X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395033116000

Well Details

Well ID: 0395033116000
Loading map...
Location: 00/16-31-039-03W5/0
Location Alias: 00/16-31-39-03 W5M
Location Alias 2: 00/16-31-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 31
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 16-31-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0023630
License Date: 1963-01-09
License Status: RecCertified
Spud Date: 1963-01-15
Final Drill Date: 1963-02-01
Well Total Depth: 2204.90 m
Surface Hole Latitude: 52.404702
Surface Hole Longitude: -114.412516

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-09 Obtained License
1963-02-01 Finished Drilling
1963-02-01 Well Mode changed to Drilled and Cased
1963-02-02 Drill Stem Test Performed
1963-02-03 Production Casing Operation Performed
1963-02-06 Perforation Treatment Performed - Jet Perforation
1963-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-02-12 Perforation Treatment Performed - Fractured
1963-02-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-03-07 Well Began Production
1963-03-07 Well Fluid changed to Crude Oil
1963-03-07 Well Mode changed to Pumping
1970-03-12 Well Fluid changed to Crude Oil
1970-03-12 Well Mode changed to Suspended
1988-03-12 Well Fluid changed to Crude Oil
1988-03-12 Well Mode changed to Pumping
1988-09-19 Perforation Treatment Performed - Jet Perforation
1988-09-19 Well Log Performed
1988-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-11-21 Well Fluid changed to Crude Oil
1988-11-21 Well Mode changed to Suspended
1993-10-07 Well Log Performed
1993-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-08 Plug Back Performed
1993-10-08 Well Log Performed
1993-10-09 Perforation Treatment Performed - Jet Perforation
1993-10-09 Perforation Treatment Performed - Remedial Casing
1993-10-09 Well Fluid changed to Crude Oil
1993-10-09 Well Mode changed to Abandoned
1993-10-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-06 Perforation 2165.30 2167.10 13
1963-02-07 Acid Treatment 2165.30 2167.10 0
1963-02-12 Fracture 2165.30 2167.10 0
1963-02-13 Hydra Jet Perforation 2163.80 2163.80 0
1988-09-19 Perforation 2162.90 2167.00 13
1988-09-21 Acid Treatment 2162.90 2167.10 0
1993-10-08 Packing Device Capped w/Cement 2127.00 2135.00 0
1993-10-09 Perforation 383.00 383.50 13
1993-10-09 Remedial Casing Cementing 383.00 383.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 6834 0.0 0.0 0.0
1969 7148 0.0 0.0 0.0
1970 1704 0.0 0.0 0.0
1988 2234 0.0 0.0 0.0

For data sources see[5]

References