X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394271816022

Well Details

Well ID: 0394271816022
Loading map...
Location: 02/16-18-039-27W4/2
Location Alias: 02/16-18-39-27 W4M
Location Alias 2: 02/16-18-039-27 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 27
Section: 18
County/Municipality: Lacombe County
Well Name: VESTA CYGNET 16-18-39-27
Operator Name: Vesta Energy Ltd.
License Number: 0485000
License Date: 2017-08-14
License Status: Amended
Spud Date: 2017-09-01
Final Drill Date: 2017-09-18
Well Total Depth: 5211.00 m
Surface Hole Latitude: 52.382524
Surface Hole Longitude: -113.880568

For data sources see[1][2]

Well History

Date Event
2017-08-12 Conductor Casing Operation Performed
2017-08-14 Obtained License
2017-09-02 Surface Casing Operation Performed
2017-09-06 Direction Drilling Operation Performed - Deviate
2017-09-08 Direction Drilling Operation Performed - Horizontal
2017-09-16 Direction Drilling Operation Performed - Horizontal
2017-09-18 Finished Drilling
2017-09-18 Well Log Performed
2017-09-18 Well Mode changed to Drilled and Cased
2017-09-21 Production Casing Operation Performed
2017-09-22 Rig Released
2017-10-24 Perforation Treatment Performed - Jet Perforation
2017-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-25 Perforation Treatment Performed - Jet Perforation
2017-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-26 Perforation Treatment Performed - Jet Perforation
2017-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-27 Perforation Treatment Performed - Jet Perforation
2017-10-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-28 Perforation Treatment Performed - Jet Perforation
2017-10-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-29 Perforation Treatment Performed - Jet Perforation
2017-10-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-30 Perforation Treatment Performed - Jet Perforation
2017-10-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-31 Perforation Treatment Performed - Jet Perforation
2017-10-31 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-01 Perforation Treatment Performed - Jet Perforation
2017-11-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-02 Perforation Treatment Performed - Jet Perforation
2017-11-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-03 Perforation Treatment Performed - Jet Perforation
2017-11-03 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-05 Perforation Treatment Performed - Jet Perforation
2017-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-06 Perforation Treatment Performed - Jet Perforation
2017-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-18 Perforation Treatment Performed - Jet Perforation
2017-11-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-19 Perforation Treatment Performed - Jet Perforation
2017-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-20 Perforation Treatment Performed - Jet Perforation
2017-11-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-21 Perforation Treatment Performed - Jet Perforation
