If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394242614002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.388997,"lon":-113.353084,"icon":""}]} |
Location: 00/14-26-039-24W4/2 | |
Location Alias: 00/14-26-39-24 W4M | |
Location Alias 2: 00/14-26-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 11-26-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0108126 | |
License Date: 1984-07-10 | |
License Status: Suspension | |
Spud Date: 1984-07-25 | |
Final Drill Date: 1984-08-05 | |
Well Total Depth: 1913.00 m | |
Surface Hole Latitude: 52.388997 | |
Surface Hole Longitude: -113.353084 |
Date | Event |
---|---|
1984-07-10 | Obtained License |
1984-07-25 | Direction Drilling Operation Performed - Straighten Hole |
1984-07-25 | Surface Casing Operation Performed |
1984-08-05 | Finished Drilling |
1984-08-05 | Well Log Performed |
1984-08-05 | Well Mode changed to Drilled and Cased |
1984-08-07 | Drill Stem Test Performed |
1984-08-09 | Production Casing Operation Performed |
1984-08-09 | Rig Released |
1984-09-20 | Well Log Performed |
1984-09-21 | Perforation Treatment Performed - Jet Perforation |
1984-09-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-09-25 | Perforation Treatment Performed - Jet Perforation |
1984-09-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-12-13 | Well Began Production |
1984-12-13 | Well Fluid changed to Crude Oil |
1984-12-13 | Well Mode changed to Pumping |
1991-02-04 | Well Log Performed |
1991-02-06 | Perforation Treatment Performed - Cement Squeeze |
1991-02-07 | Well Log Performed |
1991-02-08 | Perforation Treatment Performed - Jet Perforation |
1991-02-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-02-11 | Well Log Performed |
1991-02-13 | Perforation Treatment Performed - Jet Perforation |
1991-02-15 | Perforation Treatment Performed - Cement Squeeze |
1991-02-19 | Well Log Performed |
1991-02-20 | Perforation Treatment Performed - Jet Perforation |
1991-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-03-01 | Well Fluid changed to Crude Oil |
1994-03-01 | Well Mode changed to Suspended |
1996-05-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-25 | Plug Back Performed |
1996-05-25 | Well Fluid changed to Crude Oil |
1996-05-25 | Well Mode changed to Abandoned and Whipstocked |
1996-07-14 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1984-07-25 | 196.00 | Straighten Hole |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-09-21 | Perforation | 1876.00 | 1876.50 | 7 |
1991-02-15 | Cement Squeeze | 1832.50 | 1834.50 | 0 |
1991-02-20 | Perforation | 1832.10 | 1832.90 | 16 |
1991-02-21 | Acid Treatment | 1832.10 | 1832.90 | 0 |
1996-05-25 | Packing Device Capped w/Cement | 1861.00 | 1869.00 | 0 |
1996-05-25 | Packing Device Capped w/Cement | 1822.00 | 1830.00 | 0 |
1984-09-22 | Acid Treatment | 1876.00 | 1876.50 | 0 |
1984-09-25 | Perforation | 1841.00 | 1842.00 | 7 |
1984-09-26 | Acid Treatment | 1841.00 | 1842.00 | 0 |
1991-02-06 | Cement Squeeze | 1876.00 | 1876.50 | 0 |
1991-02-06 | Cement Squeeze | 1841.00 | 1842.00 | 0 |
1991-02-08 | Perforation | 1871.20 | 1872.20 | 16 |
1991-02-09 | Acid Treatment | 1871.20 | 1872.20 | 0 |
1991-02-13 | Perforation | 1832.50 | 1834.50 | 16 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 434 | 0.0 | 0.0 | 0.0 |
1985 | 8556 | 0.0 | 0.0 | 0.0 |
1986 | 8280 | 0.0 | 0.0 | 0.0 |
1987 | 8428 | 0.0 | 0.0 | 0.0 |
1988 | 8687 | 0.0 | 0.0 | 0.0 |
1989 | 8371 | 0.0 | 0.0 | 0.0 |
1990 | 8466 | 0.0 | 0.0 | 0.0 |
1991 | 6332 | 0.0 | 0.0 | 0.0 |
For data sources see[6]