X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242614002

Well Details

Well ID: 0394242614002
Loading map...
Location: 00/14-26-039-24W4/2
Location Alias: 00/14-26-39-24 W4M
Location Alias 2: 00/14-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 11-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0108126
License Date: 1984-07-10
License Status: Suspension
Spud Date: 1984-07-25
Final Drill Date: 1984-08-05
Well Total Depth: 1913.00 m
Surface Hole Latitude: 52.388997
Surface Hole Longitude: -113.353084

For data sources see[1][2]

Well History

Date Event
1984-07-10 Obtained License
1984-07-25 Direction Drilling Operation Performed - Straighten Hole
1984-07-25 Surface Casing Operation Performed
1984-08-05 Finished Drilling
1984-08-05 Well Log Performed
1984-08-05 Well Mode changed to Drilled and Cased
1984-08-07 Drill Stem Test Performed
1984-08-09 Production Casing Operation Performed
1984-08-09 Rig Released
1984-09-20 Well Log Performed
1984-09-21 Perforation Treatment Performed - Jet Perforation
1984-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-25 Perforation Treatment Performed - Jet Perforation
1984-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-12-13 Well Began Production
1984-12-13 Well Fluid changed to Crude Oil
1984-12-13 Well Mode changed to Pumping
1991-02-04 Well Log Performed
1991-02-06 Perforation Treatment Performed - Cement Squeeze
1991-02-07 Well Log Performed
1991-02-08 Perforation Treatment Performed - Jet Perforation
1991-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-11 Well Log Performed
1991-02-13 Perforation Treatment Performed - Jet Perforation
1991-02-15 Perforation Treatment Performed - Cement Squeeze
1991-02-19 Well Log Performed
1991-02-20 Perforation Treatment Performed - Jet Perforation
1991-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Well Fluid changed to Crude Oil
1994-03-01 Well Mode changed to Suspended
1996-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-25 Plug Back Performed
1996-05-25 Well Fluid changed to Crude Oil
1996-05-25 Well Mode changed to Abandoned and Whipstocked
1996-07-14 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-07-25 196.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-21 Perforation 1876.00 1876.50 7
1991-02-15 Cement Squeeze 1832.50 1834.50 0
1991-02-20 Perforation 1832.10 1832.90 16
1991-02-21 Acid Treatment 1832.10 1832.90 0
1996-05-25 Packing Device Capped w/Cement 1861.00 1869.00 0
1996-05-25 Packing Device Capped w/Cement 1822.00 1830.00 0
1984-09-22 Acid Treatment 1876.00 1876.50 0
1984-09-25 Perforation 1841.00 1842.00 7
1984-09-26 Acid Treatment 1841.00 1842.00 0
1991-02-06 Cement Squeeze 1876.00 1876.50 0
1991-02-06 Cement Squeeze 1841.00 1842.00 0
1991-02-08 Perforation 1871.20 1872.20 16
1991-02-09 Acid Treatment 1871.20 1872.20 0
1991-02-13 Perforation 1832.50 1834.50 16

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 434 0.0 0.0 0.0
1985 8556 0.0 0.0 0.0
1986 8280 0.0 0.0 0.0
1987 8428 0.0 0.0 0.0
1988 8687 0.0 0.0 0.0
1989 8371 0.0 0.0 0.0
1990 8466 0.0 0.0 0.0
1991 6332 0.0 0.0 0.0

For data sources see[6]

References