X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243511000

Well Details

Well ID: 0394243511000
Loading map...
Location: 00/11-35-039-24W4/0
Location Alias: 00/11-35-39-24 W4M
Location Alias 2: 00/11-35-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 11-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0132410
License Date: 1988-02-19
License Status: Suspension
Spud Date: 1988-02-23
Final Drill Date: 1988-03-07
Well Total Depth: 1902.00 m
Surface Hole Latitude: 52.399572
Surface Hole Longitude: -113.352533

For data sources see[1][2]

Well History

Date Event
1988-02-19 Obtained License
1988-02-23 Lost Circulation Occurred
1988-02-24 Surface Casing Operation Performed
1988-03-07 Finished Drilling
1988-03-07 Well Log Performed
1988-03-07 Well Mode changed to Drilled and Cased
1988-03-08 Production Casing Operation Performed
1988-03-09 Rig Released
1988-03-20 Well Log Performed
1988-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-21 Perforation Treatment Performed - Jet Perforation
1988-03-22 Perforation Treatment Performed - Cement Squeeze
1988-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-23 Perforation Treatment Performed - Jet Perforation
1988-03-23 Well Log Performed
1988-03-24 Perforation Treatment Performed - Jet Perforation
1988-03-25 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-25 Well Began Production
1988-04-25 Well Fluid changed to Crude Oil
1988-04-25 Well Mode changed to Pumping
1990-06-26 Perforation Treatment Performed - Cement Squeeze
1990-07-12 Perforation Treatment Performed - Jet Perforation
1990-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-20 Perforation Treatment Performed - Cement Squeeze
1990-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-21 Perforation Treatment Performed - Jet Perforation
1999-05-07 Perforation Treatment Performed - Jet Perforation
1999-05-15 Perforation Treatment Performed - Remedial Casing
1999-05-17 Perforation Treatment Performed - Remedial Casing
2002-08-06 Perforation Treatment Performed - Cement Squeeze
2002-08-07 Perforation Treatment Performed - Jet Perforation
2002-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-19 Plug Back Performed
2002-09-19 Well Fluid changed to Crude Oil
2002-09-19 Well Mode changed to Abandoned Zone
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-02 Plug Back Performed
2005-11-02 Well Log Performed
2018-09-19 Perforation Treatment Performed - Cement Plug
2018-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-20 Perforation Treatment Performed - Cement Squeeze
2018-09-20 Perforation Treatment Performed - Jet Perforation
2018-09-21 Perforation Treatment Performed - Cement Plug

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-03-21 Perforation 1867.00 1869.00 13
1990-07-13 Acid Treatment 1832.00 1864.00 0
1990-07-20 Cement Squeeze 1863.00 1864.00 0
1990-07-21 Perforation 1857.90 1860.70 14
1990-07-21 Acid Treatment 1857.90 1860.70 0
1999-05-07 Perforation 70.00 70.20 4
1999-05-07 Perforation 300.00 300.20 4
1999-05-15 Remedial Casing Cementing 70.00 70.20 0
1999-05-17 Remedial Casing Cementing 300.00 300.20 0
2002-08-06 Cement Squeeze 1857.90 1860.40 0
2002-08-07 Perforation 1852.00 1856.00 17
1988-03-21 Acid Treatment 1867.00 1869.00 0
2002-08-09 Acid Treatment 1852.00 1856.00 0
2002-09-19 Packing Device Capped w/Cement 1839.50 1847.50 0
2002-09-20 Perforation 1828.00 1831.00 17
2002-09-20 Perforation 1819.00 1825.00 17
2002-09-22 Acid Treatment 1819.00 1825.00 0
2005-11-02 Packing Device Capped w/Cement 1805.50 1813.50 0
2018-09-19 Cement Plug 1752.00 1805.50 0
2018-09-19 Cement Plug 610.30 963.00 0
2018-09-20 Perforation 545.00 546.00 20
2018-09-20 Cement Squeeze 545.00 546.00 0
1988-03-22 Cement Squeeze 1867.00 1869.00 0
2018-09-20 Packing Device Capped w/Cement 161.00 540.00 0
2018-09-21 Cement Plug 39.00 161.00 0
1988-03-23 Perforation 1862.00 1864.00 13
1988-03-23 Acid Treatment 1862.00 1864.00 0
1988-03-24 Perforation 1832.50 1833.50 13
1988-03-25 Acid Wash 1832.50 1864.00 0
1990-06-26 Cement Squeeze 1862.00 1864.00 0
1990-07-12 Perforation 1863.00 1864.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5546 0.0 0.0 0.0
1989 6576 0.0 0.0 0.0
1990 3843 0.0 0.0 0.0
1991 7320 0.0 0.0 0.0
1992 8153 0.0 0.0 0.0
1993 8325 0.0 0.0 0.0
1994 8554 0.0 0.0 0.0
1995 7766 0.0 0.0 0.0
1996 8271 0.0 0.0 0.0
1997 8039 0.0 0.0 0.0
1998 8485 0.0 0.0 0.0
1999 7010 0.0 0.0 0.0
2000 8460 0.0 0.0 0.0
2001 1536 0.0 0.0 0.0
2002 528 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-02-23 Lost Circulation 17.00 98.00
2018-09-21 No Incident Encountered 0.00 0.00

For data sources see[6]

References