If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394242610020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.385528,"lon":-113.34599,"icon":""}]} |
Location: 02/10-26-039-24W4/0 | |
Location Alias: 02/10-26-39-24 W4M | |
Location Alias 2: 02/10-26-039-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 26 | |
County/Municipality: Lacombe County | |
Well Name: EMBER 102 CLIVE 10-26-39-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0360906 | |
License Date: 2006-07-27 | |
License Status: Issued | |
Spud Date: 2006-08-25 | |
Final Drill Date: 2006-08-26 | |
Well Total Depth: 588.00 m | |
Surface Hole Latitude: 52.385528 | |
Surface Hole Longitude: -113.345990 |
Date | Event |
---|---|
2006-07-27 | Obtained License |
2006-08-26 | Finished Drilling |
2006-08-26 | Surface Casing Operation Performed |
2006-08-26 | Well Mode changed to Drilled and Cased |
2006-08-27 | Production Casing Operation Performed |
2006-08-27 | Rig Released |
2006-09-09 | Well Log Performed |
2006-10-09 | Perforation Treatment Performed - Jet Perforation |
2006-10-09 | Well Log Performed |
2006-11-04 | Perforation Treatment Performed - Fractured |
2006-11-06 | Well Began Production |
2006-11-06 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-11-06 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-10-09 | Perforation | 514.00 | 515.00 | 17 |
2006-10-09 | Perforation | 428.30 | 428.80 | 17 |
2006-10-09 | Perforation | 418.50 | 419.00 | 17 |
2006-10-09 | Perforation | 415.80 | 416.30 | 17 |
2006-10-09 | Perforation | 400.00 | 400.50 | 17 |
2006-10-09 | Perforation | 396.50 | 397.00 | 17 |
2006-10-09 | Perforation | 383.00 | 384.00 | 17 |
2006-10-09 | Perforation | 380.00 | 382.00 | 17 |
2006-10-09 | Perforation | 373.30 | 373.80 | 17 |
2006-10-09 | Perforation | 367.50 | 368.00 | 17 |
2006-10-09 | Perforation | 335.50 | 336.00 | 17 |
2006-10-09 | Perforation | 508.50 | 509.50 | 17 |
2006-10-09 | Perforation | 318.00 | 319.00 | 17 |
2006-11-04 | Fracture | 318.00 | 319.00 | 0 |
2006-11-04 | Fracture | 335.50 | 336.00 | 0 |
2006-11-04 | Fracture | 367.50 | 368.00 | 0 |
2006-11-04 | Fracture | 373.30 | 373.80 | 0 |
2006-11-04 | Fracture | 380.00 | 382.00 | 0 |
2006-11-04 | Fracture | 383.00 | 384.00 | 0 |
2006-11-04 | Fracture | 396.50 | 397.00 | 0 |
2006-11-04 | Fracture | 400.00 | 400.50 | 0 |
2006-11-04 | Fracture | 415.80 | 416.30 | 0 |
2006-10-09 | Perforation | 505.00 | 507.00 | 17 |
2006-11-04 | Fracture | 418.50 | 419.00 | 0 |
2006-11-04 | Fracture | 428.30 | 428.80 | 0 |
2006-11-04 | Fracture | 445.30 | 446.30 | 0 |
2006-11-04 | Fracture | 454.50 | 455.00 | 0 |
2006-11-04 | Fracture | 468.00 | 468.50 | 0 |
2006-11-04 | Fracture | 483.00 | 483.50 | 0 |
2006-11-04 | Fracture | 488.00 | 489.00 | 0 |
2006-11-04 | Fracture | 492.00 | 493.00 | 0 |
2006-11-04 | Fracture | 505.00 | 507.00 | 0 |
2006-11-04 | Fracture | 508.50 | 509.50 | 0 |
2006-10-09 | Perforation | 492.00 | 493.00 | 17 |
2006-11-04 | Fracture | 514.00 | 515.00 | 0 |
2006-10-09 | Perforation | 488.00 | 489.00 | 17 |
2006-10-09 | Perforation | 483.00 | 483.50 | 17 |
2006-10-09 | Perforation | 468.00 | 468.50 | 17 |
2006-10-09 | Perforation | 454.50 | 455.00 | 17 |
2006-10-09 | Perforation | 445.30 | 446.30 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1302 | 0.0 | 0.0 | 0.0 |
2007 | 8755 | 0.0 | 0.0 | 0.0 |
2008 | 8718 | 0.0 | 0.0 | 0.0 |
2009 | 8752 | 0.0 | 0.0 | 0.0 |
2010 | 8738 | 0.0 | 0.0 | 0.0 |
2011 | 8745 | 0.0 | 0.0 | 0.0 |
2012 | 8723 | 0.0 | 0.0 | 0.0 |
2013 | 8755 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8753 | 0.0 | 0.0 | 0.0 |
2016 | 8678 | 0.0 | 0.0 | 0.0 |
2017 | 8290 | 0.0 | 0.0 | 0.0 |
2018 | 8429 | 0.0 | 0.0 | 0.0 |
2019 | 8177 | 0.0 | 0.0 | 0.0 |
2020 | 1694 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2006-11-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]