X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394262101000

Well Details

Well ID: 0394262101000
Loading map...
Location: 00/01-21-039-26W4/0
Location Alias: 00/01-21-39-26 W4M
Location Alias 2: 00/01-21-039-26 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 26
Section: 21
County/Municipality: Lacombe County
Well Name: COGI JOFFRE 1-21-39-26
Operator Name: Canadian Oil & Gas International Inc.
License Number: 0016296
License Date: 1958-11-21
License Status: Suspension
Spud Date: 1958-11-24
Final Drill Date: 1958-12-15
Well Total Depth: 2112.90 m
Surface Hole Latitude: 52.363168
Surface Hole Longitude: -113.678911

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-21 Obtained License
1958-12-15 Finished Drilling
1958-12-15 Well Mode changed to Drilled and Cased
1958-12-16 Drill Stem Test Performed
1958-12-17 Perforation Treatment Performed - Open-Hole Completion
1958-12-17 Production Casing Operation Performed
1958-12-30 Well Began Production
1958-12-30 Well Fluid changed to Crude Oil
1958-12-30 Well Mode changed to Flowing
1959-05-06 Well Fluid changed to Crude Oil
1959-05-06 Well Mode changed to Pumping
1960-05-03 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-07-28 Well Fluid changed to Crude Oil
1961-07-28 Well Mode changed to Flowing
1962-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-06 Well Log Performed
2011-09-01 Well Fluid changed to Crude Oil
2011-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-12-17 Open Hole/Barefoot Completion 2079.30 2112.90 0
1960-05-03 Hydra Jet Perforation 2087.30 2087.60 0
1960-05-03 Hydra Jet Perforation 2087.90 2088.20 0
1960-05-03 Hydra Jet Perforation 2088.50 2088.80 0
1960-05-03 Hydra Jet Perforation 2089.10 2089.40 0
1960-05-03 Hydra Jet Perforation 2089.70 2090.00 0
1960-05-03 Hydra Jet Perforation 2090.30 2090.60 0
1960-05-03 Hydra Jet Perforation 2090.90 2091.20 0
1960-05-03 Hydra Jet Perforation 2091.50 2091.80 0
1960-05-03 Hydra Jet Perforation 2092.10 2092.50 0
1960-05-03 Hydra Jet Perforation 2092.80 2093.10 0
1960-05-03 Hydra Jet Perforation 2082.40 2082.70 0
1960-05-03 Hydra Jet Perforation 2093.40 2093.70 0
1960-05-03 Hydra Jet Perforation 2094.00 2094.30 0
1960-05-03 Hydra Jet Perforation 2094.60 2094.90 0
1960-05-03 Hydra Jet Perforation 2095.20 2095.50 0
1960-05-03 Hydra Jet Perforation 2095.80 2096.10 0
1960-05-03 Hydra Jet Perforation 2096.40 2096.70 0
1960-05-03 Hydra Jet Perforation 2097.00 2097.30 0
1960-05-03 Hydra Jet Perforation 2097.60 2097.90 0
1960-05-03 Hydra Jet Perforation 2098.20 2098.50 0
1960-05-03 Hydra Jet Perforation 2098.90 2099.20 0
1960-05-03 Hydra Jet Perforation 2083.00 2083.30 0
1960-05-03 Hydra Jet Perforation 2099.50 2099.80 0
1960-05-03 Hydra Jet Perforation 2100.10 2100.40 0
1960-05-03 Hydra Jet Perforation 2100.70 2101.00 0
1960-05-03 Hydra Jet Perforation 2101.30 2101.60 0
1960-05-03 Hydra Jet Perforation 2101.90 2102.20 0
1960-05-03 Hydra Jet Perforation 2102.50 2102.80 0
1960-05-03 Hydra Jet Perforation 2103.10 2103.40 0
1960-05-03 Hydra Jet Perforation 2103.70 2104.00 0
1960-05-03 Hydra Jet Perforation 2104.30 2104.30 0
1961-01-11 Acid Treatment 2082.40 2104.30 0
1960-05-03 Hydra Jet Perforation 2083.60 2083.90 0
1962-06-18 Acid Treatment 2082.40 2104.30 0
1977-09-20 Acid Treatment 2079.30 2111.70 0
2002-06-02 Acid Treatment 2079.00 2112.00 0
1960-05-03 Hydra Jet Perforation 2084.20 2084.50 0
1960-05-03 Hydra Jet Perforation 2084.80 2085.10 0
1960-05-03 Hydra Jet Perforation 2085.40 2085.70 0
1960-05-03 Hydra Jet Perforation 2086.10 2086.40 0
1960-05-03 Hydra Jet Perforation 2086.70 2087.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1970 5926 0.0 0.0 0.0
1971 5843 0.0 0.0 0.0
1972 6139 0.0 0.0 0.0
1973 1058 0.0 0.0 0.0
1974 1250 0.0 0.0 0.0
1975 354 0.0 0.0 0.0
1977 2240 0.0 0.0 0.0
1978 8161 0.0 0.0 0.0
1979 8320 0.0 0.0 0.0
1980 8382 0.0 0.0 0.0
1981 8560 0.0 0.0 0.0
1982 8045 0.0 0.0 0.0
1983 4637 0.0 0.0 0.0
1984 8644 0.0 0.0 0.0
1985 7180 0.0 0.0 0.0
1986 4452 0.0 0.0 0.0
1987 8450 0.0 0.0 0.0
1988 8521 0.0 0.0 0.0
1989 7368 0.0 0.0 0.0
1990 7898 0.0 0.0 0.0
1991 7623 0.0 0.0 0.0
1992 6625 0.0 0.0 0.0
1993 7090 0.0 0.0 0.0
1994 8201 0.0 0.0 0.0
1995 8522 0.0 0.0 0.0
1996 8682 0.0 0.0 0.0
1997 6907 0.0 0.0 0.0
1998 8598 0.0 0.0 0.0
1999 8603 0.0 0.0 0.0
2000 8479 0.0 0.0 0.0
2001 7991 0.0 0.0 0.0
2002 7309 0.0 0.0 0.0
2003 2712 0.0 0.0 0.0
2005 48 0.0 0.0 0.0

For data sources see[5]

References