If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394271311002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.355111,"lon":-113.762303,"icon":""}]} |
Location: 00/11-13-039-27W4/2 | |
Location Alias: 00/11-13-39-27 W4M | |
Location Alias 2: 00/11-13-039-27 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 27 | |
Section: 13 | |
County/Municipality: Red Deer County | |
Well Name: IMP JOFFRE 11-13BQ-39-27 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0014531 | |
License Date: 1958-01-07 | |
License Status: RecCertified | |
Spud Date: 1958-02-14 | |
Final Drill Date: 1958-03-12 | |
Well Total Depth: 2125.10 m | |
Surface Hole Latitude: 52.355111 | |
Surface Hole Longitude: -113.762303 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-01-07 | Obtained License |
1958-02-28 | Drill Stem Test Performed |
1958-03-12 | Drill Stem Test Performed |
1958-03-12 | Finished Drilling |
1958-03-12 | Well Mode changed to Drilled and Cased |
1958-03-14 | Production Casing Operation Performed |
1958-03-16 | Perforation Treatment Performed - Open-Hole Completion |
1958-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-06-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1958-06-05 | Perforation Treatment Performed - Jet Perforation |
1958-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-06-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-06-22 | Well Began Production |
1959-06-22 | Well Fluid changed to Crude Oil |
1959-06-22 | Well Mode changed to Flowing |
1985-09-23 | Perforation Treatment Performed - Cement Squeeze |
1985-09-23 | Plug Back Performed |
1985-09-23 | Well Fluid changed to Crude Oil |
1985-09-23 | Well Mode changed to Abandoned Zone |
1985-10-02 | Perforation Treatment Performed - Open-Hole Completion |
1994-08-22 | Well Log Performed |
1994-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-23 | Perforation Treatment Performed - Jet Perforation |
1994-08-23 | Plug Back Performed |
1994-08-24 | Perforation Treatment Performed - Remedial Casing |
1994-08-26 | Well Abandoned |
1994-08-26 | Well Fluid changed to Crude Oil |
1994-08-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-03-16 | Open Hole/Barefoot Completion | 2085.70 | 2125.10 | 0 |
1994-08-23 | Packing Device Capped w/Cement | 1977.00 | 1985.00 | 0 |
1994-08-23 | Packing Device Capped w/Cement | 1707.00 | 1714.00 | 0 |
1994-08-23 | Packing Device Capped w/Cement | 563.00 | 571.00 | 0 |
1994-08-23 | Perforation | 200.00 | 200.50 | 13 |
1994-08-24 | Remedial Casing Cementing | 200.00 | 200.50 | 0 |
1958-03-22 | Acid Treatment | 2085.70 | 2125.10 | 0 |
1958-03-27 | Acid Treatment | 2085.70 | 2125.10 | 0 |
1958-06-05 | Packing Device Capped w/Cement | 1862.30 | 1863.50 | 0 |
1958-06-05 | Perforation | 1731.00 | 1732.80 | 13 |
1958-06-08 | Acid Treatment | 1731.00 | 1732.80 | 0 |
1958-06-09 | Acid Treatment | 1731.00 | 1732.80 | 0 |
1985-09-23 | Cement Squeeze | 1731.00 | 1732.80 | 0 |
1985-10-02 | Open Hole/Barefoot Completion | 2085.70 | 2125.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 216 | 0.0 | 0.0 | 0.0 |
1968 | 384 | 0.0 | 0.0 | 0.0 |
1969 | 1974 | 0.0 | 0.0 | 0.0 |
1970 | 3803 | 0.0 | 0.0 | 0.0 |
1971 | 4596 | 0.0 | 0.0 | 0.0 |
1972 | 4865 | 0.0 | 0.0 | 0.0 |
1973 | 7592 | 0.0 | 0.0 | 0.0 |
1974 | 8415 | 0.0 | 0.0 | 0.0 |
1975 | 7010 | 0.0 | 0.0 | 0.0 |
1976 | 2070 | 0.0 | 0.0 | 0.0 |
1977 | 6379 | 0.0 | 0.0 | 0.0 |
1978 | 7192 | 0.0 | 0.0 | 0.0 |
1979 | 2708 | 0.0 | 0.0 | 0.0 |
1980 | 1804 | 0.0 | 0.0 | 0.0 |
1981 | 7172 | 0.0 | 0.0 | 0.0 |
1982 | 5243 | 0.0 | 0.0 | 0.0 |
1983 | 6453 | 0.0 | 0.0 | 0.0 |
1984 | 7593 | 0.0 | 0.0 | 0.0 |
1985 | 1560 | 0.0 | 0.0 | 0.0 |
For data sources see[5]