X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243612002

Well Details

Well ID: 0394243612002
Loading map...
Location: 00/12-36-039-24W4/2
Location Alias: 00/12-36-39-24 W4M
Location Alias 2: 00/12-36-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 36
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 12-36-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030373
License Date: 1966-05-09
License Status: Suspension
Spud Date: 1966-05-29
Final Drill Date: 1966-06-09
Well Total Depth: 1909.60 m
Surface Hole Latitude: 52.399582
Surface Hole Longitude: -113.337177

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-05-09 Obtained License
1966-06-09 Drill Stem Test Performed
1966-06-09 Finished Drilling
1966-06-09 Well Mode changed to Drilled and Cased
1966-06-10 Drill Stem Test Performed
1966-06-11 Drill Stem Test Performed
1966-06-11 Production Casing Operation Performed
1966-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-18 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-18 Perforation Treatment Performed - Jet Perforation
1966-06-24 Perforation Treatment Performed - Jet Perforation
1966-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-25 Perforation Treatment Performed - Acid Wash - No Pressure
1966-06-28 Well Began Production
1966-06-28 Well Fluid changed to Crude Oil
1966-06-28 Well Mode changed to Flowing
1985-11-07 Well Fluid changed to Crude Oil
1985-11-07 Well Mode changed to Pumping
1987-07-13 Well Log Performed
1988-01-26 Perforation Treatment Performed - Cement Squeeze
1988-01-27 Perforation Treatment Performed - Jet Perforation
1988-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-04 Plug Back Performed
1988-02-04 Well Fluid changed to Crude Oil
1988-02-04 Well Mode changed to Pumping
1994-10-26 Well Log Performed
1994-10-28 Well Log Performed
1997-06-01 Well Fluid changed to Crude Oil
1997-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-18 Perforation 1882.70 1884.00 7
1988-02-04 Packing Device Capped w/Cement 1866.30 1874.50 0
1966-06-18 Acid Wash 1882.70 1884.00 0
1966-06-18 Acid Treatment 1882.70 1884.00 0
1966-06-24 Perforation 1847.10 1848.30 7
1966-06-25 Acid Wash 1847.10 1848.30 0
1966-06-25 Acid Treatment 1847.10 1848.30 0
1988-01-26 Cement Squeeze 1882.70 1884.00 0
1988-01-27 Perforation 1879.50 1881.00 13
1988-01-28 Acid Treatment 1879.50 1881.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5158 0.0 0.0 0.0
1968 4438 0.0 0.0 0.0
1969 4703 0.0 0.0 0.0
1970 3925 0.0 0.0 0.0
1971 6659 0.0 0.0 0.0
1972 7649 0.0 0.0 0.0
1973 8121 0.0 0.0 0.0
1974 3007 0.0 0.0 0.0
1975 5375 0.0 0.0 0.0
1976 3928 0.0 0.0 0.0
1977 7722 0.0 0.0 0.0
1978 7538 0.0 0.0 0.0
1979 8363 0.0 0.0 0.0
1980 8351 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 8465 0.0 0.0 0.0
1983 8511 0.0 0.0 0.0
1984 7973 0.0 0.0 0.0
1985 7602 0.0 0.0 0.0
1986 8251 0.0 0.0 0.0
1987 8308 0.0 0.0 0.0
1988 7828 0.0 0.0 0.0
1989 8191 0.0 0.0 0.0
1990 8455 0.0 0.0 0.0
1991 8277 0.0 0.0 0.0
1992 8532 0.0 0.0 0.0
1993 8205 0.0 0.0 0.0
1994 7984 0.0 0.0 0.0
1995 8412 0.0 0.0 0.0
1996 8159 0.0 0.0 0.0
1997 600 0.0 0.0 0.0

For data sources see[5]

References