatment Performed - Acid Wash - No Pressure
1963-07-13 Drill Stem Test Performed
1963-09-27 Perforation Treatment Performed - Cement Plug
1963-09-27 Perforation Treatment Performed - Jet Perforation
1963-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-10 Perforation Treatment Performed - Fractured
1963-10-14 Well Began Production
1963-10-14 Well Fluid changed to Crude Oil
1963-10-14 Well Mode changed to Flowing
1979-10-05 Well Fluid changed to Crude Oil
1979-10-05 Well Mode changed to Pumping
1993-11-18 Well Log Performed
1994-03-29 Well Log Performed
1994-03-31 Well Log Performed
1997-01-17 Perforation Treatment Performed - Jet Perforation
1997-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-01-23 Perforation Treatment Performed - Jet Perforation
1997-01-23 Plug Back Performed
1997-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-05 Perforation Treatment Performed - Cement Squeeze
1997-02-05 Plug Back Performed
1997-02-05 Well Fluid changed to Crude Oil
1997-02-05 Well Mode changed to Suspended
1997-02-21 Well Fluid changed to Crude Oil
1997-02-21 Well Mode changed to Suspended
2004-05-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-05-05 Plug Back Performed
2004-05-06 Well Log Performed
2004-05-07 Perforation Treatment Performed - Jet Perforation
2004-05-07 Well Log Performed
2004-05-10 Perforation Treatment Performed - Cement Squeeze
2004-05-10 Well Log Performed
2004-05-12 Perforation Treatment Performed - Cement Squeeze
2004-05-18 Perforation Treatment Performed - Jet Perforation
2004-05-18 Well Log Performed
2004-05-25 Perforation Treatment Performed - Fractured
2006-10-14 Well Log Performed
2006-10-18 Perforation Treatment Performed - Cement Squeeze
2006-10-18 Plug Back Performed
2006-10-24 Perforation Treatment Performed - Jet Perforation
2006-10-24 Well Log Performed
2006-10-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-21 Perforation 2216.80 2219.20 7
1963-10-10 Fracture 2186.60 2190.90 0
1997-01-17 Perforation 2290.90 2301.20 17
1997-01-21 Acid Treatment 2290.90 2301.20 0
1997-01-23 Packing Device Capped w/Cement 2277.00 2285.00 0
1997-01-23 Perforation 2247.60 2257.00 17
1997-01-27 Acid Treatment 2247.60 2257.00 0
1997-02-01 Acid Treatment 2247.60 2257.00 0
1997-02-05 Cement Squeeze 2187.20 2218.60 0
2004-05-05 Packing Device Capped w/Cement 2234.00 2242.00 0
2004-05-07 Perforation 1686.00 1687.00 14
1963-06-22 Acid Treatment 2216.80 2219.20 0
2004-05-07 Perforation 1733.00 1734.00 14
2004-05-10 Cement Squeeze 1733.00 1734.00 0
2004-05-12 Cement Squeeze 1686.00 1687.00 0
2004-05-18 Perforation 1717.90 1722.70 17
2004-05-25 Fracture 1717.90 1722.70 0
2006-10-18 Cement Squeeze 1717.90 1722.70 0
2006-10-24 Perforation 2046.00 2054.00 20
2006-10-25 Fracture 2046.00 2054.00 0
1963-07-04 Cement Squeeze 2216.80 2219.20 0
1963-07-06 Bullet Perforation 2217.40 2218.60 7
1963-07-07 Acid Wash 2217.40 2218.60 0
1963-09-27 Cement Plug 2209.80 2218.90 0
1963-09-27 Perforation 2186.60 2187.20 7
1963-09-27 Perforation 2189.10 2190.90 7
1963-09-28 Acid Treatment 2186.60 2190.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 2110 0.0 0.0 0.0
1970 1624 0.0 0.0 0.0
1971 1565 0.0 0.0 0.0
1972 2209 0.0 0.0 0.0
1973 3770 0.0 0.0 0.0
1974 3990 0.0 0.0 0.0
1975 4376 0.0 0.0 0.0
1976 4335 0.0 0.0 0.0
1977 4504 0.0 0.0 0.0
1978 6192 0.0 0.0 0.0
1979 7715 0.0 0.0 0.0
1980 8765 0.0 0.0 0.0
1981 8088 0.0 0.0 0.0
1982 8743 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8660 0.0 0.0 0.0
1986 8759 0.0 0.0 0.0
1987 8599 0.0 0.0 0.0
1988 7814 0.0 0.0 0.0
1989 3770 0.0 0.0 0.0
1990 6893 0.0 0.0 0.0
1991 5488 0.0 0.0 0.0
1992 5053 0.0 0.0 0.0
1993 7339 0.0 0.0 0.0
1994 6646 0.0 0.0 0.0
1995 3996 0.0 0.0 0.0
1996 3449 0.0 0.0 0.0

For data sources see[5]

References