X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242611002

Well Details

Well ID: 0394242611002
Loading map...
Location: 00/11-26-039-24W4/2
Location Alias: 00/11-26-39-24 W4M
Location Alias 2: 00/11-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 11-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0118454
License Date: 1985-10-21
License Status: Suspension
Spud Date: 1985-10-23
Final Drill Date: 1985-11-04
Well Total Depth: 1935.00 m
Surface Hole Latitude: 52.385094
Surface Hole Longitude: -113.354349

For data sources see[1][2]

Well History

Date Event
1985-10-21 Obtained License
1985-10-24 Surface Casing Operation Performed
1985-11-04 Finished Drilling
1985-11-04 Well Mode changed to Drilled and Cased
1985-11-05 Drill Stem Test Performed
1985-11-05 Well Log Performed
1985-11-07 Drill Stem Test Performed
1985-11-09 Production Casing Operation Performed
1985-11-10 Rig Released
1985-12-02 Well Log Performed
1985-12-03 Perforation Treatment Performed - Jet Perforation
1985-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-04 Well Log Performed
1985-12-05 Perforation Treatment Performed - Jet Perforation
1985-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-17 Well Began Production
1986-01-17 Well Fluid changed to Crude Oil
1986-01-17 Well Mode changed to Pumping
1989-07-21 Perforation Treatment Performed - Cement Squeeze
1989-07-25 Perforation Treatment Performed - Jet Perforation
1989-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-07-09 Perforation Treatment Performed - Cement Squeeze
1992-07-09 Plug Back Performed
1992-07-09 Well Fluid changed to Crude Oil
1992-07-09 Well Mode changed to Abandoned Zone
1992-07-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-12-03 Perforation 1886.50 1887.50 13
1992-07-13 Perforation 1882.00 1883.50 18
1985-12-04 Acid Treatment 1886.50 1887.50 0
1985-12-05 Perforation 1854.00 1855.00 13
1985-12-06 Acid Treatment 1854.00 1855.00 0
1989-07-21 Cement Squeeze 1854.00 1855.00 0
1989-07-25 Perforation 1844.50 1846.00 13
1989-07-26 Acid Treatment 1844.50 1846.00 0
1992-07-09 Cement Squeeze 1886.50 1887.50 0
1992-07-09 Cement Squeeze 1844.50 1846.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 7548 0.0 0.0 0.0
1987 8440 0.0 0.0 0.0
1988 8687 0.0 0.0 0.0
1989 8080 0.0 0.0 0.0
1990 8438 0.0 0.0 0.0
1991 7991 0.0 0.0 0.0
1992 1560 0.0 0.0 0.0

For data sources see[5]

References