2017-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-22 Perforation Treatment Performed - Jet Perforation
2017-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-23 Perforation Treatment Performed - Jet Perforation
2017-11-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-24 Perforation Treatment Performed - Jet Perforation
2017-11-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-25 Perforation Treatment Performed - Jet Perforation
2017-11-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-26 Perforation Treatment Performed - Jet Perforation
2017-11-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-27 Perforation Treatment Performed - Jet Perforation
2017-11-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-28 Perforation Treatment Performed - Jet Perforation
2017-11-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-29 Perforation Treatment Performed - Jet Perforation
2017-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-02 Well Began Production
2018-01-02 Well Fluid changed to Crude Oil
2018-01-02 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-09-06 892.90 Deviate (5 - 79 degrees)
2017-09-08 2791.80 Horizontal
2017-09-16 4474.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-10-24 Perforation 5185.00 5185.40 15
2017-10-24 Perforation 5130.80 5131.20 15
2017-10-28 Perforation 4588.10 4588.50 15
2017-10-28 Perforation 4582.50 4582.90 15
2017-10-28 Perforation 4575.00 4575.40 15
2017-10-28 Perforation 4567.80 4568.20 15
2017-10-28 Perforation 4561.00 4561.40 15
2017-10-28 Perforation 4554.20 4554.60 15
2017-10-28 Perforation 4548.50 4548.90 15
2017-10-28 Perforation 4540.70 4541.10 15
2017-10-29 Multi-Stage Fracture 4540.70 4588.50 0
2017-10-29 Perforation 4533.90 4534.30 15
2017-10-24 Perforation 5124.00 5124.40 15
2017-10-29 Perforation 4527.10 4527.50 15
2017-10-29 Perforation 4520.30 4520.70 15
2017-10-29 Perforation 4513.50 4513.90 15
2017-10-29 Perforation 4506.70 4507.10 15
2017-10-29 Perforation 4500.00 4500.40 15
2017-10-29 Perforation 4493.20 4493.60 15
2017-10-29 Perforation 4486.40 4486.80 15
2017-10-29 Multi-Stage Fracture 4486.40 4534.30 0
2017-10-29 Perforation 4479.60 4480.00 15
2017-10-29 Perforation 4472.50 4472.90 15
2017-10-24 Perforation 5117.20 5117.60 15
2017-10-29 Perforation 4466.00 4466.40 15
2017-10-29 Perforation 4459.30 4459.70 15
2017-10-29 Perforation 4452.50 4452.90 15
2017-10-29 Perforation 4445.70 4446.10 15
2017-10-29 Perforation 4438.10 4438.50 15
2017-10-29 Perforation 4432.10 4432.50 15
2017-10-30 Multi-Stage Fracture 4432.10 4480.00 0
2017-10-30 Perforation 4425.30 4425.70 15
2017-10-30 Perforation 4418.60 4419.00 15
2017-10-30 Perforation 4411.80 4412.20 15
2017-10-24 Perforation 5110.40 5110.80 15
2017-10-30 Perforation 4405.00 4405.40 15
2017-10-30 Perforation 4398.20 4398.60 15
2017-10-30 Perforation 4391.00 4391.40 15
2017-10-30 Perforation 4384.70 4385.10 15
2017-10-30 Perforation 4377.90 4378.30 15
