X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395031303000

Well Details

Well ID: 0395031303000
Loading map...
Location: 00/03-13-039-03W5/0
Location Alias: 00/03-13-39-03 W5M
Location Alias 2: 00/03-13-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 13
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 3-13-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0085834
License Date: 1980-09-24
License Status: Suspension
Spud Date: 1980-09-26
Final Drill Date: 1980-10-14
Well Total Depth: 2172.00 m
Surface Hole Latitude: 52.350434
Surface Hole Longitude: -114.304543

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-24 Obtained License
1980-10-14 Finished Drilling
1980-10-14 Well Mode changed to Drilled and Cased
1980-10-16 Drill Stem Test Performed
1980-10-18 Drill Stem Test Performed
1980-10-20 Production Casing Operation Performed
1980-11-03 Perforation Treatment Performed - Jet Perforation
1980-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-06 Well Began Production
1980-11-06 Well Fluid changed to Crude Oil
1980-11-06 Well Mode changed to Flowing
1981-01-19 Perforation Treatment Performed - Jet Perforation
1981-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-01-29 Perforation Treatment Performed - Fractured
1981-02-01 Well Fluid changed to Crude Oil
1981-02-01 Well Mode changed to Flowing
1981-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-16 Perforation Treatment Performed - Jet Perforation
1981-03-16 Well Fluid changed to Crude Oil
1981-03-16 Well Mode changed to Flowing
1981-12-22 Well Fluid changed to Crude Oil
1981-12-22 Well Mode changed to Suspended
1982-08-16 Perforation Treatment Performed - Fractured
1983-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-08-18 Well Fluid changed to Crude Oil
1983-08-18 Well Mode changed to Abandoned Zone
1997-11-29 Perforation Treatment Performed - Cement Squeeze
1997-11-29 Plug Back Performed
1997-12-03 Perforation Treatment Performed - Jet Perforation
1997-12-03 Well Fluid changed to Crude Oil
1997-12-03 Well Mode changed to Flowing
2003-09-01 Well Fluid changed to Crude Oil
2003-09-01 Well Mode changed to Suspended
2004-10-20 Well Fluid changed to Crude Oil
2004-10-20 Well Mode changed to Flowing
2004-11-01 Well Fluid changed to Crude Oil
2004-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-03 Perforation 2143.00 2145.00 7
1983-08-18 Packing Device Capped w/Cement 2138.00 2140.00 0
1997-11-29 Cement Squeeze 1882.00 2074.00 0
1997-12-03 Perforation 2143.00 2145.00 13
1980-11-06 Acid Treatment 2143.00 2145.00 0
1981-01-19 Perforation 2073.30 2074.00 14
1981-01-22 Acid Treatment 2073.30 2074.00 0
1981-01-23 Acid Treatment 2073.30 2074.00 0
1981-01-29 Fracture 2073.30 2074.00 0
1981-03-06 Acid Treatment 2073.30 2074.00 0
1981-03-16 Perforation 1882.00 1883.50 7
1982-08-16 Fracture 2073.30 2074.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 906 0.0 0.0 0.0
1981 446 0.0 0.0 0.0
1997 439 0.0 0.0 0.0
1998 395 0.0 0.0 0.0
1999 2355 0.0 0.0 0.0
2000 2465 0.0 0.0 0.0
2001 3893 0.0 0.0 0.0
2002 4401 0.0 0.0 0.0
2004 115 0.0 0.0 0.0

For data sources see[5]

References