If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394243512002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.399547,"lon":-113.359365,"icon":""}]} |
Location: 00/12-35-039-24W4/2 | |
Location Alias: 00/12-35-39-24 W4M | |
Location Alias 2: 00/12-35-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 35 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 12-35-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0030476 | |
License Date: 1966-05-27 | |
License Status: Suspension | |
Spud Date: 1966-05-29 | |
Final Drill Date: 1966-06-07 | |
Well Total Depth: 1889.80 m | |
Surface Hole Latitude: 52.399547 | |
Surface Hole Longitude: -113.359365 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-05-27 | Obtained License |
1966-06-07 | Finished Drilling |
1966-06-07 | Well Mode changed to Drilled and Cased |
1966-06-08 | Drill Stem Test Performed |
1966-06-09 | Production Casing Operation Performed |
1966-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-10 | Perforation Treatment Performed - Acid Wash - No Pressure |
1966-06-10 | Perforation Treatment Performed - Jet Perforation |
1966-06-15 | Well Began Production |
1966-06-15 | Well Fluid changed to Crude Oil |
1966-06-15 | Well Mode changed to Flowing |
1978-03-15 | Well Fluid changed to Crude Oil |
1978-03-15 | Well Mode changed to Pumping |
1980-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-03-18 | Well Fluid changed to Crude Oil |
1980-03-18 | Well Mode changed to Pumping |
1987-11-14 | Perforation Treatment Performed - Cement Squeeze |
1987-11-18 | Perforation Treatment Performed - Jet Perforation |
1987-11-18 | Well Log Performed |
1987-11-19 | Well Log Performed |
1987-11-20 | Well Log Performed |
1987-11-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-03 | Perforation Treatment Performed - Cement Squeeze |
1987-12-03 | Perforation Treatment Performed - Jet Perforation |
1987-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-12-09 | Perforation Treatment Performed - Jet Perforation |
1987-12-09 | Well Fluid changed to Crude Oil |
1987-12-09 | Well Mode changed to Pumping |
1987-12-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-06-01 | Well Fluid changed to Crude Oil |
1993-06-01 | Well Mode changed to Suspended |
2007-09-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-09-04 | Plug Back Performed |
2007-09-04 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-06-10 | Perforation | 1863.90 | 1864.80 | 7 |
1987-11-18 | Perforation | 1857.50 | 1858.70 | 7 |
1987-11-18 | Perforation | 1863.90 | 1864.80 | 7 |
1987-11-25 | Acid Treatment | 1857.50 | 1858.70 | 0 |
1987-12-03 | Cement Squeeze | 1857.50 | 1864.80 | 0 |
1987-12-03 | Perforation | 1855.20 | 1855.90 | 10 |
1987-12-04 | Acid Treatment | 1855.20 | 1855.90 | 0 |
1987-12-09 | Perforation | 1818.50 | 1820.50 | 7 |
1987-12-10 | Acid Treatment | 1818.50 | 1820.50 | 0 |
2007-09-04 | Packing Device Capped w/Cement | 1836.00 | 1843.00 | 0 |
1966-06-10 | Perforation | 1857.50 | 1858.70 | 7 |
1966-06-10 | Perforation | 1829.40 | 1830.30 | 7 |
1966-06-10 | Acid Wash | 1829.40 | 1830.30 | 0 |
1966-06-10 | Acid Wash | 1857.50 | 1863.90 | 0 |
1966-06-10 | Acid Treatment | 1829.40 | 1830.30 | 0 |
1966-06-10 | Acid Treatment | 1857.50 | 1863.90 | 0 |
1980-03-18 | Packing Device Capped w/Cement | 1835.00 | 1839.20 | 0 |
1987-11-14 | Cement Squeeze | 1829.40 | 1830.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 2823 | 0.0 | 0.0 | 0.0 |
1968 | 2660 | 0.0 | 0.0 | 0.0 |
1969 | 2940 | 0.0 | 0.0 | 0.0 |
1970 | 2796 | 0.0 | 0.0 | 0.0 |
1971 | 7362 | 0.0 | 0.0 | 0.0 |
1972 | 7257 | 0.0 | 0.0 | 0.0 |
1973 | 7706 | 0.0 | 0.0 | 0.0 |
1974 | 5473 | 0.0 | 0.0 | 0.0 |
1975 | 7799 | 0.0 | 0.0 | 0.0 |
1976 | 8032 | 0.0 | 0.0 | 0.0 |
1977 | 7842 | 0.0 | 0.0 | 0.0 |
1978 | 7548 | 0.0 | 0.0 | 0.0 |
1979 | 8220 | 0.0 | 0.0 | 0.0 |
1980 | 6627 | 0.0 | 0.0 | 0.0 |
1981 | 8759 | 0.0 | 0.0 | 0.0 |
1982 | 8195 | 0.0 | 0.0 | 0.0 |
1983 | 8486 | 0.0 | 0.0 | 0.0 |
1984 | 8331 | 0.0 | 0.0 | 0.0 |
1985 | 6787 | 0.0 | 0.0 | 0.0 |
1986 | 6747 | 0.0 | 0.0 | 0.0 |
1987 | 164 | 0.0 | 0.0 | 0.0 |
1988 | 7896 | 0.0 | 0.0 | 0.0 |
1989 | 7902 | 0.0 | 0.0 | 0.0 |
1990 | 7826 | 0.0 | 0.0 | 0.0 |
1991 | 7280 | 0.0 | 0.0 | 0.0 |
1992 | 720 | 0.0 | 0.0 | 0.0 |
1993 | 2399 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2007-09-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]