If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395032816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.390823,"lon":-114.362389,"icon":""}]} |
Location: 00/16-28-039-03W5/0 | |
Location Alias: 00/16-28-39-03 W5M | |
Location Alias 2: 00/16-28-039-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 03 | |
Section: 28 | |
County/Municipality: Lacombe County | |
Well Name: CVE MEDRIV 16-28-39-3 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0155218 | |
License Date: 1992-12-17 | |
License Status: RecCertified | |
Spud Date: 1993-01-06 | |
Final Drill Date: 1993-01-18 | |
Well Total Depth: 2228.00 m | |
Surface Hole Latitude: 52.390823 | |
Surface Hole Longitude: -114.362389 |
Date | Event |
---|---|
1992-12-17 | Obtained License |
1993-01-06 | Lost Circulation Occurred |
1993-01-08 | Surface Casing Operation Performed |
1993-01-18 | Finished Drilling |
1993-01-18 | Well Log Performed |
1993-01-18 | Well Mode changed to Drilled and Cased |
1993-01-19 | Well Log Performed |
1993-01-20 | Drill Stem Test Performed |
1993-01-22 | Production Casing Operation Performed |
1993-01-22 | Rig Released |
1993-01-31 | Perforation Treatment Performed - Jet Perforation |
1993-01-31 | Well Log Performed |
1993-02-02 | Perforation Treatment Performed - Jet Perforation |
1993-02-02 | Well Log Performed |
1993-02-04 | Well Log Performed |
1993-02-05 | Perforation Treatment Performed - Jet Perforation |
1993-02-05 | Well Log Performed |
1993-02-15 | Well Began Production |
1993-02-15 | Well Fluid changed to Crude Oil |
1993-02-15 | Well Mode changed to Flowing |
1993-10-01 | Well Fluid changed to Crude Oil |
1993-10-01 | Well Mode changed to Suspended |
2003-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-01-19 | Well Log Performed |
2004-01-07 | Well Log Performed |
2005-01-05 | Perforation Treatment Performed - Jet Perforation |
2005-01-07 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2005-01-09 | Perforation Treatment Performed - Jet Perforation |
2005-01-09 | Well Log Performed |
2005-11-12 | Well Fluid changed to Crude Oil |
2005-11-12 | Well Mode changed to Flowing |
2006-01-01 | Well Fluid changed to Crude Oil |
2006-01-01 | Well Mode changed to Suspended |
2009-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-01-19 | Plug Back Performed |
2009-01-19 | Well Fluid changed to Crude Oil |
2009-01-19 | Well Log Performed |
2009-01-19 | Well Mode changed to Abandoned Zone |
2009-01-20 | Perforation Treatment Performed - Jet Perforation |
2009-01-20 | Well Log Performed |
2009-01-21 | Perforation Treatment Performed - Remedial Casing |
2009-01-21 | Well Log Performed |
2009-02-05 | Well Abandoned |
2009-02-05 | Well Fluid changed to Crude Oil |
2009-02-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-01-31 | Perforation | 2181.50 | 2182.50 | 13 |
2009-01-20 | Perforation | 515.00 | 516.00 | 17 |
2009-01-21 | Remedial Casing Cementing | 515.00 | 516.00 | 0 |
1993-02-02 | Perforation | 2173.00 | 2174.00 | 13 |
1993-02-02 | Perforation | 2181.00 | 2183.00 | 13 |
1993-02-05 | Perforation | 2169.20 | 2170.20 | 13 |
2003-01-19 | Packing Device Capped w/Cement | 2148.00 | 2156.00 | 0 |
2005-01-05 | Perforation | 2169.20 | 2170.20 | 13 |
2005-01-07 | Packing Dev Cpd w/Res-Gyp Cem | 2165.00 | 2168.00 | 0 |
2005-01-09 | Perforation | 2156.00 | 2160.00 | 17 |
2009-01-19 | Packing Device Capped w/Cement | 2141.00 | 2149.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1993 | 1855 | 0.0 | 0.0 | 0.0 |
2005 | 66 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1993-01-06 | Lost Circulation | 29.00 | 42.00 |
For data sources see[6]