X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242708003

Well Details

Well ID: 0394242708003
Loading map...
Location: 00/08-27-039-24W4/3
Location Alias: 00/08-27-39-24 W4M
Location Alias 2: 00/08-27-039-24 W4/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 27
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-27-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0032255
License Date: 1967-06-09
License Status: Suspension
Spud Date: 1967-06-15
Final Drill Date: 1967-06-24
Well Total Depth: 1905.00 m
Surface Hole Latitude: 52.381442
Surface Hole Longitude: -113.365618

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-06-09 Obtained License
1967-06-24 Finished Drilling
1967-06-24 Well Mode changed to Drilled and Cased
1967-06-25 Drill Stem Test Performed
1967-06-26 Production Casing Operation Performed
1967-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-06-28 Perforation Treatment Performed - Jet Perforation
1996-11-27 Well Log Performed
1996-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-28 Plug Back Performed
1996-11-28 Well Log Performed
1996-11-29 Perforation Treatment Performed - Jet Perforation
1996-12-05 Perforation Treatment Performed - Fractured
1997-01-15 Well Began Production
1997-01-15 Well Fluid changed to Crude Oil
1997-01-15 Well Mode changed to Pumping
1997-04-09 Well Fluid changed to Crude Oil
1997-04-09 Well Mode changed to Suspended
1999-02-20 Perforation Treatment Performed - Cement Squeeze
1999-02-20 Plug Back Performed
1999-02-20 Well Fluid changed to Crude Oil
1999-02-20 Well Mode changed to Abandoned Zone
1999-02-25 Perforation Treatment Performed - Jet Perforation
1999-02-25 Well Log Performed
1999-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-26 Well Log Performed
1999-02-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-06-28 Perforation 1886.70 1887.30 13
1999-02-25 Perforation 1848.30 1854.10 17
1999-02-26 Acid Treatment 1848.30 1854.10 0
1967-06-28 Perforation 1848.30 1849.20 13
1967-06-28 Acid Treatment 1886.70 1887.30 0
1967-06-28 Acid Treatment 1886.70 1887.30 0
1996-11-28 Packing Device Capped w/Cement 1852.00 1860.00 0
1996-11-28 Packing Device Capped w/Cement 1830.00 1838.00 0
1996-11-29 Perforation 1572.80 1574.00 17
1996-12-05 Fracture 1572.80 1574.00 0
1999-02-20 Cement Squeeze 1572.70 1574.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 309 0.0 0.0 0.0
1997 2116 0.0 0.0 0.0

For data sources see[5]

References