2017-10-30 Multi-Stage Fracture 4377.90 4425.70 0
2017-10-30 Perforation 4371.10 4371.50 15
2017-10-30 Perforation 4364.40 4364.80 15
2017-10-30 Perforation 4358.50 4358.90 15
2017-10-30 Perforation 4350.70 4351.10 15
2017-10-24 Perforation 5103.60 5104.00 15
2017-10-30 Perforation 4344.00 4344.40 15
2017-10-30 Perforation 4337.20 4337.60 15
2017-10-30 Perforation 4330.40 4330.80 15
2017-10-30 Perforation 4324.50 4324.90 15
2017-10-31 Multi-Stage Fracture 4324.50 4371.50 0
2017-10-31 Perforation 4316.80 4317.20 15
2017-10-31 Perforation 4310.00 4310.40 15
2017-10-31 Perforation 4303.30 4303.70 15
2017-10-31 Perforation 4296.50 4296.90 15
2017-10-31 Perforation 4289.70 4290.10 15
2017-10-24 Perforation 5097.00 5097.40 15
2017-10-31 Perforation 4282.90 4283.30 15
2017-10-31 Perforation 4277.50 4277.90 15
2017-10-31 Perforation 4269.30 4269.70 15
2017-10-31 Multi-Stage Fracture 4269.30 4317.20 0
2017-10-31 Perforation 4262.60 4263.00 15
2017-10-31 Perforation 4255.80 4256.20 15
2017-10-31 Perforation 4249.00 4249.40 15
2017-10-31 Perforation 4243.00 4243.40 15
2017-10-31 Perforation 4235.40 4235.80 15
2017-10-31 Perforation 4228.00 4228.40 15
2017-10-24 Perforation 5090.10 5090.50 15
2017-10-31 Perforation 4221.90 4222.30 15
2017-10-31 Perforation 4215.10 4215.50 15
2017-11-01 Multi-Stage Fracture 4215.10 4263.00 0
2017-11-01 Perforation 4208.30 4208.70 15
2017-11-01 Perforation 4201.50 4201.90 15
2017-11-01 Perforation 4195.50 4195.90 15
2017-11-01 Perforation 4189.00 4189.40 15
2017-11-01 Perforation 4181.20 4181.60 15
2017-11-01 Perforation 4174.40 4174.80 15
2017-11-01 Perforation 4167.60 4168.00 15
2017-10-24 Perforation 5085.00 5085.40 15
2017-11-01 Perforation 4161.50 4161.90 15
2017-11-01 Multi-Stage Fracture 4161.50 4208.70 0
2017-11-01 Perforation 4154.00 4154.40 15
2017-11-01 Perforation 4147.00 4147.40 15
2017-11-01 Perforation 4140.50 4140.90 15
2017-11-01 Perforation 4133.70 4134.10 15
2017-11-01 Perforation 4126.90 4127.30 15
2017-11-01 Perforation 4120.10 4120.50 15
2017-11-01 Perforation 4114.50 4114.90 15
2017-11-01 Perforation 4106.60 4107.00 15
2017-10-24 Multi-Stage Fracture 5085.00 5131.20 0
2017-11-02 Multi-Stage Fracture 4106.60 4154.40 0
2017-11-02 Perforation 4099.80 4100.20 15
2017-11-02 Perforation 4093.00 4093.40 15
2017-11-02 Perforation 4086.20 4086.60 15
2017-11-02 Perforation 4079.40 4079.80 15
2017-11-02 Perforation 4072.60 4073.00 15
2017-11-02 Perforation 4065.00 4065.40 15
2017-11-02 Perforation 4059.10 4059.50 15
2017-11-02 Perforation 4052.30 4052.70 15
2017-11-02 Multi-Stage Fracture 4052.30 4100.20 0
2017-10-25 Perforation 5076.50 5076.90 15
2017-11-02 Perforation 4045.50 4045.90 15
2017-11-02 Perforation 4038.70 4039.10 15
2017-11-02 Perforation 4031.90 4032.30 15
2017-11-02 Perforation 4025.20 4025.60 15
2017-11-02 Perforation 4018.40 4018.80 15
2017-11-02 Perforation 4011.60 4012.00 15
2017-11-02 Perforation 4004.80 4005.20 15
2017-11-02 Perforation 3998.00 3998.40 15
2017-11-03 Multi-Stage Fracture 3998.00 4045.90 0
