X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243514002

Well Details

Well ID: 0394243514002
Loading map...
Location: 00/14-35-039-24W4/2
Location Alias: 00/14-35-39-24 W4M
Location Alias 2: 00/14-35-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 14-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0082633
License Date: 1980-05-07
License Status: Suspension
Spud Date: 1980-05-21
Final Drill Date: 1980-06-07
Well Total Depth: 1891.00 m
Surface Hole Latitude: 52.403254
Surface Hole Longitude: -113.355472

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-07 Obtained License
1980-05-21 Lost Circulation Occurred
1980-06-07 Finished Drilling
1980-06-07 Well Log Performed
1980-06-07 Well Mode changed to Drilled and Cased
1980-06-08 Drill Stem Test Performed
1980-06-10 Drill Stem Test Performed
1980-06-11 Drill Stem Test Performed
1980-06-13 Production Casing Operation Performed
1980-07-09 Perforation Treatment Performed - Jet Perforation
1980-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-15 Perforation Treatment Performed - Jet Perforation
1980-07-15 Well Began Production
1980-07-15 Well Fluid changed to Crude Oil
1980-07-15 Well Mode changed to Pumping
1980-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-26 Perforation Treatment Performed - Cement Squeeze
1993-09-02 Perforation Treatment Performed - Jet Perforation
1993-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-03 Well Log Performed
1996-09-05 Perforation Treatment Performed - Cement Squeeze
1996-09-05 Plug Back Performed
1996-09-06 Perforation Treatment Performed - Cement Squeeze
1996-09-06 Plug Back Performed
1996-09-06 Well Fluid changed to Crude Oil
1996-09-06 Well Mode changed to Abandoned and Whipstocked
1996-09-09 Perforation Treatment Performed - Jet Perforation
1996-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-09-11 Plug Back Performed
1996-10-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-09 Perforation 1866.50 1869.50 13
1996-09-09 Perforation 1855.00 1858.00 13
1996-09-11 Packing Device Capped w/Cement 1838.50 1847.00 0
1980-07-11 Acid Treatment 1866.50 1869.50 0
1980-07-15 Perforation 1837.00 1843.00 13
1980-07-16 Acid Treatment 1837.00 1843.00 0
1993-08-26 Cement Squeeze 1837.00 1843.00 0
1993-09-02 Perforation 1833.00 1835.50 13
1993-11-15 Acid Treatment 1833.00 1835.50 0
1996-09-05 Cement Squeeze 1866.50 1869.50 0
1996-09-06 Cement Squeeze 1833.00 1835.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1686 0.0 0.0 0.0
1981 8471 0.0 0.0 0.0
1982 8110 0.0 0.0 0.0
1983 8519 0.0 0.0 0.0
1984 8306 0.0 0.0 0.0
1985 8561 0.0 0.0 0.0
1986 8227 0.0 0.0 0.0
1987 8356 0.0 0.0 0.0
1988 8681 0.0 0.0 0.0
1989 8169 0.0 0.0 0.0
1990 7358 0.0 0.0 0.0
1991 7728 0.0 0.0 0.0
1992 8147 0.0 0.0 0.0
1993 8095 0.0 0.0 0.0
1994 8521 0.0 0.0 0.0
1995 8206 0.0 0.0 0.0
1996 5694 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-05-21 Lost Circulation 20.00 61.00

For data sources see[6]

References