X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032704000

Well Details

Well ID: 0395032704000
Loading map...
Location: 00/04-27-039-03W5/0
Location Alias: 00/04-27-39-03 W5M
Location Alias 2: 00/04-27-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 27
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 4-27-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0025127
License Date: 1963-11-14
License Status: Abandoned
Spud Date: 1963-11-27
Final Drill Date: 1963-12-20
Well Total Depth: 2193.30 m
Surface Hole Latitude: 52.379544
Surface Hole Longitude: -114.356693

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-11-14 Obtained License
1963-12-14 Drill Stem Test Performed
1963-12-20 Finished Drilling
1963-12-20 Well Mode changed to Drilled and Cased
1963-12-22 Drill Stem Test Performed
1963-12-23 Drill Stem Test Performed
1963-12-24 Production Casing Operation Performed
1963-12-31 Perforation Treatment Performed - Jet Perforation
1964-01-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-08 Perforation Treatment Performed - Bridge Plug No Cement Required
1964-01-08 Perforation Treatment Performed - Jet Perforation
1964-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-01-12 Well Began Production
1964-01-12 Well Fluid changed to Crude Oil
1964-01-12 Well Mode changed to Flowing
1964-04-02 Well Fluid changed to Crude Oil
1964-04-02 Well Mode changed to Pumping
1966-03-16 Perforation Treatment Performed - Fractured
1972-11-07 Perforation Treatment Performed - Fractured
1972-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-09 Perforation Treatment Performed - Jet Perforation
1986-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-16 Perforation Treatment Performed - Jet Perforation
1986-07-16 Well Log Performed
1986-07-18 Perforation Treatment Performed - Cement Squeeze
1986-07-22 Perforation Treatment Performed - Jet Perforation
1986-07-22 Well Log Performed
1986-07-23 Perforation Treatment Performed - Jet Perforation
1986-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-13 Well Fluid changed to Crude Oil
1986-08-13 Well Mode changed to Suspended
1990-12-07 Well Log Performed
1990-12-11 Well Log Performed
1991-03-04 Well Began Injection
1991-03-04 Well Fluid changed to Water
1991-03-04 Well Type changed to Injection
2006-02-19 Perforation Treatment Performed - Cement Plug
2006-02-19 Perforation Treatment Performed - Cement Squeeze
2006-02-19 Plug Back Performed
2006-02-19 Well Fluid changed to Water
2006-02-19 Well Mode changed to Abandoned Zone
2006-02-19 Well Type changed to Injection
2006-02-20 Perforation Treatment Performed - Jet Perforation
2006-02-20 Well Log Performed
2006-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-21 Perforation Treatment Performed - Remedial Casing
2006-02-21 Well Log Performed
2006-02-22 Perforation Treatment Performed - Jet Perforation
2006-02-22 Well Log Performed
2006-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-25 Perforation Treatment Performed - Jet Perforation
2006-02-25 Well Log Performed
2006-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-02-26 Perforation Treatment Performed - Remedial Casing
2006-03-02 Well Abandoned
2006-03-02 Well Fluid changed to Water
2006-03-02 Well Mode changed to Abandoned
2006-03-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-12-31 Perforation 2173.80 2176.90 7
1986-07-16 Perforation 2151.50 2153.00 12
1986-07-16 Acid Treatment 2151.50 2154.00 0
1986-07-18 Cement Squeeze 2151.50 2154.30 0
1986-07-22 Perforation 2153.90 2155.50 12
1986-07-23 Perforation 2148.00 2150.00 12
1986-07-25 Acid Treatment 2148.00 2155.50 0
2006-02-19 Cement Squeeze 2148.00 2155.50 0
2006-02-19 Cement Plug 2039.00 2116.50 0
2006-02-20 Perforation 1413.00 1414.00 13
2006-02-21 Remedial Casing Cementing 1413.00 1414.00 0
1964-01-01 Acid Treatment 2173.80 2176.90 0
2006-02-21 Packing Device Capped w/Cement 1397.00 1408.00 0
2006-02-22 Perforation 929.00 930.00 13
2006-02-25 Packing Device Capped w/Cement 913.00 945.00 0
2006-02-25 Perforation 361.00 362.00 13
2006-02-25 Perforation 230.00 231.00 13
2006-02-26 Remedial Casing Cementing 361.00 362.00 0
2006-02-26 Packing Device Capped w/Cement 346.00 357.50 0
2006-02-26 Remedial Casing Cementing 230.00 231.00 0
2006-02-26 Packing Device Capped w/Cement 210.00 225.00 0
1964-01-08 Bridge Plug, No Cement 2167.10 2167.10 0
1964-01-08 Perforation 2152.80 2154.30 7
1964-01-09 Acid Treatment 2152.80 2154.30 0
1966-03-16 Fracture 2152.80 2154.30 0
1972-11-07 Fracture 2152.80 2154.30 0
1972-11-09 Perforation 2152.80 2154.30 7
1972-11-09 Acid Treatment 2152.80 2154.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4089 0.0 0.0 0.0
1968 7398 0.0 0.0 0.0
1969 7677 0.0 0.0 0.0
1970 8415 0.0 0.0 0.0
1971 7329 0.0 0.0 0.0
1972 3504 0.0 0.0 0.0
1973 7863 0.0 0.0 0.0
1974 6450 0.0 0.0 0.0
1975 2184 0.0 0.0 0.0
1986 336 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0

For data sources see[5]

References