X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395030304000

Well Details

Well ID: 0395030304000
Loading map...
Location: 00/04-03-039-03W5/0
Location Alias: 00/04-03-39-03 W5M
Location Alias 2: 00/04-03-039-03 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 03
Section: 03
County/Municipality: Lacombe County
Well Name: PEMBINA ET AL MEDR 4-3-39-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0041363
License Date: 1971-11-19
License Status: RecCertified
Spud Date: 1971-11-24
Final Drill Date: 1971-12-11
Well Total Depth: 2245.50 m
Surface Hole Latitude: 52.321439
Surface Hole Longitude: -114.357717

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-11-19 Obtained License
1971-12-06 Drill Stem Test Performed
1971-12-10 Drill Stem Test Performed
1971-12-11 Finished Drilling
1971-12-11 Well Mode changed to Drilled and Cased
1971-12-14 Drill Stem Test Performed
1971-12-18 Production Casing Operation Performed
1971-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-12-31 Perforation Treatment Performed - Jet Perforation
1972-02-04 Perforation Treatment Performed - Jet Perforation
1972-02-06 Perforation Treatment Performed - Cement Squeeze
1972-02-16 Perforation Treatment Performed - Jet Perforation
1972-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-02-26 Well Began Production
1972-02-26 Well Fluid changed to Crude Oil
1972-02-26 Well Mode changed to Pumping
1972-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-07-10 Well Fluid changed to Crude Oil
1972-07-10 Well Mode changed to Suspended
1977-01-07 Well Fluid changed to Crude Oil
1977-01-07 Well Mode changed to Pumping
1991-12-31 Well Log Performed
1992-01-01 Perforation Treatment Performed - Jet Perforation
1992-01-04 Well Log Performed
1992-01-08 Well Log Performed
1992-01-09 Perforation Treatment Performed - Jet Perforation
1992-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-14 Well Log Performed
1992-12-14 Well Fluid changed to Crude Oil
1992-12-14 Well Mode changed to Suspended
1993-01-25 Well Log Performed
1997-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-20 Perforation Treatment Performed - Cement Plug
1997-06-20 Plug Back Performed
1997-06-20 Well Fluid changed to Crude Oil
1997-06-20 Well Log Performed
1997-06-20 Well Mode changed to Abandoned Zone
1997-06-21 Perforation Treatment Performed - Jet Perforation
1997-06-21 Perforation Treatment Performed - Remedial Casing
1997-06-22 Perforation Treatment Performed - Jet Perforation
1997-06-22 Perforation Treatment Performed - Remedial Casing
1997-06-24 Perforation Treatment Performed - Jet Perforation
1997-06-24 Perforation Treatment Performed - Remedial Casing
1997-08-02 Well Abandoned
1997-08-02 Well Fluid changed to Crude Oil
1997-08-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-31 Perforation 2201.00 2202.20 13
1972-03-07 Acid Treatment 2201.00 2212.50 0
1992-01-01 Perforation 2203.10 2205.20 13
1992-01-01 Perforation 2206.40 2208.30 13
1992-01-01 Perforation 2210.70 2214.70 13
1992-01-09 Perforation 2183.60 2189.10 13
1992-01-09 Perforation 2194.30 2197.60 13
1992-01-10 Acid Treatment 2183.60 2214.70 0
1997-06-20 Packing Device Capped w/Cement 2058.10 2182.00 0
1997-06-20 Cement Plug 1107.90 1303.00 0
1997-06-20 Cement Plug 713.60 781.30 0
1971-12-31 Perforation 2203.10 2205.20 13
1997-06-21 Perforation 670.00 671.00 13
1997-06-21 Remedial Casing Cementing 670.00 671.00 0
1997-06-22 Perforation 480.00 481.00 13
1997-06-22 Remedial Casing Cementing 480.00 481.00 0
1997-06-24 Perforation 230.00 231.00 13
1997-06-24 Remedial Casing Cementing 230.00 231.00 0
1971-12-31 Perforation 2206.40 2208.30 13
1971-12-31 Perforation 2209.20 2212.80 13
1971-12-31 Acid Treatment 2201.00 2212.80 0
1972-02-04 Perforation 2187.50 2189.10 7
1972-02-06 Cement Squeeze 2187.50 2189.10 0
1972-02-16 Perforation 2208.90 2212.50 13
1972-02-17 Acid Treatment 2208.90 2212.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1505 0.0 0.0 0.0
1977 5232 0.0 0.0 0.0
1978 3192 0.0 0.0 0.0
1979 2075 0.0 0.0 0.0
1980 2884 0.0 0.0 0.0
1981 2839 0.0 0.0 0.0
1982 2894 0.0 0.0 0.0
1983 5653 0.0 0.0 0.0
1984 8156 0.0 0.0 0.0
1985 8657 0.0 0.0 0.0
1986 8505 0.0 0.0 0.0
1987 8759 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8731 0.0 0.0 0.0
1990 8399 0.0 0.0 0.0
1991 8103 0.0 0.0 0.0
1992 4495 0.0 0.0 0.0

For data sources see[5]

References