X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242708000

Well Details

Well ID: 0394242708000
Loading map...
Location: 00/08-27-039-24W4/0
Location Alias: 00/08-27-39-24 W4M
Location Alias 2: 00/08-27-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 27
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 8-27-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0032255
License Date: 1967-06-09
License Status: Suspension
Spud Date: 1967-06-15
Final Drill Date: 1967-06-24
Well Total Depth: 1905.00 m
Surface Hole Latitude: 52.381442
Surface Hole Longitude: -113.365618

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-06-09 Obtained License
1967-06-24 Finished Drilling
1967-06-24 Well Mode changed to Drilled and Cased
1967-06-25 Drill Stem Test Performed
1967-06-26 Production Casing Operation Performed
1967-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-06-28 Perforation Treatment Performed - Jet Perforation
1967-07-03 Well Began Production
1967-07-03 Well Fluid changed to Crude Oil
1967-07-03 Well Mode changed to Flowing
1981-04-16 Well Fluid changed to Crude Oil
1981-04-16 Well Mode changed to Pumping
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
1996-11-27 Well Log Performed
1996-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-28 Plug Back Performed
1996-11-28 Well Fluid changed to Crude Oil
1996-11-28 Well Log Performed
1996-11-28 Well Mode changed to Abandoned Zone
1996-11-29 Perforation Treatment Performed - Jet Perforation
1996-12-05 Perforation Treatment Performed - Fractured
1999-02-20 Perforation Treatment Performed - Cement Squeeze
1999-02-20 Plug Back Performed
1999-02-25 Perforation Treatment Performed - Jet Perforation
1999-02-25 Well Log Performed
1999-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-02-26 Well Log Performed
1999-02-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-06-28 Perforation 1886.70 1887.30 13
1999-02-25 Perforation 1848.30 1854.10 17
1999-02-26 Acid Treatment 1848.30 1854.10 0
1967-06-28 Perforation 1848.30 1849.20 13
1967-06-28 Acid Treatment 1886.70 1887.30 0
1967-06-28 Acid Treatment 1886.70 1887.30 0
1996-11-28 Packing Device Capped w/Cement 1852.00 1860.00 0
1996-11-28 Packing Device Capped w/Cement 1830.00 1838.00 0
1996-11-29 Perforation 1572.80 1574.00 17
1996-12-05 Fracture 1572.80 1574.00 0
1999-02-20 Cement Squeeze 1572.70 1574.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 1493 0.0 0.0 0.0
1968 856 0.0 0.0 0.0
1969 1961 0.0 0.0 0.0
1970 2774 0.0 0.0 0.0
1971 3664 0.0 0.0 0.0
1972 7381 0.0 0.0 0.0
1973 5763 0.0 0.0 0.0
1974 5481 0.0 0.0 0.0
1975 7872 0.0 0.0 0.0
1976 8045 0.0 0.0 0.0
1977 7992 0.0 0.0 0.0
1978 7680 0.0 0.0 0.0
1979 8244 0.0 0.0 0.0
1980 8447 0.0 0.0 0.0
1981 2490 0.0 0.0 0.0
1982 7800 0.0 0.0 0.0
1983 8731 0.0 0.0 0.0
1984 8399 0.0 0.0 0.0
1985 8717 0.0 0.0 0.0
1986 8231 0.0 0.0 0.0
1987 8398 0.0 0.0 0.0
1988 1800 0.0 0.0 0.0

For data sources see[5]

References