If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394273214002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.382531,"lon":-113.857971,"icon":""}]} |
Location: 00/14-32-039-27W4/2 | |
Location Alias: 00/14-32-39-27 W4M | |
Location Alias 2: 00/14-32-039-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 27 | |
Section: 32 | |
County/Municipality: Lacombe County | |
Well Name: VESTA JOFFRE 14-32-39-27 | |
Operator Name: Vesta Energy Ltd. | |
License Number: 0477064 | |
License Date: 2015-10-02 | |
License Status: Amended | |
Spud Date: 2015-10-20 | |
Final Drill Date: 2015-11-08 | |
Well Total Depth: 4639.00 m | |
Surface Hole Latitude: 52.382531 | |
Surface Hole Longitude: -113.857971 |
Date | Event |
---|---|
2015-10-02 | Obtained License |
2015-10-17 | Conductor Casing Operation Performed |
2015-10-21 | Surface Casing Operation Performed |
2015-10-31 | Direction Drilling Operation Performed - Horizontal |
2015-11-08 | Finished Drilling |
2015-11-08 | Well Log Performed |
2015-11-08 | Well Mode changed to Drilled and Cased |
2015-11-09 | Production Casing Operation Performed |
2015-11-10 | Rig Released |
2016-02-04 | Perforation Treatment Performed - Jet Perforation |
2016-02-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-14 | Perforation Treatment Performed - Jet Perforation |
2016-02-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-15 | Perforation Treatment Performed - Jet Perforation |
2016-02-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-16 | Perforation Treatment Performed - Jet Perforation |
2016-02-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-17 | Perforation Treatment Performed - Jet Perforation |
2016-02-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-18 | Perforation Treatment Performed - Jet Perforation |
2016-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-19 | Perforation Treatment Performed - Jet Perforation |
2016-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-20 | Perforation Treatment Performed - Jet Perforation |
2016-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-21 | Perforation Treatment Performed - Jet Perforation |
2016-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-22 | Perforation Treatment Performed - Jet Perforation |
2016-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-02-23 | Perforation Treatment Performed - Jet Perforation |
2016-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-03-06 | Well Began Production |
2016-03-06 | Well Fluid changed to Crude Oil |
2016-03-06 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2015-10-31 | 2087.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-02-04 | Perforation | 4548.00 | 4600.00 | 12 |
2016-02-16 | Multi-Stage Fracture | 4314.00 | 4363.00 | 0 |
2016-02-16 | Perforation | 4259.00 | 4301.00 | 16 |
2016-02-16 | Multi-Stage Fracture | 4259.00 | 4301.00 | 0 |
2016-02-17 | Perforation | 4203.00 | 4252.00 | 12 |
2016-02-17 | Multi-Stage Fracture | 4203.00 | 4252.00 | 0 |
2016-02-17 | Perforation | 4147.00 | 4196.00 | 12 |
2016-02-17 | Multi-Stage Fracture | 4147.00 | 4196.00 | 0 |
2016-02-17 | Perforation | 4091.00 | 4140.00 | 12 |
2016-02-17 | Multi-Stage Fracture | 4091.00 | 4140.00 | 0 |
2016-02-17 | Perforation | 4035.00 | 4084.00 | 12 |
2016-02-04 | Multi-Stage Fracture | 4548.00 | 4600.00 | 0 |
2016-02-17 | Multi-Stage Fracture | 4035.00 | 4084.00 | 0 |
2016-02-18 | Perforation | 3979.00 | 4028.00 | 12 |
2016-02-18 | Multi-Stage Fracture | 3979.00 | 4028.00 | 0 |
2016-02-18 | Perforation | 3923.00 | 3972.00 | 12 |
2016-02-18 | Multi-Stage Fracture | 3923.00 | 3972.00 | 0 |
2016-02-18 | Perforation | 3867.00 | 3916.00 | 12 |
2016-02-18 | Multi-Stage Fracture | 3867.00 | 3916.00 | 0 |
2016-02-18 | Perforation | 3811.00 | 3860.00 | 12 |
2016-02-18 | Multi-Stage Fracture | 3811.00 | 3860.00 | 0 |
2016-02-18 | Perforation | 3755.00 | 3804.00 | 12 |
2016-02-14 | Perforation | 4484.00 | 4532.00 | 22 |
2016-02-18 | Multi-Stage Fracture | 3755.00 | 3804.00 | 0 |
2016-02-19 | Perforation | 3699.00 | 3748.00 | 12 |
2016-02-19 | Multi-Stage Fracture | 3699.00 | 3748.00 | 0 |
2016-02-19 | Perforation | 3643.00 | 3692.00 | 12 |
2016-02-19 | Multi-Stage Fracture | 3643.00 | 3692.00 | 0 |
2016-02-19 | Perforation | 3587.00 | 3636.00 | 12 |
2016-02-19 | Multi-Stage Fracture | 3587.00 | 3636.00 | 0 |
2016-02-20 | Perforation | 3531.00 | 3580.00 | 12 |
2016-02-20 | Multi-Stage Fracture | 3531.00 | 3580.00 | 0 |
2016-02-20 | Perforation | 3475.00 | 3524.00 | 12 |
2016-02-14 | Multi-Stage Fracture | 4484.00 | 4532.00 | 0 |
2016-02-20 | Multi-Stage Fracture | 3475.00 | 3524.00 | 0 |
2016-02-20 | Perforation | 3419.00 | 3468.00 | 12 |
2016-02-20 | Multi-Stage Fracture | 3419.00 | 3468.00 | 0 |
