If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394253115000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.401794,"lon":-113.590591,"icon":""}]} |
Location: 00/15-31-039-25W4/0 | |
Location Alias: 00/15-31-39-25 W4M | |
Location Alias 2: 00/15-31-039-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 31 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES LACOMBE 15-31-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0331712 | |
License Date: 2005-05-27 | |
License Status: Issued | |
Spud Date: 2005-07-05 | |
Final Drill Date: 2005-07-06 | |
Well Total Depth: 1019.00 m | |
Surface Hole Latitude: 52.401794 | |
Surface Hole Longitude: -113.590591 |
Date | Event |
---|---|
2005-05-27 | Obtained License |
2005-07-01 | Surface Casing Operation Performed |
2005-07-06 | Finished Drilling |
2005-07-06 | Production Casing Operation Performed |
2005-07-06 | Rig Released |
2005-07-06 | Well Mode changed to Drilled and Cased |
2005-08-02 | Well Log Performed |
2005-08-08 | Perforation Treatment Performed - Jet Perforation |
2005-08-30 | Perforation Treatment Performed - Fractured |
2006-12-22 | Well Began Production |
2006-12-22 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-12-22 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-08-08 | Perforation | 940.30 | 941.30 | 13 |
2005-08-08 | Perforation | 706.20 | 708.20 | 13 |
2005-08-08 | Perforation | 701.80 | 702.80 | 13 |
2005-08-08 | Perforation | 693.00 | 694.00 | 13 |
2005-08-08 | Perforation | 671.00 | 672.00 | 13 |
2005-08-08 | Perforation | 661.90 | 663.90 | 13 |
2005-08-08 | Perforation | 654.40 | 655.40 | 13 |
2005-08-08 | Perforation | 651.70 | 652.70 | 13 |
2005-08-08 | Perforation | 649.60 | 650.60 | 13 |
2005-08-08 | Perforation | 646.00 | 648.00 | 13 |
2005-08-08 | Perforation | 639.50 | 640.50 | 13 |
2005-08-08 | Perforation | 934.00 | 935.00 | 13 |
2005-08-08 | Perforation | 632.70 | 633.70 | 13 |
2005-08-08 | Perforation | 630.80 | 631.80 | 13 |
2005-08-08 | Perforation | 626.20 | 627.20 | 13 |
2005-08-08 | Perforation | 620.70 | 621.70 | 13 |
2005-08-08 | Perforation | 618.00 | 619.00 | 13 |
2005-08-08 | Perforation | 614.00 | 615.00 | 13 |
2005-08-08 | Perforation | 587.50 | 588.50 | 13 |
2005-08-08 | Perforation | 551.40 | 552.40 | 13 |
2005-08-08 | Perforation | 540.50 | 541.50 | 13 |
2005-08-08 | Perforation | 531.50 | 532.50 | 13 |
2005-08-08 | Perforation | 923.80 | 924.80 | 13 |
2005-08-08 | Perforation | 524.50 | 525.50 | 13 |
2005-08-08 | Perforation | 522.20 | 523.20 | 13 |
2005-08-08 | Perforation | 506.20 | 507.20 | 13 |
2005-08-08 | Perforation | 471.50 | 472.50 | 13 |
2005-08-08 | Perforation | 458.70 | 459.70 | 13 |
2005-08-08 | Perforation | 454.00 | 455.00 | 13 |
2005-08-08 | Perforation | 399.50 | 400.50 | 13 |
2005-08-08 | Perforation | 396.20 | 397.20 | 13 |
2005-08-08 | Perforation | 390.50 | 392.50 | 13 |
2005-08-08 | Perforation | 370.00 | 372.00 | 13 |
2005-08-08 | Perforation | 860.50 | 861.50 | 13 |
2005-08-08 | Perforation | 325.50 | 326.50 | 13 |
2005-08-08 | Perforation | 321.70 | 322.70 | 13 |
2005-08-08 | Perforation | 319.00 | 320.00 | 13 |
2005-08-08 | Perforation | 315.00 | 316.00 | 13 |
2005-08-08 | Perforation | 308.80 | 309.80 | 13 |
2005-08-08 | Perforation | 291.60 | 292.60 | 13 |
2005-08-08 | Perforation | 284.40 | 285.40 | 13 |
2005-08-08 | Perforation | 281.50 | 282.50 | 13 |
2005-08-30 | Fracture | 281.50 | 941.30 | 0 |
2005-08-08 | Perforation | 797.00 | 798.00 | 13 |
2005-08-08 | Perforation | 764.00 | 765.00 | 13 |
2005-08-08 | Perforation | 733.80 | 734.80 | 13 |
2005-08-08 | Perforation | 718.50 | 719.50 | 13 |
2005-08-08 | Perforation | 713.50 | 714.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 240 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]