X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243515000

Well Details

Well ID: 0394243515000
Loading map...
Location: 00/15-35-039-24W4/0
Location Alias: 00/15-35-39-24 W4M
Location Alias 2: 00/15-35-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 15-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0132337
License Date: 1988-02-17
License Status: Suspension
Spud Date: 1988-02-19
Final Drill Date: 1988-02-29
Well Total Depth: 1910.00 m
Surface Hole Latitude: 52.402276
Surface Hole Longitude: -113.348434

For data sources see[1][2]

Well History

Date Event
1988-02-17 Obtained License
1988-02-20 Surface Casing Operation Performed
1988-02-29 Finished Drilling
1988-02-29 Well Log Performed
1988-02-29 Well Mode changed to Drilled and Cased
1988-03-01 Well Log Performed
1988-03-02 Drill Stem Test Performed
1988-03-03 Production Casing Operation Performed
1988-03-03 Rig Released
1988-03-11 Well Log Performed
1988-03-12 Perforation Treatment Performed - Jet Perforation
1988-03-13 Perforation Treatment Performed - Acid Wash - No Pressure
1988-03-14 Perforation Treatment Performed - Cement Squeeze
1988-03-14 Perforation Treatment Performed - Jet Perforation
1988-03-15 Perforation Treatment Performed - Acid Wash - No Pressure
1988-03-15 Well Log Performed
1988-03-16 Perforation Treatment Performed - Jet Perforation
1988-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-04-21 Well Began Production
1988-04-21 Well Fluid changed to Crude Oil
1988-04-21 Well Mode changed to Pumping
1994-12-21 Perforation Treatment Performed - Cement Squeeze
1994-12-21 Perforation Treatment Performed - Jet Perforation
1994-12-30 Perforation Treatment Performed - Jet Perforation
1994-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-04 Perforation Treatment Performed - Jet Perforation
1995-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-11 Perforation Treatment Performed - Jet Perforation
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
2002-08-29 Perforation Treatment Performed - Cement Squeeze
2002-08-29 Perforation Treatment Performed - Jet Perforation
2002-09-04 Perforation Treatment Performed - Jet Perforation
2002-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-12 Perforation 1875.50 1876.50 13
1994-12-21 Cement Squeeze 1838.00 1840.00 0
1994-12-30 Perforation 1865.00 1867.00 17
1994-12-31 Acid Treatment 1865.00 1867.00 0
1995-01-04 Perforation 1823.00 1826.00 17
1995-01-05 Acid Treatment 1823.00 1826.00 0
1995-01-11 Perforation 1834.00 1836.50 17
2002-08-29 Cement Squeeze 1823.00 1826.00 0
2002-08-29 Cement Squeeze 1834.00 1836.50 0
2002-08-29 Perforation 1838.00 1840.00 17
2002-08-29 Cement Squeeze 1838.00 1840.00 0
1988-03-13 Acid Wash 1875.50 1876.50 0
2002-09-04 Perforation 1814.00 1815.00 26
2002-09-04 Perforation 1826.00 1829.50 26
2002-09-06 Acid Treatment 1814.00 1815.00 0
2002-09-06 Acid Treatment 1826.00 1829.50 0
1988-03-14 Cement Squeeze 1875.50 1876.50 0
1988-03-14 Perforation 1869.00 1871.00 13
1988-03-15 Acid Wash 1869.00 1871.00 0
1988-03-16 Perforation 1838.00 1840.00 13
1988-03-17 Acid Treatment 1838.00 1840.00 0
1994-12-21 Cement Squeeze 1869.00 1871.00 0
1994-12-21 Perforation 1838.00 1840.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5988 0.0 0.0 0.0
1989 7772 0.0 0.0 0.0
1990 7366 0.0 0.0 0.0
1991 7871 0.0 0.0 0.0
1992 8520 0.0 0.0 0.0
1993 8349 0.0 0.0 0.0
1994 12 0.0 0.0 0.0

For data sources see[5]

References