If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394262215D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.374416,"lon":-113.658775,"icon":""}]} |
Location: D0/15-22-039-26W4/0 | |
Location Alias: D0/15-22-39-26 W4M | |
Location Alias 2: D0/15-22-039-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Lacombe County | |
Well Name: TANAGER JOFFRE 15-22-39-26 | |
Operator Name: Paleo Resources, Inc. | |
License Number: 0134941 | |
License Date: 1988-07-14 | |
License Status: Amended | |
Spud Date: 1988-07-31 | |
Final Drill Date: 1988-08-17 | |
Well Total Depth: 2225.00 m | |
Surface Hole Latitude: 52.374416 | |
Surface Hole Longitude: -113.658775 |
Date | Event |
---|---|
1988-07-14 | Obtained License |
1988-07-31 | Lost Circulation Occurred |
1988-08-02 | Surface Casing Operation Performed |
1988-08-17 | Finished Drilling |
1988-08-17 | Well Mode changed to Drilled and Cased |
1988-08-18 | Well Log Performed |
1988-08-19 | Production Casing Operation Performed |
1988-08-20 | Rig Released |
1988-09-05 | Perforation Treatment Performed - Jet Perforation |
1988-09-05 | Well Log Performed |
1988-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-08 | Well Began Production |
1988-09-08 | Well Fluid changed to Crude Oil |
1988-09-08 | Well Mode changed to Flowing |
1988-11-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-11-09 | Perforation Treatment Performed - Jet Perforation |
1988-11-09 | Well Log Performed |
1989-01-11 | Perforation Treatment Performed - Jet Perforation |
1989-01-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-01-12 | Well Log Performed |
1989-10-19 | Well Log Performed |
1989-11-14 | Well Log Performed |
1990-05-07 | Well Log Performed |
1990-05-11 | Perforation Treatment Performed - Cement Squeeze |
1990-05-14 | Well Log Performed |
1990-05-15 | Perforation Treatment Performed - Cement Squeeze |
1990-05-17 | Perforation Treatment Performed - Jet Perforation |
1990-05-17 | Well Log Performed |
1990-05-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-05-20 | Perforation Treatment Performed - Cement Squeeze |
1991-11-26 | Well Log Performed |
1991-11-29 | Perforation Treatment Performed - Cement Squeeze |
1991-12-04 | Well Log Performed |
1991-12-05 | Perforation Treatment Performed - Jet Perforation |
1991-12-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-03-27 | Well Fluid changed to Crude Oil |
1992-03-27 | Well Mode changed to Pumping |
1992-10-10 | Well Log Performed |
1992-10-11 | Well Log Performed |
1992-10-12 | Well Log Performed |
1992-10-13 | Perforation Treatment Performed - Jet Perforation |
1992-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-10-26 | Well Began Injection |
1992-10-26 | Well Fluid changed to Gas |
1992-10-26 | Well Type changed to Injection |
1992-11-22 | Perforation Treatment Performed - Jet Perforation |
1992-11-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-11-01 | Well Fluid changed to Crude Oil |
2002-11-01 | Well Mode changed to Flowing |
2002-12-17 | Perforation Treatment Performed - Cement Squeeze |
2003-01-12 | Well Log Performed |
2003-01-13 | Perforation Treatment Performed - Cement Squeeze |
2003-01-14 | Perforation Treatment Performed - Jet Perforation |
2003-01-14 | Well Log Performed |
2005-01-29 | Well Log Performed |
2005-01-30 | Perforation Treatment Performed - Cement Squeeze |
2005-01-31 | Perforation Treatment Performed - Jet Perforation |
2005-01-31 | Well Log Performed |
2005-02-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-02-03 | Perforation Treatment Performed - Jet Perforation |
2005-02-03 | Well Log Performed |
2005-02-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2008-01-16 | Well Fluid changed to Crude Oil |
2008-01-16 | Well Mode changed to Suspended |
2015-01-14 | Well Fluid changed to Crude Oil |
2015-01-14 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-09-05 | Perforation | 2151.00 | 2157.00 | 13 |
1990-05-19 | Acid Treatment | 2125.00 | 2129.00 | 0 |
1990-05-20 | Cement Squeeze | 2125.00 | 2129.00 | 0 |
1991-11-29 | Cement Squeeze | 2160.50 | 2166.30 | 0 |
1991-12-05 | Perforation | 2176.50 | 2179.50 | 13 |
1991-12-08 | Acid Treatment | 2176.50 | 2179.50 | 0 |
1992-10-13 | Perforation | 2112.00 | 2113.00 | 26 |
1992-10-22 | Acid Treatment | 2112.00 | 2113.00 | 0 |
1992-11-22 | Perforation | 2113.00 | 2117.00 | 13 |
1992-11-23 | Acid Treatment | 2112.00 | 2117.00 | 0 |
2002-12-17 | Cement Squeeze | 2112.00 | 2117.00 | 0 |
1988-09-06 | Acid Treatment | 2151.00 | 2157.00 | 0 |
2003-01-13 | Cement Squeeze | 2176.50 | 2179.50 | 0 |
2003-01-14 | Perforation | 2135.00 | 2140.00 | 13 |
2003-01-14 | Perforation | 2130.00 | 2135.00 | 13 |
2005-01-30 | Cement Squeeze | 2130.00 | 2140.00 | 0 |
2005-01-31 | Perforation | 2112.00 | 2114.50 | 17 |
2005-02-01 | Acid Treatment | 2112.00 | 2114.50 | 0 |
2005-02-03 | Perforation | 2117.00 | 2122.00 | 20 |
2005-02-04 | Acid Treatment | 2112.00 | 2122.00 | 0 |
1988-11-09 | Perforation | 2141.00 | 2147.00 | 13 |
1988-11-09 | Acid Treatment | 2141.00 | 2147.00 | 0 |
1989-01-11 | Perforation | 2160.50 | 2166.30 | 13 |
1989-01-12 | Acid Treatment | 2160.50 | 2166.30 | 0 |
1990-05-11 | Cement Squeeze | 2151.00 | 2157.00 | 0 |
1990-05-15 | Cement Squeeze | 2141.00 | 2147.00 | 0 |
1990-05-17 | Perforation | 2125.00 | 2129.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 839 | 0.0 | 0.0 | 0.0 |
1989 | 2848 | 0.0 | 0.0 | 0.0 |
1990 | 4944 | 0.0 | 0.0 | 0.0 |
1991 | 6578 | 0.0 | 0.0 | 0.0 |
1992 | 5243 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 1039 | 0.0 | 0.0 | 0.0 |
2003 | 3629 | 0.0 | 0.0 | 0.0 |
2004 | 8692 | 0.0 | 0.0 | 0.0 |
2005 | 4042 | 0.0 | 0.0 | 0.0 |
2006 | 4338 | 0.0 | 0.0 | 0.0 |
2015 | 2010 | 0.0 | 0.0 | 0.0 |
2016 | 3698 | 0.0 | 0.0 | 0.0 |
2017 | 6216 | 0.0 | 0.0 | 0.0 |
2018 | 7082 | 0.0 | 0.0 | 0.0 |
2019 | 5045 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-07-31 | Lost Circulation | 135.00 | 198.00 |
For data sources see[6]