X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394271311000

Well Details

Well ID: 0394271311000
Loading map...
Location: 00/11-13-039-27W4/0
Location Alias: 00/11-13-39-27 W4M
Location Alias 2: 00/11-13-039-27 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 27
Section: 13
County/Municipality: Red Deer County
Well Name: IMP JOFFRE 11-13BQ-39-27
Operator Name: Imperial Oil Resources Limited
License Number: 0014531
License Date: 1958-01-07
License Status: RecCertified
Spud Date: 1958-02-14
Final Drill Date: 1958-03-12
Well Total Depth: 2125.10 m
Surface Hole Latitude: 52.355111
Surface Hole Longitude: -113.762303

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-01-07 Obtained License
1958-02-28 Drill Stem Test Performed
1958-03-12 Drill Stem Test Performed
1958-03-12 Finished Drilling
1958-03-12 Well Mode changed to Drilled and Cased
1958-03-14 Production Casing Operation Performed
1958-03-16 Perforation Treatment Performed - Open-Hole Completion
1958-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-04-13 Well Began Production
1958-04-13 Well Fluid changed to Crude Oil
1958-04-13 Well Mode changed to Pumping
1958-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-06-05 Perforation Treatment Performed - Jet Perforation
1958-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-06-05 Well Fluid changed to Crude Oil
1959-06-05 Well Mode changed to Abandoned Zone
1985-09-23 Perforation Treatment Performed - Cement Squeeze
1985-09-23 Plug Back Performed
1985-10-02 Perforation Treatment Performed - Open-Hole Completion
1985-10-08 Well Fluid changed to Crude Oil
1985-10-08 Well Mode changed to Pumping
1986-02-01 Well Fluid changed to Crude Oil
1986-02-01 Well Mode changed to Suspended
1994-08-22 Well Log Performed
1994-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-23 Perforation Treatment Performed - Jet Perforation
1994-08-23 Plug Back Performed
1994-08-23 Well Fluid changed to Crude Oil
1994-08-23 Well Mode changed to Abandoned Zone
1994-08-24 Perforation Treatment Performed - Remedial Casing
1994-08-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-03-16 Open Hole/Barefoot Completion 2085.70 2125.10 0
1994-08-23 Packing Device Capped w/Cement 1977.00 1985.00 0
1994-08-23 Packing Device Capped w/Cement 1707.00 1714.00 0
1994-08-23 Packing Device Capped w/Cement 563.00 571.00 0
1994-08-23 Perforation 200.00 200.50 13
1994-08-24 Remedial Casing Cementing 200.00 200.50 0
1958-03-22 Acid Treatment 2085.70 2125.10 0
1958-03-27 Acid Treatment 2085.70 2125.10 0
1958-06-05 Packing Device Capped w/Cement 1862.30 1863.50 0
1958-06-05 Perforation 1731.00 1732.80 13
1958-06-08 Acid Treatment 1731.00 1732.80 0
1958-06-09 Acid Treatment 1731.00 1732.80 0
1985-09-23 Cement Squeeze 1731.00 1732.80 0
1985-10-02 Open Hole/Barefoot Completion 2085.70 2125.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1985 1446 0.0 0.0 0.0
1986 108 0.0 0.0 0.0

For data sources see[5]

References