2017-11-03 Perforation 3991.20 3991.60 15
2017-10-24 Perforation 5178.20 5178.60 15
2017-10-25 Perforation 5069.70 5070.10 15
2017-11-03 Perforation 3984.00 3984.40 15
2017-11-03 Perforation 3977.70 3978.10 15
2017-11-03 Perforation 3970.90 3971.30 15
2017-11-03 Perforation 3964.10 3964.50 15
2017-11-03 Perforation 3957.30 3957.70 15
2017-11-03 Perforation 3950.60 3951.00 15
2017-11-03 Perforation 3943.80 3944.20 15
2017-11-05 Multi-Stage Fracture 3943.80 3991.60 0
2017-11-05 Perforation 3937.00 3937.40 15
2017-11-05 Perforation 3930.20 3930.60 15
2017-10-25 Perforation 5062.90 5063.30 15
2017-11-05 Perforation 3923.40 3923.80 15
2017-11-05 Perforation 3916.60 3917.00 15
2017-11-05 Perforation 3909.90 3910.30 15
2017-11-05 Perforation 3903.50 3903.90 15
2017-11-05 Perforation 3896.30 3896.70 15
2017-11-05 Perforation 3889.50 3889.90 15
2017-11-05 Multi-Stage Fracture 3889.50 3937.40 0
2017-11-05 Perforation 3882.70 3883.10 15
2017-11-05 Perforation 3875.90 3876.30 15
2017-11-05 Perforation 3869.20 3869.60 15
2017-10-25 Perforation 5056.10 5056.50 15
2017-11-05 Perforation 3862.40 3862.80 15
2017-11-05 Perforation 3855.60 3856.00 15
2017-11-05 Perforation 3848.80 3849.20 15
2017-11-05 Perforation 3842.00 3842.40 15
2017-11-05 Perforation 3835.20 3835.60 15
2017-11-06 Multi-Stage Fracture 3835.20 3883.10 0
2017-11-06 Perforation 3828.50 3828.90 15
2017-11-06 Perforation 3820.50 3820.90 15
2017-11-06 Perforation 3814.90 3815.30 15
2017-11-06 Perforation 3808.10 3808.50 15
2017-10-25 Perforation 5048.00 5048.40 15
2017-11-06 Perforation 3801.30 3801.70 15
2017-11-06 Perforation 3793.50 3793.90 15
2017-11-06 Perforation 3787.80 3788.20 15
2017-11-06 Perforation 3781.00 3781.40 15
2017-11-18 Multi-Stage Fracture 3781.00 3828.90 0
2017-11-18 Perforation 3774.20 3774.60 15
2017-11-18 Perforation 3767.40 3767.80 15
2017-11-18 Perforation 3760.60 3761.00 15
2017-11-18 Perforation 3753.90 3754.30 15
2017-11-18 Perforation 3747.10 3747.50 15
2017-10-25 Perforation 5042.60 5043.00 15
2017-11-18 Perforation 3740.30 3740.70 15
2017-11-18 Perforation 3733.50 3733.90 15
2017-11-18 Perforation 3727.70 3728.10 15
2017-11-19 Multi-Stage Fracture 3727.70 3774.60 0
2017-11-19 Perforation 3719.90 3720.30 15
2017-11-19 Perforation 3713.90 3714.30 15
2017-11-19 Perforation 3706.40 3706.80 15
2017-11-19 Perforation 3699.60 3700.00 15
2017-11-19 Perforation 3692.80 3693.20 15
2017-11-19 Perforation 3686.00 3686.40 15
2017-10-25 Perforation 5035.80 5036.20 15
2017-11-19 Perforation 3679.20 3679.60 15
2017-11-19 Perforation 3672.50 3672.90 15
2017-11-19 Multi-Stage Fracture 3672.50 3720.30 0
2017-11-19 Perforation 3665.00 3665.40 15
2017-11-19 Perforation 3658.90 3659.30 15
2017-11-19 Perforation 3652.10 3652.50 15
2017-11-19 Perforation 3645.30 3645.70 15
2017-11-19 Perforation 3638.50 3638.90 15
2017-11-19 Perforation 3632.50 3632.90 15
2017-11-19 Perforation 3626.00 3626.40 15
2017-10-25 Perforation 5029.00 5029.40 15
2017-11-19 Perforation 3620.00 3620.40 15
