X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394251609000

Well Details

Well ID: 0394251609000
Loading map...
Location: 00/09-16-039-25W4/0
Location Alias: 00/09-16-39-25 W4M
Location Alias 2: 00/09-16-039-25 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 25
Section: 16
County/Municipality: Lacombe County
Well Name: CPC RESOURCES JOFFRE 9-16-39-25
Operator Name: Lynx Energy ULC
License Number: 0336343
License Date: 2005-08-12
License Status: Issued
Spud Date: 2005-09-21
Final Drill Date: 2005-09-22
Well Total Depth: 720.00 m
Surface Hole Latitude: 52.354799
Surface Hole Longitude: -113.532828

For data sources see[1][2]

Well History

Date Event
2005-08-12 Obtained License
2005-09-20 Surface Casing Operation Performed
2005-09-21 Production Casing Operation Performed
2005-09-22 Finished Drilling
2005-09-22 Rig Released
2005-09-22 Well Mode changed to Drilled and Cased
2005-09-25 Well Log Performed
2005-10-12 Perforation Treatment Performed - Jet Perforation
2005-10-17 Perforation Treatment Performed - Fractured
2005-10-25 Well Began Production
2005-10-25 Well Fluid changed to Coalbed Methane-Coals and Other
2005-10-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-10-12 Perforation 269.50 271.50 13
2005-10-12 Perforation 457.50 458.50 13
2005-10-12 Perforation 461.00 462.00 13
2005-10-12 Perforation 488.00 489.00 13
2005-10-12 Perforation 493.00 494.00 13
2005-10-12 Perforation 504.00 505.00 13
2005-10-12 Perforation 507.00 508.00 13
2005-10-12 Perforation 509.30 510.30 13
2005-10-12 Perforation 522.00 523.00 13
2005-10-12 Perforation 528.50 529.50 13
2005-10-12 Perforation 541.00 542.00 13
2005-10-12 Perforation 272.00 275.00 13
2005-10-12 Perforation 558.00 559.00 13
2005-10-12 Perforation 571.00 573.00 13
2005-10-12 Perforation 584.00 586.00 13
2005-10-12 Perforation 595.00 596.00 13
2005-10-12 Perforation 608.00 610.00 13
2005-10-12 Perforation 613.50 614.50 13
2005-10-12 Perforation 618.50 620.50 13
2005-10-12 Perforation 624.00 625.00 13
2005-10-12 Perforation 626.00 628.00 13
2005-10-12 Perforation 637.50 638.50 13
2005-10-12 Perforation 280.80 281.80 13
2005-10-12 Perforation 644.50 645.50 13
2005-10-12 Perforation 646.10 647.10 13
2005-10-17 Fracture 269.50 647.10 0
2005-10-12 Perforation 284.70 285.70 13
2005-10-12 Perforation 314.00 315.00 13
2005-10-12 Perforation 365.00 366.00 13
2005-10-12 Perforation 385.00 386.00 13
2005-10-12 Perforation 435.00 436.00 13
2005-10-12 Perforation 444.00 445.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1630 0.0 0.0 0.0
2006 8747 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8669 0.0 0.0 0.0
2010 8698 0.0 0.0 0.0
2011 8628 0.0 0.0 0.0
2012 8726 0.0 0.0 0.0
2013 8713 0.0 0.0 0.0
2014 8749 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References