If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394251706002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.353274,"lon":-113.568311,"icon":""}]} |
Location: 00/06-17-039-25W4/2 | |
Location Alias: 00/06-17-39-25 W4M | |
Location Alias 2: 00/06-17-039-25 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 25 | |
Section: 17 | |
County/Municipality: Lacombe County | |
Well Name: CPC RESOURCES JOFFRE 6-17-39-25 | |
Operator Name: Lynx Energy ULC | |
License Number: 0335957 | |
License Date: 2005-08-08 | |
License Status: Issued | |
Spud Date: 2005-09-08 | |
Final Drill Date: 2005-09-20 | |
Well Total Depth: 955.00 m | |
Surface Hole Latitude: 52.353274 | |
Surface Hole Longitude: -113.568311 |
Date | Event |
---|---|
2005-08-08 | Obtained License |
2005-09-05 | Surface Casing Operation Performed |
2005-09-20 | Finished Drilling |
2005-09-20 | Production Casing Operation Performed |
2005-09-20 | Rig Released |
2005-09-20 | Well Mode changed to Drilled and Cased |
2005-09-28 | Well Log Performed |
2005-10-08 | Perforation Treatment Performed - Jet Perforation |
2005-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-10-13 | Plug Back Performed |
2005-10-16 | Perforation Treatment Performed - Jet Perforation |
2005-11-04 | Perforation Treatment Performed - Fractured |
2005-11-11 | Well Began Production |
2005-11-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2005-11-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-10-08 | Perforation | 916.80 | 917.80 | 13 |
2005-10-16 | Perforation | 336.50 | 337.50 | 13 |
2005-10-16 | Perforation | 378.00 | 379.00 | 13 |
2005-10-16 | Perforation | 384.70 | 385.70 | 13 |
2005-10-16 | Perforation | 409.50 | 410.50 | 13 |
2005-10-16 | Perforation | 424.50 | 425.50 | 13 |
2005-10-16 | Perforation | 465.00 | 466.00 | 13 |
2005-10-16 | Perforation | 472.60 | 473.60 | 13 |
2005-10-16 | Perforation | 474.70 | 475.70 | 13 |
2005-10-16 | Perforation | 478.00 | 479.00 | 13 |
2005-10-16 | Perforation | 492.50 | 493.50 | 13 |
2005-10-13 | Packing Device Capped w/Cement | 902.00 | 911.00 | 0 |
2005-10-16 | Perforation | 513.00 | 514.00 | 13 |
2005-10-16 | Perforation | 522.00 | 523.00 | 13 |
2005-10-16 | Perforation | 524.00 | 525.00 | 13 |
2005-10-16 | Perforation | 538.00 | 539.00 | 13 |
2005-10-16 | Perforation | 546.00 | 547.00 | 13 |
2005-10-16 | Perforation | 552.50 | 553.50 | 13 |
2005-10-16 | Perforation | 554.60 | 555.60 | 13 |
2005-10-16 | Perforation | 564.00 | 565.00 | 13 |
2005-10-16 | Perforation | 578.00 | 579.00 | 13 |
2005-10-16 | Perforation | 581.00 | 582.00 | 13 |
2005-10-16 | Perforation | 237.50 | 238.50 | 13 |
2005-10-16 | Perforation | 586.00 | 587.00 | 13 |
2005-10-16 | Perforation | 589.30 | 592.30 | 13 |
2005-10-16 | Perforation | 593.60 | 594.60 | 13 |
2005-10-16 | Perforation | 599.00 | 600.00 | 13 |
2005-10-16 | Perforation | 609.00 | 610.00 | 13 |
2005-10-16 | Perforation | 613.60 | 614.60 | 13 |
2005-10-16 | Perforation | 644.10 | 645.10 | 13 |
2005-10-16 | Perforation | 888.60 | 889.60 | 13 |
2005-11-04 | Fracture | 237.50 | 889.60 | 0 |
2005-10-16 | Perforation | 239.60 | 242.60 | 13 |
2005-10-16 | Perforation | 245.30 | 246.30 | 13 |
2005-10-16 | Perforation | 249.00 | 250.00 | 13 |
2005-10-16 | Perforation | 254.00 | 255.00 | 13 |
2005-10-16 | Perforation | 262.40 | 263.40 | 13 |
2005-10-16 | Perforation | 332.60 | 333.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1224 | 0.0 | 0.0 | 0.0 |
2006 | 8747 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8669 | 0.0 | 0.0 | 0.0 |
2010 | 8698 | 0.0 | 0.0 | 0.0 |
2011 | 8628 | 0.0 | 0.0 | 0.0 |
2012 | 8726 | 0.0 | 0.0 | 0.0 |
2013 | 8713 | 0.0 | 0.0 | 0.0 |
2014 | 8749 | 0.0 | 0.0 | 0.0 |
2015 | 8755 | 0.0 | 0.0 | 0.0 |
2016 | 8759 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8711 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]