X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395033208000

Well Details

Well ID: 0395033208000
Loading map...
Location: 00/08-32-039-03W5/0
Location Alias: 00/08-32-39-03 W5M
Location Alias 2: 00/08-32-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 32
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 8-32-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0016713
License Date: 1959-02-11
License Status: Issued
Spud Date: 1959-02-17
Final Drill Date: 1959-03-07
Well Total Depth: 2164.10 m
Surface Hole Latitude: 52.397526
Surface Hole Longitude: -114.388523

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-11 Obtained License
1959-03-07 Finished Drilling
1959-03-07 Well Mode changed to Drilled and Cased
1959-03-08 Production Casing Operation Performed
1959-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-03-10 Perforation Treatment Performed - Fractured
1959-03-10 Perforation Treatment Performed - Jet Perforation
1959-03-15 Well Began Production
1959-03-15 Well Fluid changed to Crude Oil
1959-03-15 Well Mode changed to Flowing
1961-03-22 Well Fluid changed to Crude Oil
1961-03-22 Well Mode changed to Pumping
1985-10-08 Perforation Treatment Performed - Fractured
1985-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-07-23 Well Log Performed
1987-07-25 Well Log Performed
1989-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-10-03 Well Log Performed
2000-10-04 Perforation Treatment Performed - Jet Perforation
2000-10-04 Well Log Performed
2000-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-11-04 Well Began Injection
2000-11-04 Well Fluid changed to Water
2000-11-04 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-10 Perforation 2135.70 2138.80 13
1959-03-10 Acid Treatment 2135.70 2138.80 0
1959-03-10 Fracture 2135.70 2138.80 0
1985-10-08 Fracture 2135.70 2138.80 0
1985-10-09 Acid Treatment 2135.70 2138.80 0
1989-01-14 Acid Treatment 2135.70 2138.80 0
2000-10-04 Perforation 2134.00 2140.00 13
2000-10-06 Acid Treatment 2134.00 2140.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1104 0.0 0.0 0.0
1968 6222 0.0 0.0 0.0
1969 7331 0.0 0.0 0.0
1970 5252 0.0 0.0 0.0
1971 6142 0.0 0.0 0.0
1972 7368 0.0 0.0 0.0
1973 7563 0.0 0.0 0.0
1974 7087 0.0 0.0 0.0
1975 8155 0.0 0.0 0.0
1976 7535 0.0 0.0 0.0
1977 8033 0.0 0.0 0.0
1978 7508 0.0 0.0 0.0
1979 8507 0.0 0.0 0.0
1980 7940 0.0 0.0 0.0
1981 8048 0.0 0.0 0.0
1982 7953 0.0 0.0 0.0
1983 8579 0.0 0.0 0.0
1984 8278 0.0 0.0 0.0
1985 8441 0.0 0.0 0.0
1986 8400 0.0 0.0 0.0
1987 8323 0.0 0.0 0.0
1988 8727 0.0 0.0 0.0
1989 8370 0.0 0.0 0.0
1990 8662 0.0 0.0 0.0
1991 8257 0.0 0.0 0.0
1992 8603 0.0 0.0 0.0
1993 8548 0.0 0.0 0.0
1994 8243 0.0 0.0 0.0
1995 6229 0.0 0.0 0.0
1996 8518 0.0 0.0 0.0
1997 8641 0.0 0.0 0.0
1998 8542 0.0 0.0 0.0
1999 8617 0.0 0.0 0.0
2000 5934 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References