2017-11-20 Multi-Stage Fracture 3620.00 3665.40 0
2017-11-20 Perforation 3612.00 3612.40 15
2017-11-20 Perforation 3604.60 3605.00 15
2017-11-20 Perforation 3597.80 3598.20 15
2017-11-20 Perforation 3591.10 3591.50 15
2017-11-20 Perforation 3586.00 3586.40 15
2017-11-20 Perforation 3578.00 3578.40 15
2017-11-20 Perforation 3570.70 3571.10 15
2017-11-20 Perforation 3565.00 3565.40 15
2017-10-25 Multi-Stage Fracture 5029.00 5076.90 0
2017-11-21 Multi-Stage Fracture 3565.00 3612.40 0
2017-11-21 Perforation 3557.20 3557.60 15
2017-11-21 Perforation 3550.40 3550.80 15
2017-11-21 Perforation 3543.60 3544.00 15
2017-11-21 Perforation 3536.80 3537.20 15
2017-11-21 Perforation 3530.00 3530.40 15
2017-11-21 Perforation 3523.20 3523.60 15
2017-11-21 Perforation 3516.50 3516.90 15
2017-11-21 Perforation 3509.70 3510.10 15
2017-11-21 Multi-Stage Fracture 3509.70 3557.60 0
2017-10-25 Perforation 5022.20 5022.60 15
2017-11-21 Perforation 3502.50 3502.90 15
2017-11-21 Perforation 3496.10 3496.50 15
2017-11-21 Perforation 3489.30 3489.70 15
2017-11-21 Perforation 3482.50 3482.90 15
2017-11-21 Perforation 3475.80 3476.20 15
2017-11-21 Perforation 3469.00 3469.40 15
2017-11-21 Perforation 3462.20 3462.60 15
2017-11-21 Perforation 3455.40 3455.80 15
2017-11-22 Multi-Stage Fracture 3455.40 3502.90 0
2017-11-22 Perforation 3448.60 3449.00 15
2017-10-25 Perforation 5015.50 5015.90 15
2017-11-22 Perforation 3441.80 3442.20 15
2017-11-22 Perforation 3435.10 3435.50 15
2017-11-22 Perforation 3428.30 3428.70 15
2017-11-22 Perforation 3420.50 3420.90 15
2017-11-22 Perforation 3414.70 3415.10 15
2017-11-22 Perforation 3407.90 3408.30 15
2017-11-22 Perforation 3401.10 3401.50 15
2017-11-22 Multi-Stage Fracture 3401.10 3449.00 0
2017-11-23 Perforation 3384.20 3384.40 20
2017-11-23 Perforation 3377.40 3377.60 20
2017-10-24 Perforation 5171.50 5171.90 15
2017-10-25 Perforation 5008.70 5009.10 15
2017-11-23 Perforation 3370.60 3370.80 20
2017-11-23 Perforation 3363.30 3363.50 20
2017-11-23 Perforation 3357.00 3357.20 20
2017-11-23 Perforation 3350.30 3350.50 20
2017-11-23 Perforation 3343.50 3343.70 20
2017-11-23 Perforation 3336.70 3336.90 20
2017-11-23 Multi-Stage Fracture 3336.70 3384.40 0
2017-11-23 Perforation 3326.00 3326.40 15
2017-11-23 Perforation 3320.30 3320.70 15
2017-11-23 Perforation 3313.50 3313.90 15
2017-10-25 Perforation 5001.00 5001.40 15
2017-11-23 Perforation 3306.80 3307.20 15
2017-11-23 Perforation 3300.00 3300.40 15
2017-11-23 Perforation 3293.20 3293.60 15
2017-11-23 Perforation 3286.40 3286.80 15
2017-11-23 Perforation 3281.00 3281.40 15
2017-11-24 Multi-Stage Fracture 3281.00 3326.40 0
2017-11-24 Perforation 3272.30 3272.70 15
2017-11-24 Perforation 3265.50 3265.90 15
2017-11-24 Perforation 3259.00 3259.40 15
2017-11-24 Perforation 3251.90 3252.30 15
2017-10-25 Perforation 4995.10 4995.50 15
2017-11-24 Perforation 3245.10 3245.50 15
2017-11-24 Perforation 3238.40 3238.80 15
2017-11-24 Perforation 3231.60 3232.00 15
