X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243506002

Well Details

Well ID: 0394243506002
Loading map...
Location: 00/06-35-039-24W4/2
Location Alias: 00/06-35-39-24 W4M
Location Alias 2: 00/06-35-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 35
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 6-35-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0102010
License Date: 1983-06-30
License Status: Suspension
Spud Date: 1983-07-20
Final Drill Date: 1983-08-03
Well Total Depth: 1902.00 m
Surface Hole Latitude: 52.395706
Surface Hole Longitude: -113.352862

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-06-30 Obtained License
1983-08-03 Finished Drilling
1983-08-03 Well Mode changed to Drilled and Cased
1983-08-04 Drill Stem Test Performed
1983-08-05 Drill Stem Test Performed
1983-08-07 Drill Stem Test Performed
1983-08-09 Production Casing Operation Performed
1983-08-26 Perforation Treatment Performed - Jet Perforation
1983-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-08-30 Perforation Treatment Performed - Jet Perforation
1983-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-17 Well Began Production
1983-09-17 Well Fluid changed to Crude Oil
1983-09-17 Well Mode changed to Pumping
1987-02-26 Well Log Performed
1988-04-08 Well Log Performed
1988-04-12 Perforation Treatment Performed - Cement Squeeze
1988-04-12 Perforation Treatment Performed - Jet Perforation
1988-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-26 Perforation Treatment Performed - Cement Squeeze
1990-06-01 Perforation Treatment Performed - Jet Perforation
1990-06-05 Perforation Treatment Performed - Jet Perforation
1992-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-23 Well Log Performed
1996-02-26 Perforation Treatment Performed - Cement Squeeze
1996-02-26 Well Log Performed
1996-02-28 Perforation Treatment Performed - Jet Perforation
1996-03-02 Perforation Treatment Performed - Cement Squeeze
1996-03-05 Well Log Performed
1996-03-06 Perforation Treatment Performed - Jet Perforation
1996-03-07 Well Fluid changed to Crude Oil
1996-03-07 Well Mode changed to Suspended
1996-03-08 Perforation Treatment Performed - Cement Squeeze
1996-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-03 Perforation Treatment Performed - Jet Perforation
2003-09-18 Well Log Performed
2019-11-22 Well Log Performed
2019-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-23 Perforation Treatment Performed - Cement Plug
2019-11-23 Plug Back Performed
2019-11-23 Well Fluid changed to Crude Oil
2019-11-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-08-26 Perforation 1858.50 1859.50 14
1990-06-01 Perforation 1852.00 1853.50 13
1990-06-05 Perforation 1823.30 1825.30 13
1992-02-15 Acid Treatment 1852.00 1853.50 0
1996-02-26 Cement Squeeze 1852.00 1853.50 0
1996-02-28 Perforation 1845.50 1847.50 17
1996-03-02 Cement Squeeze 1845.50 1847.50 0
1996-03-06 Perforation 1813.00 1815.50 17
1996-03-08 Cement Squeeze 1813.00 1815.50 0
1996-05-29 Acid Treatment 1823.30 1825.30 0
2003-02-01 Packing Device Capped w/Cement 1832.00 1840.00 0
1983-08-27 Acid Treatment 1858.50 1859.50 0
2003-02-02 Packing Device Capped w/Cement 1797.00 1805.00 0
2003-02-03 Perforation 1413.50 1416.00 17
2019-11-23 Cement Plug 1748.00 1797.00 0
2019-11-23 Packing Device Capped w/Cement 1399.00 1407.00 0
1983-08-30 Perforation 1826.50 1828.50 13
1983-08-31 Acid Treatment 1826.50 1828.50 0
1988-04-12 Cement Squeeze 1858.50 1859.40 0
1988-04-12 Perforation 1854.50 1855.50 13
1988-04-13 Acid Treatment 1854.50 1855.50 0
1990-05-26 Cement Squeeze 1854.50 1855.50 0
1990-05-26 Cement Squeeze 1826.50 1828.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2536 0.0 0.0 0.0
1984 8148 0.0 0.0 0.0
1985 8484 0.0 0.0 0.0
1986 8256 0.0 0.0 0.0
1987 8422 0.0 0.0 0.0
1988 8208 0.0 0.0 0.0
1989 6621 0.0 0.0 0.0
1990 4819 0.0 0.0 0.0
1991 8283 0.0 0.0 0.0
1992 7874 0.0 0.0 0.0
1993 8074 0.0 0.0 0.0
1994 8647 0.0 0.0 0.0
1995 8340 0.0 0.0 0.0
1996 816 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-24 No Incident Encountered 0.00 0.00

For data sources see[6]

References