X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395021716002

Well Details

Well ID: 0395021716002
Loading map...
Location: 00/16-17-039-02W5/2
Location Alias: 00/16-17-39-02 W5M
Location Alias 2: 00/16-17-039-02 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 02
Section: 17
County/Municipality: Lacombe County
Well Name: CVE MEDRIV 16-17-39-2
Operator Name: Cenovus Energy Inc.
License Number: 0106056
License Date: 1984-02-20
License Status: RecCertified
Spud Date: 1984-02-22
Final Drill Date: 1984-03-04
Well Total Depth: 1940.00 m
Surface Hole Latitude: 52.360076
Surface Hole Longitude: -114.246552

For data sources see[1][2]

Well History

Date Event
1984-02-20 Obtained License
1984-02-22 Lost Circulation Occurred
1984-03-04 Finished Drilling
1984-03-04 Well Log Performed
1984-03-04 Well Mode changed to Drilled and Cased
1984-03-06 Production Casing Operation Performed
1984-05-03 Well Log Performed
1984-05-05 Perforation Treatment Performed - Jet Perforation
1984-05-10 Perforation Treatment Performed - Fractured
1984-05-14 Well Log Performed
1997-03-25 Perforation Treatment Performed - Jet Perforation
1998-04-02 Well Log Performed
1998-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-04-03 Perforation Treatment Performed - Jet Perforation
1998-04-03 Plug Back Performed
1998-04-04 Perforation Treatment Performed - Cement Squeeze
1998-04-07 Perforation Treatment Performed - Jet Perforation
1998-04-08 Perforation Treatment Performed - Cement Squeeze
1998-04-14 Well Log Performed
1998-04-15 Perforation Treatment Performed - Jet Perforation
1998-04-17 Perforation Treatment Performed - Fractured
1998-09-01 Well Began Production
1998-09-01 Well Fluid changed to Crude Oil
1998-09-01 Well Mode changed to Pumping
1999-10-01 Well Fluid changed to Crude Oil
1999-10-01 Well Mode changed to Suspended
2011-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-28 Plug Back Performed
2011-07-28 Well Fluid changed to Crude Oil
2011-07-28 Well Mode changed to Abandoned Zone
2011-07-29 Perforation Treatment Performed - Jet Perforation
2011-07-29 Well Log Performed
2011-07-30 Perforation Treatment Performed - Remedial Casing
2011-07-31 Perforation Treatment Performed - Jet Perforation
2011-07-31 Well Log Performed
2011-08-01 Perforation Treatment Performed - Remedial Casing
2011-08-02 Perforation Treatment Performed - Jet Perforation
2011-08-02 Well Log Performed
2011-08-03 Perforation Treatment Performed - Remedial Casing
2011-09-29 Well Abandoned
2011-09-29 Well Fluid changed to Crude Oil
2011-09-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-05-05 Perforation 1887.50 1888.00 13
1998-04-03 Perforation 1325.00 1325.80 13
1998-04-03 Perforation 1175.00 1176.00 13
1998-04-04 Cement Squeeze 1325.00 1325.80 0
1998-04-07 Perforation 1251.00 1252.00 13
1998-04-07 Perforation 1201.00 1202.00 13
1998-04-08 Cement Squeeze 1251.00 1252.00 0
1998-04-15 Perforation 1270.00 1274.00 13
1998-04-15 Perforation 1275.00 1277.00 13
1998-04-17 Fracture 1270.00 1277.00 0
2011-07-28 Packing Device Capped w/Cement 1257.00 1265.00 0
1984-05-05 Perforation 1894.00 1895.00 13
2011-07-28 Packing Device Capped w/Cement 1162.00 1170.00 0
2011-07-29 Perforation 1032.00 1033.00 17
2011-07-30 Remedial Casing Cementing 1032.00 1033.00 0
2011-07-31 Perforation 532.00 533.00 17
2011-08-01 Remedial Casing Cementing 532.00 533.00 0
2011-08-02 Perforation 409.00 410.00 17
2011-08-03 Remedial Casing Cementing 409.00 410.00 0
1984-05-05 Perforation 1895.50 1896.50 13
1984-05-05 Perforation 1897.00 1899.00 13
1984-05-10 Fracture 1887.50 1899.00 0
1997-03-25 Perforation 1894.00 1895.00 13
1997-03-25 Perforation 1895.50 1896.50 13
1997-03-25 Perforation 1897.00 1899.00 13
1998-04-03 Packing Device Capped w/Cement 1872.00 1880.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2574 0.0 0.0 0.0
1999 5594 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-02-22 Lost Circulation 61.00 61.00

For data sources see[6]

References