X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032902000

Well Details

Well ID: 0395032902000
Loading map...
Location: 00/02-29-039-03W5/0
Location Alias: 00/02-29-39-03 W5M
Location Alias 2: 00/02-29-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 29
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 2-29-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0023892
License Date: 1963-02-26
License Status: RecCertified
Spud Date: 1963-02-28
Final Drill Date: 1963-03-18
Well Total Depth: 2225.00 m
Surface Hole Latitude: 52.379435
Surface Hole Longitude: -114.393779

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-02-26 Obtained License
1963-02-28 Lost Circulation Occurred
1963-03-08 Drill Stem Test Performed
1963-03-17 Drill Stem Test Performed
1963-03-18 Finished Drilling
1963-03-18 Well Mode changed to Drilled and Cased
1963-03-19 Drill Stem Test Performed
1963-03-20 Production Casing Operation Performed
1963-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-21 Perforation Treatment Performed - Acid Wash - No Pressure
1963-03-21 Perforation Treatment Performed - Jet Perforation
1963-05-10 Well Began Production
1963-05-10 Well Fluid changed to Crude Oil
1963-05-10 Well Mode changed to Pumping
1969-02-09 Well Fluid changed to Crude Oil
1969-02-09 Well Mode changed to Suspended
1997-06-12 Well Log Performed
1997-06-16 Well Log Performed
1997-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-21 Perforation Treatment Performed - Jet Perforation
1997-06-21 Plug Back Performed
1997-06-21 Well Log Performed
1997-06-26 Well Log Performed
1998-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-01 Perforation Treatment Performed - Cement Plug
1998-08-01 Perforation Treatment Performed - Jet Perforation
1998-08-01 Perforation Treatment Performed - Remedial Casing
1998-08-01 Plug Back Performed
1998-08-02 Well Abandoned
1998-08-02 Well Fluid changed to Crude Oil
1998-08-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-21 Perforation 2170.20 2171.40 7
1998-08-01 Remedial Casing Cementing 380.00 381.00 0
1998-08-01 Cement Plug 345.00 381.00 0
1963-03-21 Acid Wash 2170.20 2171.40 0
1963-03-21 Acid Treatment 2170.20 2171.40 0
1997-06-21 Perforation 2151.90 2153.70 13
1997-06-21 Perforation 2155.60 2158.60 13
1997-06-21 Perforation 2159.20 2161.30 13
1997-06-21 Packing Device Capped w/Cement 2164.00 2167.00 0
1998-08-01 Packing Device Capped w/Cement 2136.00 2144.00 0
1998-08-01 Perforation 380.00 381.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7883 0.0 0.0 0.0
1968 4014 0.0 0.0 0.0
1969 955 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1963-02-28 Lost Circulation 32.00 32.00

For data sources see[6]

References