2017-11-24 Perforation 3224.80 3225.20 15
2017-11-24 Multi-Stage Fracture 3224.80 3272.70 0
2017-11-24 Perforation 3218.00 3218.40 15
2017-11-24 Perforation 3210.50 3210.90 15
2017-11-24 Perforation 3204.40 3204.80 15
2017-11-24 Perforation 3197.70 3198.10 15
2017-11-24 Perforation 3190.90 3191.30 15
2017-10-25 Perforation 4988.30 4988.70 15
2017-11-24 Perforation 3184.10 3184.50 15
2017-11-25 Multi-Stage Fracture 3184.10 3232.00 0
2017-11-25 Perforation 3176.50 3176.90 15
2017-11-25 Perforation 3170.50 3170.90 15
2017-11-25 Perforation 3163.70 3164.10 15
2017-11-25 Perforation 3157.00 3157.40 15
2017-11-25 Perforation 3150.20 3150.60 15
2017-11-25 Perforation 3143.50 3143.90 15
2017-11-25 Perforation 3136.60 3137.00 15
2017-11-25 Perforation 3129.80 3130.20 15
2017-10-25 Perforation 4981.50 4981.90 15
2017-11-25 Multi-Stage Fracture 3129.80 3176.90 0
2017-11-25 Perforation 3123.10 3123.50 15
2017-11-25 Perforation 3116.30 3116.70 15
2017-11-25 Perforation 3109.50 3109.90 15
2017-11-25 Perforation 3102.70 3103.10 15
2017-11-25 Perforation 3095.90 3096.30 15
2017-11-25 Perforation 3089.10 3089.50 15
2017-11-25 Perforation 3082.40 3082.80 15
2017-11-25 Perforation 3075.60 3076.00 15
2017-11-26 Multi-Stage Fracture 3075.60 3123.50 0
2017-10-25 Perforation 4974.80 4975.20 15
2017-11-26 Perforation 3068.00 3068.40 15
2017-11-26 Perforation 3062.00 3062.40 15
2017-11-26 Perforation 3055.20 3055.60 15
2017-11-26 Perforation 3048.40 3048.80 15
2017-11-26 Perforation 3041.70 3042.10 15
2017-11-26 Perforation 3034.90 3035.30 15
2017-11-26 Perforation 3028.10 3028.50 15
2017-11-26 Perforation 3021.00 3021.40 15
2017-11-26 Multi-Stage Fracture 3021.00 3068.40 0
2017-11-26 Perforation 3014.50 3014.90 15
2017-10-25 Multi-Stage Fracture 4974.80 5022.60 0
2017-11-26 Perforation 3007.70 3008.10 15
2017-11-26 Perforation 3001.00 3001.40 15
2017-11-26 Perforation 2994.20 2994.60 15
2017-11-26 Perforation 2987.40 2987.80 15
2017-11-26 Perforation 2980.60 2981.00 15
2017-11-26 Perforation 2973.80 2974.20 15
2017-11-26 Perforation 2967.00 2967.40 15
2017-11-27 Multi-Stage Fracture 2967.00 3014.90 0
2017-11-27 Perforation 2960.30 2960.70 15
2017-11-27 Perforation 2954.00 2954.40 15
2017-10-25 Perforation 4968.00 4968.40 15
2017-11-27 Perforation 2946.70 2947.10 15
2017-11-27 Perforation 2939.90 2940.30 15
2017-11-27 Perforation 2933.10 2933.50 15
2017-11-27 Perforation 2926.40 2926.80 15
2017-11-27 Perforation 2919.60 2920.00 15
2017-11-27 Perforation 2912.80 2913.20 15
2017-11-27 Multi-Stage Fracture 2912.80 2960.70 0
2017-11-27 Perforation 2906.00 2906.40 15
2017-11-27 Perforation 2899.20 2899.60 15
2017-11-27 Perforation 2892.40 2892.80 15
2017-10-25 Perforation 4961.20 4961.60 15
2017-11-27 Perforation 2885.70 2886.10 15
2017-11-27 Perforation 2878.90 2879.30 15
2017-11-27 Perforation 2872.10 2872.50 15
2017-11-27 Perforation 2865.30 2865.70 15
2017-11-27 Perforation 2858.50 2858.90 15
2017-11-28 Multi-Stage Fracture 2858.50 2906.40 0
2017-11-28 Perforation 2851.70 2852.10 15
