X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395010807000

Well Details

Well ID: 0395010807000
Loading map...
Location: 00/07-08-039-01W5/0
Location Alias: 00/07-08-39-01 W5M
Location Alias 2: 00/07-08-039-01 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 01
Section: 08
County/Municipality: Lacombe County
Well Name: EET MGMT CORP ET AL PREVO 7-8-39-1
Operator Name: Summerfield Energy Inc.
License Number: 0116694
License Date: 1985-08-06
License Status: Abandoned
Spud Date: 1985-08-17
Final Drill Date: 1985-09-20
Well Total Depth: 2674.50 m
Surface Hole Latitude: 52.352535
Surface Hole Longitude: -114.096165

For data sources see[1][2]

Well History

Date Event
1985-08-06 Obtained License
1985-08-17 Direction Drilling Operation Performed - Deviate
1985-08-17 Lost Circulation Occurred
1985-08-21 Lost Circulation Occurred
1985-08-23 Surface Casing Operation Performed
1985-09-16 Well Log Performed
1985-09-20 Finished Drilling
1985-09-20 Well Log Performed
1985-09-21 Well Log Performed
1985-09-22 Well Log Performed
1985-09-24 Production Casing Operation Performed
1985-09-24 Rig Released
1985-09-24 Well Mode changed to Drilled and Cased
1985-10-26 Well Log Performed
1985-10-27 Perforation Treatment Performed - Jet Perforation
1985-10-28 Perforation Treatment Performed - Jet Perforation
1985-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-05 Well Log Performed
1985-11-06 Perforation Treatment Performed - Jet Perforation
1985-11-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-15 Well Began Production
1986-12-15 Well Fluid changed to Gas
1986-12-15 Well Mode changed to Flowing
1993-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-14 Perforation Treatment Performed - Jet Perforation
1993-05-14 Well Fluid changed to Gas
1993-05-14 Well Mode changed to Flowing
1993-05-19 Perforation Treatment Performed - Fractured
1993-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-10-06 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2017-10-06 Plug Back Performed
2017-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-08 Plug Back Performed
2017-10-08 Well Fluid changed to Gas
2017-10-08 Well Mode changed to Abandoned Zone
2017-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-09 Plug Back Performed
2017-10-11 Perforation Treatment Performed - Jet Perforation
2017-10-12 Perforation Treatment Performed - Cement Squeeze
2017-10-13 Perforation Treatment Performed - Jet Perforation
2017-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-14 Perforation Treatment Performed - Cement Squeeze
2017-10-14 Plug Back Performed
2017-10-14 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1985-08-17 33.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-10-27 Perforation 2630.60 2637.00 7
1997-01-07 Acid Treatment 2324.00 2329.00 0
2017-10-06 Packing Dev Cpd w/Res-Gyp Cem 2621.20 2626.00 0
2017-10-08 Packing Device Capped w/Cement 2579.50 2592.00 0
2017-10-09 Packing Device Capped w/Cement 2300.90 2315.00 0
2017-10-11 Perforation 1400.00 1400.10 1
2017-10-11 Perforation 1387.00 1387.10 1
2017-10-11 Perforation 1346.00 1346.10 1
2017-10-11 Perforation 1323.00 1323.10 1
2017-10-11 Perforation 1280.00 1280.10 1
2017-10-11 Perforation 1221.00 1221.10 1
1985-10-28 Perforation 2628.00 2630.60 7
2017-10-11 Perforation 1175.00 1175.10 1
2017-10-11 Perforation 1136.00 1136.10 1
2017-10-11 Perforation 1080.00 1080.10 1
2017-10-11 Perforation 910.00 910.10 1
2017-10-11 Perforation 885.00 885.10 1
2017-10-12 Cement Squeeze 885.00 1400.10 0
2017-10-13 Perforation 590.00 590.10 1
2017-10-14 Cement Squeeze 590.00 590.10 0
2017-10-14 Packing Device Capped w/Cement 553.00 583.00 0
1985-10-29 Acid Treatment 2628.00 2637.00 0
1985-11-06 Perforation 2599.00 2620.00 13
1985-11-21 Acid Treatment 2599.00 2620.00 0
1993-05-14 Perforation 2324.00 2329.00 14
1993-05-14 Acid Treatment 2324.00 2329.00 0
1993-05-19 Fracture 2324.00 2329.00 0
1993-06-08 Acid Treatment 2324.00 2329.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 284 0.0 0.0 0.0
1987 7657 0.0 0.0 0.0
1988 7909 0.0 0.0 0.0
1989 8679 0.0 0.0 0.0
1990 8485 0.0 0.0 0.0
1991 8629 0.0 0.0 0.0
1992 8642 0.0 0.0 0.0
1993 7948 0.0 0.0 0.0
1994 8560 0.0 0.0 0.0
1995 8444 0.0 0.0 0.0
1996 8571 0.0 0.0 0.0
1997 8659 0.0 0.0 0.0
1998 8637 0.0 0.0 0.0
1999 8710 0.0 0.0 0.0
2000 8634 0.0 0.0 0.0
2001 8544 0.0 0.0 0.0
2002 8372 0.0 0.0 0.0
2003 8141 0.0 0.0 0.0
2004 8559 0.0 0.0 0.0
2005 8456 0.0 0.0 0.0
2006 6806 0.0 0.0 0.0
2007 7411 0.0 0.0 0.0
2008 7060 0.0 0.0 0.0
2009 8069 0.0 0.0 0.0
2010 8641 0.0 0.0 0.0
2011 8721 0.0 0.0 0.0
2012 8063 0.0 0.0 0.0
2013 8470 0.0 0.0 0.0
2014 8259 0.0 0.0 0.0
2015 8715 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-08-17 Lost Circulation 45.00 59.00
1985-08-21 Lost Circulation 41.00 41.00
2017-10-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References