X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395031808003

Well Details

Well ID: 0395031808003
Loading map...
Location: 00/08-18-039-03W5/3
Location Alias: 00/08-18-39-03 W5M
Location Alias 2: 00/08-18-039-03 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 18
County/Municipality: Lacombe County
Well Name: NALR MEDR 8-18-39-3
Operator Name: NAL Resources Limited
License Number: 0026056
License Date: 1964-05-06
License Status: Issued
Spud Date: 1964-05-18
Final Drill Date: 1964-06-10
Well Total Depth: 2207.70 m
Surface Hole Latitude: 52.354395
Surface Hole Longitude: -114.412508

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-05-06 Obtained License
1964-05-19 Lost Circulation Occurred
1964-05-21 Lost Circulation Occurred
1964-06-07 Drill Stem Test Performed
1964-06-10 Finished Drilling
1964-06-11 Drill Stem Test Performed
1964-06-12 Drill Stem Test Performed
1964-06-14 Production Casing Operation Performed
1964-06-15 Perforation Treatment Performed - Jet Perforation
1964-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-06-29 Perforation Treatment Performed - Fractured
1964-07-10 Perforation Treatment Performed - Cement Squeeze
1964-07-12 Perforation Treatment Performed - Bullet Perforation
1964-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-04 Perforation Treatment Performed - Jet Perforation
1964-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-04 Perforation Treatment Performed - Cement Squeeze
1965-11-12 Perforation Treatment Performed - Jet Perforation
1965-11-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-09 Perforation Treatment Performed - Jet Perforation
1982-12-15 Perforation Treatment Performed - Jet Perforation
1982-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-11-30 Well Mode changed to Drilled and Cased
1994-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Perforation Treatment Performed - Cement Squeeze
1994-12-20 Perforation Treatment Performed - Jet Perforation
1994-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-05 Well Began Production
1995-01-05 Well Fluid changed to Crude Oil
1995-01-05 Well Mode changed to Flowing
1995-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-18 Well Fluid changed to Crude Oil
1995-05-18 Well Mode changed to Pumping
2001-07-08 Well Log Performed
2001-07-09 Perforation Treatment Performed - Jet Perforation
2001-07-09 Well Log Performed
2001-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-13 Plug Back Performed
2001-07-13 Well Fluid changed to Crude Oil
2001-07-13 Well Mode changed to Abandoned Zone
2001-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-07-14 Plug Back Performed
2001-07-17 Perforation Treatment Performed - Jet Perforation
2001-07-18 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-15 Perforation 2155.50 2156.80 13
1964-08-06 Acid Treatment 2158.60 2159.80 0
1965-11-04 Cement Squeeze 2139.40 2140.00 0
1965-11-12 Perforation 2139.40 2140.00 0
1965-11-12 Perforation 2155.50 2156.80 0
1965-11-13 Acid Treatment 2155.50 2156.80 0
1965-11-22 Acid Treatment 2155.50 2156.80 0
1965-12-03 Acid Treatment 2139.40 2140.00 0
1982-12-09 Perforation 2141.20 2144.00 13
1982-12-15 Perforation 2151.80 2154.50 13
1982-12-16 Acid Treatment 2151.80 2159.80 0
1964-06-15 Perforation 2140.90 2141.50 13
1982-12-17 Acid Treatment 2151.80 2159.80 0
1982-12-17 Acid Treatment 2139.40 2144.00 0
1994-11-30 Perforation 2173.50 2180.00 13
1994-11-30 Perforation 2186.50 2192.50 13
1994-12-05 Acid Treatment 2139.40 2192.50 0
1994-12-08 Cement Squeeze 2139.40 2159.80 0
1994-12-20 Perforation 2173.50 2180.00 13
1994-12-27 Acid Treatment 2173.50 2180.00 0
1995-05-17 Acid Treatment 2173.50 2180.00 0
2001-07-09 Perforation 2112.50 2116.50 17
1964-06-28 Acid Treatment 2140.90 2141.50 0
2001-07-13 Packing Device Capped w/Cement 2122.00 2130.00 0
2001-07-14 Packing Device Capped w/Cement 2092.00 2100.00 0
2001-07-17 Perforation 1646.50 1650.00 17
2001-07-18 Fracture 1646.50 1650.00 0
1964-06-29 Fracture 2140.90 2141.50 0
1964-07-10 Cement Squeeze 2140.90 2156.80 0
1964-07-12 Bullet Perforation 2158.60 2159.80 13
1964-07-13 Acid Treatment 2158.60 2159.80 0
1964-08-04 Perforation 2139.40 2140.00 13
1964-08-05 Acid Treatment 2139.40 2140.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 8012 0.0 0.0 0.0
1996 7931 0.0 0.0 0.0
1997 8444 0.0 0.0 0.0
1998 8532 0.0 0.0 0.0
1999 4923 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1964-05-19 Lost Circulation 23.50 23.50
1964-05-21 Lost Circulation 204.20 204.20

For data sources see[6]

References