X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395030510003

Well Details

Well ID: 0395030510003
Loading map...
Location: 00/10-05-039-03W5/3
Location Alias: 00/10-05-39-03 W5M
Location Alias 2: 00/10-05-039-03 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 05
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 10-5-39-3
Operator Name: Cenovus Energy Inc.
License Number: 0020568
License Date: 1961-03-16
License Status: Abandoned
Spud Date: 1961-03-20
Final Drill Date: 1961-04-17
Well Total Depth: 2232.40 m
Surface Hole Latitude: 52.328426
Surface Hole Longitude: -114.394421

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-16 Obtained License
1961-04-08 Drill Stem Test Performed
1961-04-10 Drill Stem Test Performed
1961-04-12 Drill Stem Test Performed
1961-04-16 Drill Stem Test Performed
1961-04-17 Finished Drilling
1961-04-17 Production Casing Operation Performed
1961-04-17 Well Mode changed to Drilled and Cased
1961-04-18 Drill Stem Test Performed
1961-04-22 Perforation Treatment Performed - Open-Hole Completion
1961-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-03 Perforation Treatment Performed - Cement Plug
1961-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-08 Perforation Treatment Performed - Jet Perforation
1961-05-12 Perforation Treatment Performed - Acid Wash - No Pressure
1961-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1961-05-12 Perforation Treatment Performed - Jet Perforation
1961-05-19 Perforation Treatment Performed - Cement Squeeze
1961-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-05-22 Perforation Treatment Performed - Jet Perforation
1961-06-01 Perforation Treatment Performed - Fractured
1968-05-23 Perforation Treatment Performed - Jet Perforation
1968-05-26 Perforation Treatment Performed - Condensate Squeeze
1971-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-17 Perforation Treatment Performed - Acid Wash - No Pressure
1988-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-09-30 Perforation Treatment Performed - Cement Squeeze
1993-10-07 Perforation Treatment Performed - Jet Perforation
1993-10-09 Perforation Treatment Performed - Open-Hole Completion
1993-10-09 Well Log Performed
1993-10-10 Perforation Treatment Performed - Jet Perforation
1993-10-12 Well Log Performed
1993-10-13 Well Log Performed
1993-10-14 Perforation Treatment Performed - Cement Squeeze
1993-10-14 Perforation Treatment Performed - Jet Perforation
1993-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-06-21 Well Log Performed
1994-06-22 Perforation Treatment Performed - Fractured
1994-06-22 Perforation Treatment Performed - Jet Perforation
2007-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-26 Plug Back Performed
2007-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-07-27 Plug Back Performed
2007-07-27 Well Log Performed
2007-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-08-02 Perforation Treatment Performed - Jet Perforation
2007-08-02 Plug Back Performed
2007-08-02 Well Log Performed
2007-08-02 Well Mode changed to Abandoned Zone
2007-08-03 Perforation Treatment Performed - Fractured
2013-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-12 Plug Back Performed
2013-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-13 Perforation Treatment Performed - Jet Perforation
2013-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-14 Perforation Treatment Performed - Remedial Casing
2013-09-15 Perforation Treatment Performed - Jet Perforation
2013-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-16 Perforation Treatment Performed - Jet Perforation
2013-09-16 Perforation Treatment Performed - Remedial Casing
2013-09-17 Perforation Treatment Performed - Remedial Casing
2013-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-09-18 Perforation Treatment Performed - Jet Perforation
2013-09-24 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-22 Open Hole/Barefoot Completion 2212.80 2232.40 0
1961-05-12 Perforation 2197.60 2199.40 13
1961-05-12 Acid Wash 2197.60 2199.40 0
1961-05-19 Cement Squeeze 2197.60 2199.40 0
1961-05-22 Perforation 2166.50 2170.20 13
1961-05-22 Acid Treatment 2166.50 2170.20 0
1961-06-01 Fracture 2166.50 2170.20 0
1968-05-23 Perforation 2164.70 2166.50 13
1968-05-23 Perforation 2170.20 2172.90 13
1968-05-26 Condensate Squeeze 2164.70 2172.90 0
1971-02-17 Acid Wash 2164.70 2172.90 0
1961-04-24 Acid Treatment 2212.80 2232.40 0
1971-02-17 Acid Treatment 2164.70 2172.90 0
1988-07-06 Acid Treatment 2164.70 2172.90 0
1993-09-30 Cement Squeeze 2164.70 2172.90 0
1993-10-07 Perforation 2202.20 2202.80 13
1993-10-07 Perforation 2204.30 2205.20 13
1993-10-07 Perforation 2205.80 2206.80 13
1993-10-07 Perforation 2208.30 2208.90 13
1993-10-09 Open Hole/Barefoot Completion 2212.80 2232.40 0
1993-10-10 Perforation 2213.40 2216.40 16
1993-10-14 Cement Squeeze 2202.20 2208.90 0
1961-05-03 Cement Plug 2210.40 2214.70 0
1993-10-14 Perforation 2188.00 2196.50 16
1993-10-15 Acid Treatment 2188.00 2196.50 0
1994-06-22 Perforation 2123.00 2128.00 18
1994-06-22 Fracture 2123.70 2127.40 0
2007-07-26 Packing Device Capped w/Cement 2172.00 2180.00 0
2007-07-27 Packing Device Capped w/Cement 2152.00 2160.00 0
2007-08-02 Packing Device Capped w/Cement 2110.00 2118.00 0
2007-08-02 Perforation 1981.00 1985.00 17
2007-08-03 Fracture 1981.00 1985.00 0
2013-09-12 Packing Device Capped w/Cement 1966.00 1974.00 0
1961-05-08 Perforation 2202.20 2202.80 13
2013-09-13 Packing Device Capped w/Cement 1580.00 1588.00 0
2013-09-13 Perforation 1316.00 1317.00 14
2013-09-14 Remedial Casing Cementing 1316.00 1317.00 0
2013-09-14 Packing Device Capped w/Cement 1286.00 1306.00 0
2013-09-15 Perforation 1001.00 1002.00 14
2013-09-16 Remedial Casing Cementing 1001.00 1002.00 0
2013-09-16 Packing Device Capped w/Cement 971.00 991.00 0
2013-09-16 Perforation 536.00 537.00 14
2013-09-16 Remedial Casing Cementing 536.00 537.00 0
2013-09-16 Perforation 501.00 502.00 14
1961-05-08 Perforation 2204.30 2205.20 13
2013-09-16 Packing Device Capped w/Cement 525.00 533.00 0
2013-09-17 Remedial Casing Cementing 501.00 502.00 0
2013-09-18 Packing Device Capped w/Cement 490.00 498.00 0
2013-09-18 Perforation 375.00 376.00 14
2013-09-18 Perforation 336.00 337.00 14
2013-09-18 Packing Device Capped w/Cement 362.00 370.00 0
2013-09-18 Packing Device Capped w/Cement 324.00 332.00 0
2013-09-18 Perforation 281.00 282.00 14
2013-09-18 Packing Device Capped w/Cement 264.00 272.00 0
1961-05-08 Perforation 2205.80 2206.80 13
1961-05-08 Perforation 2208.30 2208.90 13
1961-05-08 Acid Treatment 2202.20 2208.90 0
1961-05-12 Packing Device Capped w/Cement 2200.70 2200.70 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-24 No Incident Encountered 0.00 0.00

For data sources see[5]

References