If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395033411002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.396187,"lon":-114.352738,"icon":""}]} |
Location: 00/11-34-039-03W5/2 | |
Location Alias: 00/11-34-39-03 W5M | |
Location Alias 2: 00/11-34-039-03 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 34 | |
County/Municipality: Lacombe County | |
Well Name: NORTHROCK 11C MEDR 11-34-39-3 | |
Operator Name: TAQA North Ltd. | |
License Number: 0165254 | |
License Date: 1994-02-18 | |
License Status: Suspension | |
Spud Date: 1994-07-22 | |
Final Drill Date: 1997-08-12 | |
Well Total Depth: 2708.00 m | |
Surface Hole Latitude: 52.396187 | |
Surface Hole Longitude: -114.352738 |
Date | Event |
---|---|
1994-02-18 | Obtained License |
1997-07-25 | Direction Drilling Operation Performed - Horizontal |
1997-08-12 | Finished Drilling |
1997-08-12 | Well Log Performed |
1997-08-12 | Well Mode changed to Drilled and Cased |
1997-08-13 | Well Log Performed |
1997-08-14 | Liner Casing Operation Performed |
1997-08-15 | Rig Released |
1997-08-15 | Well Log Performed |
1997-08-21 | Well Log Performed |
1997-08-31 | Perforation Treatment Performed - Open-Hole Completion |
1997-09-19 | Well Began Production |
1997-09-19 | Well Fluid changed to Crude Oil |
1997-09-19 | Well Mode changed to Pumping |
2009-03-31 | Well Fluid changed to Crude Oil |
2009-03-31 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-07-25 | 1965.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-08-31 | Open Hole/Barefoot Completion | 2194.80 | 2708.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 1509 | 0.0 | 0.0 | 0.0 |
1998 | 7401 | 0.0 | 0.0 | 0.0 |
1999 | 4616 | 0.0 | 0.0 | 0.0 |
2000 | 3292 | 0.0 | 0.0 | 0.0 |
2001 | 2947 | 0.0 | 0.0 | 0.0 |
2002 | 7598 | 0.0 | 0.0 | 0.0 |
2003 | 8241 | 0.0 | 0.0 | 0.0 |
2004 | 8183 | 0.0 | 0.0 | 0.0 |
2005 | 8141 | 0.0 | 0.0 | 0.0 |
2006 | 7419 | 0.0 | 0.0 | 0.0 |
2007 | 4571 | 0.0 | 0.0 | 0.0 |
2008 | 144 | 0.0 | 0.0 | 0.0 |
For data sources see[6]