X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395032312002

Well Details

Well ID: 0395032312002
Loading map...
Location: 00/12-23-039-03W5/2
Location Alias: 00/12-23-39-03 W5M
Location Alias 2: 00/12-23-039-03 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 23
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 12-23-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0022954
License Date: 1962-09-04
License Status: Issued
Spud Date: 1962-09-05
Final Drill Date: 1962-10-09
Well Total Depth: 2660.90 m
Surface Hole Latitude: 52.372554
Surface Hole Longitude: -114.335006

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-09-04 Obtained License
1962-09-16 Drill Stem Test Performed
1962-09-17 Drill Stem Test Performed
1962-10-06 Drill Stem Test Performed
1962-10-08 Drill Stem Test Performed
1962-10-09 Finished Drilling
1962-10-09 Well Mode changed to Drilled and Cased
1962-10-12 Production Casing Operation Performed
1962-10-30 Perforation Treatment Performed - Jet Perforation
1962-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-12-09 Perforation Treatment Performed - Jet Perforation
1971-01-07 Perforation Treatment Performed - Cement Squeeze
1971-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-21 Perforation Treatment Performed - Cement Squeeze
1971-02-22 Perforation Treatment Performed - Cement Squeeze
1971-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-23 Perforation Treatment Performed - Jet Perforation
1976-11-11 Perforation Treatment Performed - Jet Perforation
1976-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-11-18 Perforation Treatment Performed - Fractured
1976-11-20 Well Began Production
1976-11-20 Well Fluid changed to Crude Oil
1976-11-20 Well Mode changed to Pumping
1978-03-11 Well Fluid changed to Crude Oil
1978-03-11 Well Mode changed to Suspended
1980-05-01 Well Fluid changed to Crude Oil
1980-05-01 Well Mode changed to Pumping
1983-01-31 Well Fluid changed to Crude Oil
1983-01-31 Well Mode changed to Suspended
1985-02-24 Well Log Performed
1985-02-25 Perforation Treatment Performed - Jet Perforation
1985-02-26 Well Fluid changed to Crude Oil
1985-02-26 Well Mode changed to Suspended
2001-10-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-10-30 Perforation 2087.00 2089.10 7
1970-12-09 Perforation 2129.00 2129.30 7
1971-01-07 Cement Squeeze 2087.00 2089.10 0
1971-01-09 Acid Treatment 2113.80 2129.30 0
1971-02-21 Cement Squeeze 2087.00 2089.10 0
1971-02-22 Cement Squeeze 2113.80 2129.30 0
1971-02-23 Perforation 2113.20 2115.30 7
1971-02-23 Perforation 2116.50 2116.80 7
1971-02-23 Perforation 2117.80 2118.10 7
1971-02-23 Perforation 2119.00 2119.30 7
1971-02-23 Perforation 2120.80 2121.40 7
1962-10-31 Acid Treatment 2087.00 2089.10 0
1971-02-23 Perforation 2122.00 2122.30 7
1971-02-23 Perforation 2123.80 2126.90 7
1971-02-23 Perforation 2127.50 2128.10 7
1971-02-23 Perforation 2128.70 2129.30 7
1971-02-23 Perforation 2132.40 2133.00 7
1971-02-23 Perforation 2133.60 2136.60 7
1971-02-23 Perforation 2137.60 2138.20 7
1971-02-23 Perforation 2138.50 2139.10 7
1971-02-23 Perforation 2139.70 2140.30 7
1971-02-23 Perforation 2140.60 2142.10 7
1970-12-09 Perforation 2113.80 2115.60 7
1971-02-23 Perforation 2143.70 2144.30 7
1971-02-23 Acid Treatment 2113.20 2144.30 0
1976-11-11 Perforation 2132.40 2133.00 7
1976-11-11 Perforation 2133.60 2136.60 7
1976-11-11 Perforation 2138.50 2139.10 7
1976-11-11 Perforation 2139.70 2142.10 7
1976-11-12 Acid Treatment 2132.40 2142.10 0
1976-11-13 Acid Treatment 2132.40 2142.10 0
1976-11-18 Fracture 2132.40 2142.10 0
1985-02-25 Perforation 2071.40 2073.90 13
1970-12-09 Perforation 2116.80 2118.40 7
1970-12-09 Perforation 2119.30 2119.60 7
1970-12-09 Perforation 2121.10 2121.70 7
1970-12-09 Perforation 2122.30 2122.60 7
1970-12-09 Perforation 2124.20 2127.20 7
1970-12-09 Perforation 2127.80 2128.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 595 0.0 0.0 0.0
1977 1632 0.0 0.0 0.0
1980 196 0.0 0.0 0.0
1981 308 0.0 0.0 0.0

For data sources see[5]

References