X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395011011000

Well Details

Well ID: 0395011011000
Loading map...
Location: 00/11-10-039-01W5/0
Location Alias: 00/11-10-39-01 W5M
Location Alias 2: 00/11-10-039-01 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 01
Section: 10
County/Municipality: Red Deer County
Well Name: OMERS ENERGY PREVO 11-10-39-1
Operator Name: Gain Energy Ltd.
License Number: 0048307
License Date: 1973-12-11
License Status: Abandoned
Spud Date: 1973-12-15
Final Drill Date: 1973-12-29
Well Total Depth: 2057.40 m
Surface Hole Latitude: 52.344075
Surface Hole Longitude: -114.066194

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-12-11 Obtained License
1973-12-29 Finished Drilling
1973-12-31 Drill Stem Test Performed
1974-01-02 Production Casing Operation Performed
1974-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-10 Perforation Treatment Performed - Jet Perforation
1974-01-10 Well Log Performed
1974-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-18 Perforation Treatment Performed - Jet Perforation
1974-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-23 Perforation Treatment Performed - Jet Perforation
1974-02-01 Well Mode changed to Drilled and Cased
1976-02-21 Well Began Production
1976-02-21 Well Fluid changed to Gas
1976-02-21 Well Mode changed to Flowing
1989-08-09 Well Log Performed
1989-08-10 Perforation Treatment Performed - Cement Squeeze
1989-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-08-12 Perforation Treatment Performed - Jet Perforation
1989-08-12 Well Log Performed
1989-08-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-07-01 Well Fluid changed to Gas
2013-07-01 Well Mode changed to Suspended
2015-12-17 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2015-12-17 Plug Back Performed
2015-12-17 Well Fluid changed to Gas
2015-12-17 Well Log Performed
2015-12-17 Well Mode changed to Abandoned Zone
2015-12-18 Well Log Performed
2015-12-19 Well Log Performed
2015-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-20 Plug Back Performed
2016-01-22 Perforation Treatment Performed - Jet Perforation
2016-01-22 Well Log Performed
2016-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-24 Perforation Treatment Performed - Jet Perforation
2016-01-24 Plug Back Performed
2016-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-25 Plug Back Performed
2016-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-30 Perforation Treatment Performed - Jet Perforation
2016-01-30 Plug Back Performed
2016-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-01-31 Plug Back Performed
2016-02-05 Well Log Performed
2016-02-09 Perforation Treatment Performed - Jet Perforation
2016-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-10 Plug Back Performed
2016-02-10 Well Abandoned
2016-02-10 Well Fluid changed to Gas
2016-02-10 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-01-10 Perforation 2030.30 2034.50 7
1989-08-12 Perforation 1997.00 1998.30 13
1989-08-12 Perforation 2006.80 2014.10 13
1989-08-12 Packing Device Capped w/Cement 2025.00 2027.00 0
1989-08-13 Acid Treatment 1978.70 2014.10 0
2015-12-17 Packing Dev Cpd w/Res-Gyp Cem 1992.00 1995.00 0
2015-12-20 Packing Device Capped w/Cement 1956.00 1964.00 0
2016-01-22 Perforation 1501.00 1520.00 8
2016-01-22 Perforation 1200.00 1201.00 8
2016-01-24 Packing Device Capped w/Cement 1150.00 1158.00 0
2016-01-24 Perforation 932.00 933.00 8
1974-01-10 Acid Treatment 2030.30 2034.50 0
2016-01-25 Packing Device Capped w/Cement 911.90 920.90 0
2016-01-30 Packing Device Capped w/Cement 532.00 540.00 0
2016-01-30 Perforation 475.00 476.00 8
2016-01-31 Packing Device Capped w/Cement 456.00 465.00 0
2016-02-09 Perforation 378.00 379.00 8
2016-02-10 Packing Device Capped w/Cement 348.00 395.00 0
1974-01-18 Perforation 2010.20 2012.90 7
1974-01-18 Acid Treatment 2010.20 2012.90 0
1974-01-23 Perforation 1978.80 1980.60 7
1974-01-23 Acid Treatment 1978.80 1980.60 0
1989-08-10 Cement Squeeze 2030.30 2034.50 0
1989-08-12 Perforation 1978.70 1980.60 13
1989-08-12 Perforation 1986.60 1989.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5351 0.0 0.0 0.0
1977 6716 0.0 0.0 0.0
1978 4371 0.0 0.0 0.0
1979 3743 0.0 0.0 0.0
1980 4612 0.0 0.0 0.0
1981 4610 0.0 0.0 0.0
1982 3818 0.0 0.0 0.0
1983 3935 0.0 0.0 0.0
1984 5237 0.0 0.0 0.0
1985 3664 0.0 0.0 0.0
1986 1454 0.0 0.0 0.0
1987 2844 0.0 0.0 0.0
1988 5843 0.0 0.0 0.0
1989 5489 0.0 0.0 0.0
1990 8086 0.0 0.0 0.0
1991 8571 0.0 0.0 0.0
1992 8350 0.0 0.0 0.0
1993 8528 0.0 0.0 0.0
1994 8642 0.0 0.0 0.0
1995 8023 0.0 0.0 0.0
1996 8520 0.0 0.0 0.0
1997 8425 0.0 0.0 0.0
1998 8643 0.0 0.0 0.0
1999 8437 0.0 0.0 0.0
2000 8556 0.0 0.0 0.0
2001 8376 0.0 0.0 0.0
2002 6569 0.0 0.0 0.0
2003 8478 0.0 0.0 0.0
2004 8456 0.0 0.0 0.0
2005 8369 0.0 0.0 0.0
2006 8621 0.0 0.0 0.0
2007 8370 0.0 0.0 0.0
2008 8752 0.0 0.0 0.0
2009 8758 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 3143 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-17 No Incident Encountered 0.00 0.00
2015-12-21 No Incident Encountered 0.00 0.00
2016-02-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References