2017-11-28 Perforation 2845.00 2845.40 15
2017-11-28 Perforation 2838.20 2838.60 15
2017-11-28 Perforation 2831.40 2831.80 15
2017-10-25 Perforation 4954.40 4954.80 15
2017-11-28 Perforation 2824.60 2825.00 15
2017-11-28 Perforation 2817.80 2818.20 15
2017-11-28 Perforation 2811.00 2811.40 15
2017-11-28 Perforation 2804.30 2804.70 15
2017-11-29 Multi-Stage Fracture 2804.30 2852.10 0
2017-11-29 Perforation 2797.50 2797.90 15
2017-11-29 Perforation 2790.70 2791.10 15
2017-11-29 Perforation 2783.90 2784.30 15
2017-11-29 Perforation 2777.10 2777.50 15
2017-11-29 Perforation 2770.30 2770.70 15
2017-10-24 Perforation 5164.70 5165.10 15
2017-10-25 Perforation 4947.60 4948.00 15
2017-11-29 Perforation 2763.60 2764.00 15
2017-11-29 Perforation 2756.80 2757.20 15
2017-11-29 Perforation 2750.00 2750.40 15
2017-11-29 Multi-Stage Fracture 2750.00 2797.90 0
2017-10-25 Perforation 4940.80 4941.20 15
2017-10-25 Perforation 4934.10 4934.50 15
2017-10-25 Perforation 4927.30 4927.70 15
2017-10-25 Perforation 4921.20 4921.60 15
2017-10-26 Multi-Stage Fracture 4921.20 4968.40 0
2017-10-26 Perforation 4913.70 4914.10 15
2017-10-26 Perforation 4906.90 4907.30 15
2017-10-26 Perforation 4900.10 4900.50 15
2017-10-26 Perforation 4893.40 4893.80 15
2017-10-24 Perforation 5157.90 5158.30 15
2017-10-26 Perforation 4886.60 4887.00 15
2017-10-26 Perforation 4879.80 4880.20 15
2017-10-26 Perforation 4872.50 4872.90 15
2017-10-26 Perforation 4866.20 4866.60 15
2017-10-26 Multi-Stage Fracture 4866.20 4914.10 0
2017-10-26 Perforation 4859.40 4859.80 15
2017-10-26 Perforation 4852.70 4853.10 15
2017-10-26 Perforation 4845.90 4846.30 15
2017-10-26 Perforation 4840.00 4840.40 15
2017-10-26 Perforation 4832.30 4832.70 15
2017-10-24 Perforation 5151.10 5151.50 15
2017-10-26 Perforation 4825.50 4825.90 15
2017-10-26 Perforation 4818.70 4819.10 15
2017-10-26 Perforation 4812.00 4812.40 15
2017-10-26 Multi-Stage Fracture 4812.00 4859.80 0
2017-10-26 Perforation 4805.20 4805.60 15
2017-10-26 Perforation 4798.40 4798.80 15
2017-10-26 Perforation 4791.00 4791.40 15
2017-10-26 Perforation 4784.80 4785.20 15
2017-10-26 Perforation 4778.10 4778.50 15
2017-10-26 Perforation 4771.30 4771.70 15
2017-10-24 Perforation 5144.30 5144.70 15
2017-10-26 Perforation 4764.50 4764.90 15
2017-10-26 Perforation 4757.00 4757.40 15
2017-10-27 Multi-Stage Fracture 4757.00 4805.60 0
2017-10-27 Perforation 4750.90 4751.30 15
2017-10-27 Perforation 4744.10 4744.50 15
2017-10-27 Perforation 4737.40 4737.80 15
2017-10-27 Perforation 4730.60 4731.00 15
2017-10-27 Perforation 4723.80 4724.20 15
2017-10-27 Perforation 4717.00 4717.40 15
2017-10-27 Perforation 4709.60 4710.00 15
2017-10-24 Perforation 5137.50 5137.90 15
2017-10-27 Perforation 4703.40 4703.80 15
2017-10-27 Multi-Stage Fracture 4703.40 4751.30 0
2017-10-27 Perforation 4696.70 4697.10 15
2017-10-27 Perforation 4689.90 4690.30 15
2017-10-27 Perforation 4683.10 4683.50 15
2017-10-27 Perforation 4676.30 4676.70 15
2017-10-27 Perforation 4669.50 4669.90 15
