If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243515002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.402276,"lon":-113.348434,"icon":""}]} |
Location: 00/15-35-039-24W4/2 | |
Location Alias: 00/15-35-39-24 W4M | |
Location Alias 2: 00/15-35-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 15-35-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0132337 | |
License Date: 1988-02-17 | |
License Status: Suspension | |
Spud Date: 1988-02-19 | |
Final Drill Date: 1988-02-29 | |
Well Total Depth: 1910.00 m | |
Surface Hole Latitude: 52.402276 | |
Surface Hole Longitude: -113.348434 |
Date | Event |
---|---|
1988-02-17 | Obtained License |
1988-02-20 | Surface Casing Operation Performed |
1988-02-29 | Finished Drilling |
1988-02-29 | Well Log Performed |
1988-02-29 | Well Mode changed to Drilled and Cased |
1988-03-01 | Well Log Performed |
1988-03-02 | Drill Stem Test Performed |
1988-03-03 | Production Casing Operation Performed |
1988-03-03 | Rig Released |
1988-03-11 | Well Log Performed |
1988-03-12 | Perforation Treatment Performed - Jet Perforation |
1988-03-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1988-03-14 | Perforation Treatment Performed - Cement Squeeze |
1988-03-14 | Perforation Treatment Performed - Jet Perforation |
1988-03-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1988-03-15 | Well Log Performed |
1988-03-16 | Perforation Treatment Performed - Jet Perforation |
1988-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-04-18 | Well Began Production |
1988-04-18 | Well Fluid changed to Crude Oil |
1988-04-18 | Well Mode changed to Pumping |
1994-12-21 | Perforation Treatment Performed - Cement Squeeze |
1994-12-21 | Perforation Treatment Performed - Jet Perforation |
1994-12-30 | Perforation Treatment Performed - Jet Perforation |
1994-12-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-04 | Perforation Treatment Performed - Jet Perforation |
1995-01-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-01-11 | Perforation Treatment Performed - Jet Perforation |
2002-08-29 | Perforation Treatment Performed - Cement Squeeze |
2002-08-29 | Perforation Treatment Performed - Jet Perforation |
2002-09-04 | Perforation Treatment Performed - Jet Perforation |
2002-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-12-31 | Well Fluid changed to Crude Oil |
2011-12-31 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-03-12 | Perforation | 1875.50 | 1876.50 | 13 |
1994-12-21 | Cement Squeeze | 1838.00 | 1840.00 | 0 |
1994-12-30 | Perforation | 1865.00 | 1867.00 | 17 |
1994-12-31 | Acid Treatment | 1865.00 | 1867.00 | 0 |
1995-01-04 | Perforation | 1823.00 | 1826.00 | 17 |
1995-01-05 | Acid Treatment | 1823.00 | 1826.00 | 0 |
1995-01-11 | Perforation | 1834.00 | 1836.50 | 17 |
2002-08-29 | Cement Squeeze | 1823.00 | 1826.00 | 0 |
2002-08-29 | Cement Squeeze | 1834.00 | 1836.50 | 0 |
2002-08-29 | Perforation | 1838.00 | 1840.00 | 17 |
2002-08-29 | Cement Squeeze | 1838.00 | 1840.00 | 0 |
1988-03-13 | Acid Wash | 1875.50 | 1876.50 | 0 |
2002-09-04 | Perforation | 1814.00 | 1815.00 | 26 |
2002-09-04 | Perforation | 1826.00 | 1829.50 | 26 |
2002-09-06 | Acid Treatment | 1814.00 | 1815.00 | 0 |
2002-09-06 | Acid Treatment | 1826.00 | 1829.50 | 0 |
1988-03-14 | Cement Squeeze | 1875.50 | 1876.50 | 0 |
1988-03-14 | Perforation | 1869.00 | 1871.00 | 13 |
1988-03-15 | Acid Wash | 1869.00 | 1871.00 | 0 |
1988-03-16 | Perforation | 1838.00 | 1840.00 | 13 |
1988-03-17 | Acid Treatment | 1838.00 | 1840.00 | 0 |
1994-12-21 | Cement Squeeze | 1869.00 | 1871.00 | 0 |
1994-12-21 | Perforation | 1838.00 | 1840.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 5885 | 0.0 | 0.0 | 0.0 |
1989 | 7884 | 0.0 | 0.0 | 0.0 |
1990 | 8428 | 0.0 | 0.0 | 0.0 |
1991 | 8195 | 0.0 | 0.0 | 0.0 |
1992 | 8522 | 0.0 | 0.0 | 0.0 |
1993 | 8349 | 0.0 | 0.0 | 0.0 |
1994 | 8490 | 0.0 | 0.0 | 0.0 |
1995 | 8076 | 0.0 | 0.0 | 0.0 |
1996 | 8354 | 0.0 | 0.0 | 0.0 |
1997 | 8373 | 0.0 | 0.0 | 0.0 |
1998 | 8572 | 0.0 | 0.0 | 0.0 |
1999 | 6735 | 0.0 | 0.0 | 0.0 |
2002 | 384 | 0.0 | 0.0 | 0.0 |
For data sources see[5]