If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394252506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.38238,"lon":-113.472219,"icon":""}]} |
Location: 00/06-25-039-25W4/0 | |
Location Alias: 00/06-25-39-25 W4M | |
Location Alias 2: 00/06-25-039-25 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 25 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES LACOMBE 6-25-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0346611 | |
License Date: 2005-12-22 | |
License Status: Issued | |
Spud Date: 2006-01-16 | |
Final Drill Date: 2006-01-18 | |
Well Total Depth: 908.00 m | |
Surface Hole Latitude: 52.382380 | |
Surface Hole Longitude: -113.472219 |
Date | Event |
---|---|
2005-12-22 | Obtained License |
2006-01-16 | Surface Casing Operation Performed |
2006-01-17 | Production Casing Operation Performed |
2006-01-18 | Finished Drilling |
2006-01-18 | Rig Released |
2006-01-18 | Well Mode changed to Drilled and Cased |
2006-01-27 | Well Log Performed |
2006-02-02 | Perforation Treatment Performed - Jet Perforation |
2006-02-09 | Perforation Treatment Performed - Jet Perforation |
2006-02-18 | Perforation Treatment Performed - Jet Perforation |
2006-02-24 | Perforation Treatment Performed - Jet Perforation |
2006-03-10 | Perforation Treatment Performed - Jet Perforation |
2006-06-05 | Perforation Treatment Performed - Fractured |
2006-06-08 | Well Fluid changed to Gas |
2006-06-08 | Well Mode changed to Testing |
2006-09-14 | Well Began Production |
2006-09-14 | Well Fluid changed to Gas |
2006-09-14 | Well Mode changed to Flowing |
2008-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-16 | Plug Back Performed |
2008-01-17 | Perforation Treatment Performed - Jet Perforation |
2008-01-19 | Perforation Treatment Performed - Fractured |
2008-02-01 | Well Fluid changed to Gas |
2008-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-02-02 | Perforation | 826.00 | 827.00 | 13 |
2006-06-05 | Fracture | 247.50 | 827.00 | 0 |
2008-01-16 | Packing Device Capped w/Cement | 814.00 | 822.00 | 0 |
2008-01-16 | Packing Device Capped w/Cement | 619.00 | 627.00 | 0 |
2008-01-16 | Packing Device Capped w/Cement | 589.00 | 597.00 | 0 |
2008-01-17 | Perforation | 559.00 | 560.00 | 7 |
2008-01-17 | Perforation | 556.30 | 557.30 | 7 |
2008-01-17 | Perforation | 550.50 | 552.50 | 7 |
2008-01-17 | Perforation | 537.80 | 538.80 | 7 |
2008-01-17 | Perforation | 519.20 | 520.20 | 7 |
2008-01-17 | Perforation | 497.50 | 499.00 | 7 |
2006-02-09 | Perforation | 602.00 | 603.00 | 13 |
2008-01-17 | Perforation | 481.30 | 482.30 | 7 |
2008-01-17 | Perforation | 473.10 | 474.10 | 7 |
2008-01-17 | Perforation | 465.80 | 466.80 | 7 |
2008-01-17 | Perforation | 456.80 | 457.80 | 7 |
2008-01-17 | Perforation | 444.20 | 445.20 | 7 |
2008-01-17 | Perforation | 427.70 | 428.70 | 7 |
2008-01-17 | Perforation | 418.80 | 419.80 | 7 |
2008-01-17 | Perforation | 209.00 | 210.00 | 7 |
2008-01-19 | Fracture | 209.00 | 560.00 | 0 |
2006-02-09 | Perforation | 631.80 | 632.80 | 13 |
2006-02-18 | Perforation | 405.50 | 406.50 | 13 |
2006-02-18 | Perforation | 485.10 | 486.10 | 13 |
2006-02-24 | Perforation | 341.00 | 342.00 | 13 |
2006-02-24 | Perforation | 359.00 | 360.00 | 13 |
2006-03-10 | Perforation | 247.50 | 248.50 | 13 |
2006-03-10 | Perforation | 293.40 | 295.40 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 2760 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 360 | 0.0 | 0.0 | 0.0 |
For data sources see[5]