X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394243416002

Well Details

Well ID: 0394243416002
Loading map...
Location: 00/16-34-039-24W4/2
Location Alias: 00/16-34-39-24 W4M
Location Alias 2: 00/16-34-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 34
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 16-34-39-24
Operator Name: Ember Resources Inc.
License Number: 0031469
License Date: 1966-12-15
License Status: Issued
Spud Date: 1966-12-30
Final Drill Date: 1967-01-08
Well Total Depth: 1895.90 m
Surface Hole Latitude: 52.403154
Surface Hole Longitude: -113.365591

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-15 Obtained License
1967-01-08 Finished Drilling
1967-01-08 Well Mode changed to Drilled and Cased
1967-01-10 Drill Stem Test Performed
1967-01-11 Production Casing Operation Performed
1967-01-12 Perforation Treatment Performed - Jet Perforation
1967-01-13 Perforation Treatment Performed - Acid Wash - No Pressure
1967-01-16 Well Began Production
1967-01-16 Well Fluid changed to Crude Oil
1967-01-16 Well Mode changed to Flowing
1976-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-05-26 Well Log Performed
1980-06-07 Well Log Performed
1980-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-06-10 Well Fluid changed to Crude Oil
1980-06-10 Well Mode changed to Pumping
1982-01-19 Perforation Treatment Performed - Cement Squeeze
1982-01-22 Perforation Treatment Performed - Jet Perforation
1982-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-07 Perforation Treatment Performed - Cement Squeeze
1982-05-11 Perforation Treatment Performed - Jet Perforation
1982-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-04 Perforation Treatment Performed - Jet Perforation
1992-11-06 Perforation Treatment Performed - Cement Squeeze
1992-11-10 Perforation Treatment Performed - Cement Squeeze
1992-11-10 Plug Back Performed
1992-11-10 Well Fluid changed to Crude Oil
1992-11-10 Well Mode changed to Abandoned Zone
1992-11-16 Perforation Treatment Performed - Jet Perforation
1992-11-18 Perforation Treatment Performed - Cement Squeeze
1992-11-18 Well Log Performed
1992-11-19 Well Log Performed
1992-11-20 Perforation Treatment Performed - Jet Perforation
1992-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-11-25 Plug Back Performed
1997-06-05 Perforation Treatment Performed - Jet Perforation
1997-06-05 Well Log Performed
1997-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-21 Perforation Treatment Performed - Jet Perforation
1998-11-21 Plug Back Performed
1998-11-21 Well Log Performed
1998-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-23 Well Log Performed
1998-12-16 Well Began Injection
1998-12-16 Well Fluid changed to Water
1998-12-16 Well Type changed to Disposal
2003-03-23 Perforation Treatment Performed - Jet Perforation
2012-09-30 Well Fluid changed to Water
2012-09-30 Well Mode changed to Suspended
2012-09-30 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-01-12 Perforation 1866.60 1867.50 13
1982-01-23 Acid Treatment 1837.00 1837.90 0
1982-05-07 Cement Squeeze 1837.00 1837.90 0
1982-05-11 Perforation 1828.40 1830.50 13
1982-05-12 Acid Treatment 1828.40 1830.50 0
1992-11-04 Perforation 1866.60 1867.50 13
1992-11-06 Cement Squeeze 1866.60 1867.50 0
1992-11-10 Cement Squeeze 1828.40 1830.50 0
1992-11-16 Perforation 1863.90 1865.40 18
1992-11-18 Cement Squeeze 1863.90 1865.40 0
1992-11-20 Perforation 1861.70 1862.90 18
1967-01-12 Perforation 1830.60 1831.50 13
1992-11-23 Acid Treatment 1861.70 1862.90 0
1992-11-25 Packing Device Capped w/Cement 1845.00 1853.00 0
1992-11-25 Packing Device Capped w/Cement 1816.00 1824.00 0
1997-06-05 Perforation 1872.50 1879.70 18
1997-06-06 Acid Treatment 1872.50 1879.70 0
1998-11-21 Packing Device Capped w/Cement 1847.00 1855.00 0
1998-11-21 Perforation 1827.20 1834.50 20
1998-11-22 Acid Treatment 1827.20 1834.50 0
2003-03-23 Perforation 1423.00 1426.00 17
1967-01-13 Acid Wash 1866.60 1867.50 0
1967-01-13 Acid Wash 1830.60 1831.50 0
1976-08-26 Acid Treatment 1830.60 1831.50 0
1976-10-21 Acid Treatment 1866.60 1867.50 0
1980-06-10 Packing Device Capped w/Cement 1835.30 1845.60 0
1982-01-19 Cement Squeeze 1830.60 1831.50 0
1982-01-22 Perforation 1837.00 1837.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 1671 0.0 0.0 0.0
1968 1404 0.0 0.0 0.0
1969 1373 0.0 0.0 0.0
1970 1052 0.0 0.0 0.0
1972 2760 0.0 0.0 0.0
1973 7949 0.0 0.0 0.0
1974 5648 0.0 0.0 0.0
1975 4012 0.0 0.0 0.0
1976 4790 0.0 0.0 0.0
1977 6652 0.0 0.0 0.0
1978 7661 0.0 0.0 0.0
1979 8553 0.0 0.0 0.0
1980 5016 0.0 0.0 0.0
1981 7211 0.0 0.0 0.0
1982 4909 0.0 0.0 0.0
1983 7465 0.0 0.0 0.0
1984 120 0.0 0.0 0.0
1985 1944 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

References