X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032312003

Well Details

Well ID: 0395032312003
Loading map...
Location: 00/12-23-039-03W5/3
Location Alias: 00/12-23-39-03 W5M
Location Alias 2: 00/12-23-039-03 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 23
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 12-23-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0022954
License Date: 1962-09-04
License Status: Issued
Spud Date: 1962-09-05
Final Drill Date: 1962-10-09
Well Total Depth: 2660.90 m
Surface Hole Latitude: 52.372554
Surface Hole Longitude: -114.335006

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-04 Obtained License
1962-09-16 Drill Stem Test Performed
1962-09-17 Drill Stem Test Performed
1962-10-06 Drill Stem Test Performed
1962-10-08 Drill Stem Test Performed
1962-10-09 Finished Drilling
1962-10-09 Well Mode changed to Drilled and Cased
1962-10-12 Production Casing Operation Performed
1962-10-30 Perforation Treatment Performed - Jet Perforation
1962-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-09 Perforation Treatment Performed - Jet Perforation
1971-01-07 Perforation Treatment Performed - Cement Squeeze
1971-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-21 Perforation Treatment Performed - Cement Squeeze
1971-02-22 Perforation Treatment Performed - Cement Squeeze
1971-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-23 Perforation Treatment Performed - Jet Perforation
1976-11-11 Perforation Treatment Performed - Jet Perforation
1976-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-18 Perforation Treatment Performed - Fractured
1985-02-24 Well Log Performed
1985-02-25 Perforation Treatment Performed - Jet Perforation
1985-02-26 Well Began Production
1985-02-26 Well Fluid changed to Gas
1985-02-26 Well Mode changed to Flowing
1985-03-03 Well Fluid changed to Gas
1985-03-03 Well Mode changed to Suspended
1985-05-07 Well Fluid changed to Gas
1985-05-07 Well Mode changed to Flowing
1990-11-16 Well Fluid changed to Gas
1990-11-16 Well Mode changed to Suspended
1999-07-21 Well Fluid changed to Gas
1999-07-21 Well Mode changed to Suspended
2001-10-19 Well Log Performed
2001-11-20 Well Fluid changed to Gas
2001-11-20 Well Mode changed to Flowing
2003-09-01 Well Fluid changed to Gas
2003-09-01 Well Mode changed to Suspended
2009-09-15 Well Fluid changed to Gas
2009-09-15 Well Mode changed to Flowing
2009-12-03 Well Fluid changed to Gas
2009-12-03 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-30 Perforation 2087.00 2089.10 7
1970-12-09 Perforation 2129.00 2129.30 7
1971-01-07 Cement Squeeze 2087.00 2089.10 0
1971-01-09 Acid Treatment 2113.80 2129.30 0
1971-02-21 Cement Squeeze 2087.00 2089.10 0
1971-02-22 Cement Squeeze 2113.80 2129.30 0
1971-02-23 Perforation 2113.20 2115.30 7
1971-02-23 Perforation 2116.50 2116.80 7
1971-02-23 Perforation 2117.80 2118.10 7
1971-02-23 Perforation 2119.00 2119.30 7
1971-02-23 Perforation 2120.80 2121.40 7
1962-10-31 Acid Treatment 2087.00 2089.10 0
1971-02-23 Perforation 2122.00 2122.30 7
1971-02-23 Perforation 2123.80 2126.90 7
1971-02-23 Perforation 2127.50 2128.10 7
1971-02-23 Perforation 2128.70 2129.30 7
1971-02-23 Perforation 2132.40 2133.00 7
1971-02-23 Perforation 2133.60 2136.60 7
1971-02-23 Perforation 2137.60 2138.20 7
1971-02-23 Perforation 2138.50 2139.10 7
1971-02-23 Perforation 2139.70 2140.30 7
1971-02-23 Perforation 2140.60 2142.10 7
1970-12-09 Perforation 2113.80 2115.60 7
1971-02-23 Perforation 2143.70 2144.30 7
1971-02-23 Acid Treatment 2113.20 2144.30 0
1976-11-11 Perforation 2132.40 2133.00 7
1976-11-11 Perforation 2133.60 2136.60 7
1976-11-11 Perforation 2138.50 2139.10 7
1976-11-11 Perforation 2139.70 2142.10 7
1976-11-12 Acid Treatment 2132.40 2142.10 0
1976-11-13 Acid Treatment 2132.40 2142.10 0
1976-11-18 Fracture 2132.40 2142.10 0
1985-02-25 Perforation 2071.40 2073.90 13
1970-12-09 Perforation 2116.80 2118.40 7
1970-12-09 Perforation 2119.30 2119.60 7
1970-12-09 Perforation 2121.10 2121.70 7
1970-12-09 Perforation 2122.30 2122.60 7
1970-12-09 Perforation 2124.20 2127.20 7
1970-12-09 Perforation 2127.80 2128.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3353 0.0 0.0 0.0
1986 8457 0.0 0.0 0.0
1987 7649 0.0 0.0 0.0
1988 2214 0.0 0.0 0.0
1989 1796 0.0 0.0 0.0
1990 2435 0.0 0.0 0.0
2001 30 0.0 0.0 0.0
2009 783 0.0 0.0 0.0
2010 7488 0.0 0.0 0.0
2011 8492 0.0 0.0 0.0
2012 8400 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8453 0.0 0.0 0.0
2015 7676 0.0 0.0 0.0
2016 7317 0.0 0.0 0.0
2017 3752 0.0 0.0 0.0
2018 7 0.0 0.0 0.0
2019 7029 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References