X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243509000

Well Details

Well ID: 0394243509000
Loading map...
Location: 00/09-35-039-24W4/0
Location Alias: 00/09-35-39-24 W4M
Location Alias 2: 00/09-35-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 9-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0120062
License Date: 1985-12-05
License Status: Suspension
Spud Date: 1986-01-17
Final Drill Date: 1986-01-30
Well Total Depth: 1922.00 m
Surface Hole Latitude: 52.399595
Surface Hole Longitude: -113.342803

For data sources see[1][2]

Well History

Date Event
1985-12-05 Obtained License
1986-01-18 Surface Casing Operation Performed
1986-01-30 Finished Drilling
1986-01-30 Well Mode changed to Drilled and Cased
1986-01-31 Well Log Performed
1986-02-01 Production Casing Operation Performed
1986-02-01 Rig Released
1986-02-22 Well Log Performed
1986-02-23 Perforation Treatment Performed - Jet Perforation
1986-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-24 Well Log Performed
1986-02-25 Perforation Treatment Performed - Jet Perforation
1986-02-25 Well Log Performed
1986-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-13 Well Began Production
1986-05-13 Well Fluid changed to Crude Oil
1986-05-13 Well Mode changed to Flowing
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
1994-10-03 Well Log Performed
1994-10-04 Perforation Treatment Performed - Cement Squeeze
1994-10-06 Perforation Treatment Performed - Jet Perforation
1994-10-06 Well Log Performed
1994-10-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-13 Perforation Treatment Performed - Jet Perforation
1994-10-13 Well Fluid changed to Crude Oil
1994-10-13 Well Log Performed
1994-10-13 Well Mode changed to Abandoned Zone
1994-10-17 Perforation Treatment Performed - Jet Perforation
1994-10-17 Well Log Performed
1994-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-01 Well Log Performed
1999-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-06-02 Perforation Treatment Performed - Cement Squeeze
1999-06-03 Perforation Treatment Performed - Jet Perforation
1999-06-03 Well Log Performed
1999-06-04 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-23 Perforation 1881.00 1882.00 13
1994-10-13 Packing Device Capped w/Cement 1863.00 1870.00 0
1994-10-13 Perforation 1845.50 1846.50 18
1994-10-17 Perforation 1836.00 1839.00 18
1994-10-18 Acid Treatment 1836.00 1839.00 0
1999-06-02 Acid Treatment 1845.50 1846.50 0
1999-06-02 Cement Squeeze 1845.50 1846.50 0
1999-06-03 Perforation 1836.00 1841.00 13
1999-06-04 Acid Treatment 1836.00 1841.00 0
1986-02-24 Acid Treatment 1881.00 1882.00 0
1986-02-25 Perforation 1847.50 1848.00 7
1986-02-26 Acid Treatment 1847.50 1848.00 0
1994-10-04 Cement Squeeze 1881.00 1882.00 0
1994-10-04 Cement Squeeze 1847.50 1848.00 0
1994-10-06 Perforation 1873.00 1875.00 18
1994-10-06 Perforation 1876.00 1877.50 18
1994-10-11 Acid Treatment 1873.00 1877.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5226 0.0 0.0 0.0
1987 8428 0.0 0.0 0.0
1988 8615 0.0 0.0 0.0
1989 8395 0.0 0.0 0.0
1990 8364 0.0 0.0 0.0
1991 8283 0.0 0.0 0.0
1992 8323 0.0 0.0 0.0
1993 7981 0.0 0.0 0.0
1994 6467 0.0 0.0 0.0

For data sources see[5]

References