2016-02-20 | Perforation | 3363.00 | 3412.00 | 12 |
2016-02-20 | Multi-Stage Fracture | 3363.00 | 3412.00 | 0 |
2016-02-20 | Perforation | 3307.00 | 3356.00 | 12 |
2016-02-20 | Multi-Stage Fracture | 3307.00 | 3356.00 | 0 |
2016-02-21 | Perforation | 3251.00 | 3300.00 | 12 |
2016-02-21 | Multi-Stage Fracture | 3251.00 | 3300.00 | 0 |
2016-02-21 | Perforation | 3195.00 | 3244.00 | 12 |
2016-02-15 | Perforation | 4425.00 | 4467.00 | 22 |
2016-02-21 | Multi-Stage Fracture | 3195.00 | 3244.00 | 0 |
2016-02-21 | Perforation | 3139.00 | 3188.00 | 12 |
2016-02-21 | Multi-Stage Fracture | 3139.00 | 3188.00 | 0 |
2016-02-21 | Perforation | 3083.00 | 3132.00 | 12 |
2016-02-21 | Multi-Stage Fracture | 3083.00 | 3132.00 | 0 |
2016-02-21 | Perforation | 3027.00 | 3076.00 | 12 |
2016-02-21 | Multi-Stage Fracture | 3027.00 | 3076.00 | 0 |
2016-02-21 | Perforation | 2971.00 | 3020.00 | 12 |
2016-02-21 | Multi-Stage Fracture | 2971.00 | 3020.00 | 0 |
2016-02-22 | Perforation | 2915.00 | 2964.00 | 12 |
2016-02-15 | Multi-Stage Fracture | 4425.00 | 4467.00 | 0 |
2016-02-22 | Multi-Stage Fracture | 2915.00 | 2964.00 | 0 |
2016-02-22 | Perforation | 2859.00 | 2908.00 | 12 |
2016-02-22 | Multi-Stage Fracture | 2859.00 | 2908.00 | 0 |
2016-02-22 | Perforation | 2803.00 | 2852.00 | 12 |
2016-02-22 | Multi-Stage Fracture | 2803.00 | 2852.00 | 0 |
2016-02-22 | Perforation | 2747.00 | 2796.00 | 12 |
2016-02-22 | Multi-Stage Fracture | 2747.00 | 2796.00 | 0 |
2016-02-22 | Perforation | 2691.00 | 2740.00 | 12 |
2016-02-22 | Multi-Stage Fracture | 2691.00 | 2740.00 | 0 |
2016-02-23 | Perforation | 2635.00 | 2684.00 | 12 |
2016-02-15 | Perforation | 4369.00 | 4425.00 | 12 |
2016-02-23 | Multi-Stage Fracture | 2635.00 | 2684.00 | 0 |
2016-02-15 | Multi-Stage Fracture | 4369.00 | 4425.00 | 0 |
2016-02-16 | Perforation | 4314.00 | 4363.00 | 22 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-02-15 | 2016-02-23 | 2,412 | 0 | N/A |
2 | 2016-02-04 | 2016-02-15 | 2,412 | 0 | N/A |
3 | 2016-02-04 | 2016-02-23 | 2,412 | 0 | N/A |
4 | 2016-02-14 | 2016-02-23 | 2,412 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water - Fresh | Not Available | 100 | 90.0431 | N/A | |||
2 | Water - Produced | Not Available | 100 | 90.6349 | N/A | |||
3 | Sand (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 8.3786 | N/A | |
Crystalline silica. quartz | 14808-60-7 | 100 | 8.3786 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 8.3786 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 8.3786 | N/A | ||||
HCL 28% | Canyon Technical Services | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 1.1684 | N/A | |
Water | 7732-18-5 | 100 | 1.1684 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0128 | N/A | |
Water | 7732-18-5 | 100 | 0.0128 | N/A | ||||
CAN-2301 Breaker (Oxidizer) | Canyon Technical Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0348 | N/A | |
Non-hazardous base ingredient(s) | Not Available | 100 | 0.0348 | N/A | ||||
CAN-1000 Corrosion Inhibitor | Canyon Technical Services | Corrosion Inhibitor | Refer to MSDS | 8141 | 100 | 0.0065 | N/A | |
CAN-2200 Crosslinker / pH buffer (Borate) | Canyon Technical Services | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.0426 | N/A | |
Monoethanolamine | 141-43-5 | 100 | 0.0426 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0426 | N/A | ||||
CAN-2000 Gellant (Guar) | Canyon Technical Services | Gelling Agent | Polysacharide Suspension | Not Available | 100 | 0.2568 | N/A | |
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0361 | N/A | |
CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0147 | N/A | |
Potassium Chloride | 7447-40-7 | 100 | 0.0147 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0147 | N/A | ||||
CAN-2403 nanoFLO | Canyon Technical Services | Surfactant | Ethanol | 64-17-5 | 100 | 0.0137 | N/A | |
Methanol | 67-56-1 | 100 | 0.0137 | N/A | ||||
Terpenes and Terpenoids. sweet orange-oil | 68647-72-3 | 100 | 0.0137 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0137 | N/A | ||||
4 | Sand (50/140) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 0.4228 | N/A | |
Crystalline silica. quartz | 14808-60-7 | 100 | 0.4228 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 0.4228 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 0.4228 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-02-02 | 2016-03-01 | Surface Water - Runoff | 30447 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 6826 | 0.0 | 0.0 | 0.0 |
2017 | 7026 | 0.0 | 0.0 | 0.0 |
2018 | 8037 | 0.0 | 0.0 | 0.0 |
2019 | 7801 | 0.0 | 0.0 | 0.0 |
2020 | 2174 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-10-20 | No Incident Encountered | 0.00 | 0.00 |
2016-02-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]