If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.403254,"lon":-113.355472,"icon":""}]} |
Location: 00/14-35-039-24W4/0 | |
Location Alias: 00/14-35-39-24 W4M | |
Location Alias 2: 00/14-35-039-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 14-35-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0082633 | |
License Date: 1980-05-07 | |
License Status: Suspension | |
Spud Date: 1980-05-21 | |
Final Drill Date: 1980-06-07 | |
Well Total Depth: 1891.00 m | |
Surface Hole Latitude: 52.403254 | |
Surface Hole Longitude: -113.355472 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-05-07 | Obtained License |
1980-05-21 | Lost Circulation Occurred |
1980-06-07 | Finished Drilling |
1980-06-07 | Well Log Performed |
1980-06-07 | Well Mode changed to Drilled and Cased |
1980-06-08 | Drill Stem Test Performed |
1980-06-10 | Drill Stem Test Performed |
1980-06-11 | Drill Stem Test Performed |
1980-06-13 | Production Casing Operation Performed |
1980-07-09 | Perforation Treatment Performed - Jet Perforation |
1980-07-10 | Well Began Production |
1980-07-10 | Well Fluid changed to Crude Oil |
1980-07-10 | Well Mode changed to Flowing |
1980-07-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-07-15 | Perforation Treatment Performed - Jet Perforation |
1980-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-12-15 | Well Fluid changed to Crude Oil |
1990-12-15 | Well Mode changed to Pumping |
1993-08-26 | Perforation Treatment Performed - Cement Squeeze |
1993-09-02 | Perforation Treatment Performed - Jet Perforation |
1993-11-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-09-03 | Well Log Performed |
1996-09-05 | Perforation Treatment Performed - Cement Squeeze |
1996-09-05 | Plug Back Performed |
1996-09-05 | Well Fluid changed to Crude Oil |
1996-09-05 | Well Mode changed to Abandoned Zone |
1996-09-06 | Perforation Treatment Performed - Cement Squeeze |
1996-09-06 | Plug Back Performed |
1996-09-09 | Perforation Treatment Performed - Jet Perforation |
1996-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-09-11 | Plug Back Performed |
1996-10-03 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-07-09 | Perforation | 1866.50 | 1869.50 | 13 |
1996-09-09 | Perforation | 1855.00 | 1858.00 | 13 |
1996-09-11 | Packing Device Capped w/Cement | 1838.50 | 1847.00 | 0 |
1980-07-11 | Acid Treatment | 1866.50 | 1869.50 | 0 |
1980-07-15 | Perforation | 1837.00 | 1843.00 | 13 |
1980-07-16 | Acid Treatment | 1837.00 | 1843.00 | 0 |
1993-08-26 | Cement Squeeze | 1837.00 | 1843.00 | 0 |
1993-09-02 | Perforation | 1833.00 | 1835.50 | 13 |
1993-11-15 | Acid Treatment | 1833.00 | 1835.50 | 0 |
1996-09-05 | Cement Squeeze | 1866.50 | 1869.50 | 0 |
1996-09-06 | Cement Squeeze | 1833.00 | 1835.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1980 | 2114 | 0.0 | 0.0 | 0.0 |
1981 | 8639 | 0.0 | 0.0 | 0.0 |
1982 | 8174 | 0.0 | 0.0 | 0.0 |
1983 | 8232 | 0.0 | 0.0 | 0.0 |
1984 | 8234 | 0.0 | 0.0 | 0.0 |
1985 | 8615 | 0.0 | 0.0 | 0.0 |
1986 | 8536 | 0.0 | 0.0 | 0.0 |
1987 | 8079 | 0.0 | 0.0 | 0.0 |
1988 | 8535 | 0.0 | 0.0 | 0.0 |
1989 | 8168 | 0.0 | 0.0 | 0.0 |
1990 | 7409 | 0.0 | 0.0 | 0.0 |
1991 | 7800 | 0.0 | 0.0 | 0.0 |
1992 | 8164 | 0.0 | 0.0 | 0.0 |
1993 | 8098 | 0.0 | 0.0 | 0.0 |
1994 | 8617 | 0.0 | 0.0 | 0.0 |
1995 | 7174 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-05-21 | Lost Circulation | 20.00 | 61.00 |
For data sources see[6]