2017-10-27 Perforation 4662.50 4662.90 15
2017-10-27 Perforation 4656.00 4656.40 15
2017-10-27 Perforation 4649.20 4649.60 15
2017-10-24 Multi-Stage Fracture 5137.50 5185.40 0
2017-10-28 Multi-Stage Fracture 4649.20 4697.10 0
2017-10-28 Perforation 4642.40 4642.80 15
2017-10-28 Perforation 4635.60 4636.00 15
2017-10-28 Perforation 4628.80 4629.20 15
2017-10-28 Perforation 4622.00 4622.40 15
2017-10-28 Perforation 4615.30 4615.70 15
2017-10-28 Perforation 4608.50 4608.90 15
2017-10-28 Perforation 4601.70 4602.10 15
2017-10-28 Perforation 4594.90 4595.30 15
2017-10-28 Multi-Stage Fracture 4594.90 4642.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-10-24 2017-11-29 2,478 59,243 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 91.0062 N/A
FRAC SAND. 50/140 WHITE (OTTAWA TYPE) BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.0909 N/A
Hydrochloric Acid 15% BJ Services Acid Hydrochloric acid 7647-01-0 100 0.7678 N/A
Water 7732-18-5 100 0.7678 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0019 N/A
Methanol 67-56-1 100 0.0019 N/A
Water 7732-18-5 100 0.0019 N/A
X-CIDE 450 BJ Services Bactericide/Biocide Glutaraldehyde 111-30-8 100 0.0277 N/A
Methanol 67-56-1 100 0.0277 N/A
Water 7732-18-5 100 0.0277 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0048 N/A
Nowferr 3G BJ Services Corrosion Inhibitor 2-Propyn-1-ol. compd w methyloxirane 38172-91-7 100 0.0021 N/A
Non-hazardous Not Available 100 0.0021 N/A
Propargyl alcohol 107-19-7 100 0.0021 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0522 N/A
Oxyalkylated alcohol 9014 100 0.0522 N/A
Petroleum distillates 64742-47-8 100 0.0522 N/A
Polyacrylate 9014 100 0.0522 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0309 N/A
Water 7732-18-5 100 0.0309 N/A
InFlo 73 BJ Services Surfactant Alkoxylated alcohol_2 9969 100 0.0081 N/A
Amine derivative 9969 100 0.0081 N/A
Cyclohexanol 108-93-0 100 0.0081 N/A
Glycerine 56-81-5 100 0.0081 N/A
Pentanol 71-41-0 100 0.0081 N/A
Petroleum distillates 64742-47-8 100 0.0081 N/A
Propylene glycol 57-55-6 100 0.0081 N/A
Urea 57-13-6 100 0.0081 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-21 2017-11-27 Oilfield Produced Water 465
2017-10-22 2017-11-28 Oilfield Produced Water 1099
2017-10-22 2017-11-28 Oilfield Produced Water 409
2017-10-23 2017-10-23 Oilfield Produced Water 9
2017-10-27 2017-11-27 Oilfield Produced Water 128
2017-10-21 2017-11-28 Oilfield Produced Water 467
2017-11-17 2017-11-28 Oilfield Produced Water 333
2017-11-29 2017-11-29 Oilfield Produced Water 9
2017-11-20 2017-11-28 Oilfield Produced Water 4
2017-10-22 2017-11-29 Surface Water - Runoff 16979
2017-10-22 2017-11-29 Surface Water - Runoff 17776
2017-10-22 2017-11-29 Surface Water - Runoff 22263
2017-10-22 2017-11-29 Surface Water - Runoff 2695

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 8436 0.0 0.0 0.0
2019 7874 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-24 No Incident Encountered 0.00 0.00

For data sources see[9]

References