X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395033206002

Well Details

Well ID: 0395033206002
Loading map...
Location: 00/06-32-039-03W5/2
Location Alias: 00/06-32-39-03 W5M
Location Alias 2: 00/06-32-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 32
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 6-32-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0016040
License Date: 1958-10-15
License Status: RecCertified
Spud Date: 1958-10-29
Final Drill Date: 1958-11-29
Well Total Depth: 2176.60 m
Surface Hole Latitude: 52.397492
Surface Hole Longitude: -114.400391

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-15 Obtained License
1958-10-29 Lost Circulation Occurred
1958-11-28 Drill Stem Test Performed
1958-11-29 Finished Drilling
1958-11-29 Well Mode changed to Drilled and Cased
1958-12-01 Production Casing Operation Performed
1958-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-03 Perforation Treatment Performed - Bullet Perforation
1958-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-09-30 Plug Back Performed
1992-09-30 Well Log Performed
1992-10-01 Perforation Treatment Performed - Jet Perforation
1992-10-01 Well Log Performed
1992-10-02 Well Log Performed
1992-10-04 Perforation Treatment Performed - Fractured
1992-12-18 Well Began Production
1992-12-18 Well Fluid changed to Gas
1992-12-18 Well Mode changed to Flowing
1994-08-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-29 Perforation Treatment Performed - Jet Perforation
1994-08-29 Plug Back Performed
1994-08-29 Well Log Performed
1994-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-30 Perforation Treatment Performed - Remedial Casing
1994-08-30 Well Fluid changed to Gas
1994-08-30 Well Mode changed to Abandoned
1994-08-31 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-12-03 Bullet Perforation 2147.90 2155.20 13
1994-08-30 Packing Device Capped w/Cement 324.00 344.00 0
1958-12-03 Acid Treatment 2147.90 2155.20 0
1958-12-05 Acid Treatment 2147.90 2155.20 0
1992-09-30 Packing Device Capped w/Cement 2138.00 2141.00 0
1992-10-01 Perforation 2124.50 2131.10 13
1992-10-04 Fracture 2124.50 2131.10 0
1994-08-29 Packing Device Capped w/Cement 2097.00 2105.00 0
1994-08-29 Perforation 352.00 352.50 13
1994-08-30 Remedial Casing Cementing 352.00 352.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5407 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-10-29 Lost Circulation 22.30 54.60

For data sources see[6]

References