X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242610000

Well Details

Well ID: 0394242610000
Loading map...
Location: 00/10-26-039-24W4/0
Location Alias: 00/10-26-39-24 W4M
Location Alias 2: 00/10-26-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0030789
License Date: 1966-08-08
License Status: Suspension
Spud Date: 1966-08-12
Final Drill Date: 1966-08-24
Well Total Depth: 1907.70 m
Surface Hole Latitude: 52.385144
Surface Hole Longitude: -113.348432

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-08 Obtained License
1966-08-24 Finished Drilling
1966-08-24 Well Mode changed to Drilled and Cased
1966-08-25 Drill Stem Test Performed
1966-08-26 Drill Stem Test Performed
1966-08-27 Drill Stem Test Performed
1966-08-28 Drill Stem Test Performed
1966-08-29 Drill Stem Test Performed
1966-08-30 Production Casing Operation Performed
1966-09-04 Perforation Treatment Performed - Jet Perforation
1966-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-07 Well Began Production
1966-09-07 Well Fluid changed to Crude Oil
1966-09-07 Well Mode changed to Flowing
1966-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-09-08 Perforation Treatment Performed - Jet Perforation
1966-09-09 Well Fluid changed to Crude Oil
1966-09-09 Well Mode changed to Flowing
1985-12-05 Well Fluid changed to Crude Oil
1985-12-05 Well Mode changed to Pumping
1992-09-29 Well Log Performed
1992-09-30 Perforation Treatment Performed - Cement Squeeze
1992-10-01 Perforation Treatment Performed - Jet Perforation
1992-10-01 Well Log Performed
1992-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-11-26 Perforation Treatment Performed - Cement Squeeze
1995-11-26 Plug Back Performed
1995-11-29 Well Log Performed
1995-11-30 Perforation Treatment Performed - Jet Perforation
1995-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-06 Well Log Performed
1995-12-07 Perforation Treatment Performed - Jet Perforation
1995-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-14 Perforation Treatment Performed - Cement Squeeze
1995-12-14 Plug Back Performed
2002-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-09-30 Perforation Treatment Performed - Jet Perforation
2002-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-12-31 Well Fluid changed to Crude Oil
2011-12-31 Well Mode changed to Suspended
2016-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-06 Perforation Treatment Performed - Cement Squeeze
2016-07-06 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-09-04 Perforation 1876.30 1878.20 3
1995-11-30 Perforation 1868.00 1871.00 17
1995-12-04 Acid Treatment 1868.00 1871.00 0
1995-12-07 Perforation 1843.50 1846.50 17
1995-12-10 Acid Treatment 1843.50 1846.50 0
1995-12-14 Cement Squeeze 1843.50 1846.50 0
2002-09-29 Packing Device Capped w/Cement 1847.00 1855.00 0
2002-09-30 Perforation 1832.50 1840.00 17
2002-10-02 Acid Treatment 1832.50 1840.00 0
2016-07-06 Cement Squeeze 1832.50 1840.00 0
2016-07-06 Packing Device Capped w/Cement 1780.00 1830.80 0
1966-09-06 Acid Treatment 1876.30 1878.20 0
1966-09-08 Perforation 1848.90 1850.70 7
1966-09-08 Acid Treatment 1848.90 1850.70 0
1992-09-30 Cement Squeeze 1876.30 1878.20 0
1992-10-01 Perforation 1873.30 1874.50 18
1992-10-02 Acid Treatment 1873.30 1874.50 0
1992-10-06 Acid Treatment 1848.90 1850.70 0
1995-11-26 Cement Squeeze 1848.90 1874.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5427 0.0 0.0 0.0
1968 5120 0.0 0.0 0.0
1969 2974 0.0 0.0 0.0
1970 4237 0.0 0.0 0.0
1971 6569 0.0 0.0 0.0
1972 7386 0.0 0.0 0.0
1973 8324 0.0 0.0 0.0
1974 2695 0.0 0.0 0.0
1975 7732 0.0 0.0 0.0
1976 8112 0.0 0.0 0.0
1977 7939 0.0 0.0 0.0
1978 8115 0.0 0.0 0.0
1979 8367 0.0 0.0 0.0
1980 7603 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8048 0.0 0.0 0.0
1983 8136 0.0 0.0 0.0
1984 8312 0.0 0.0 0.0
1985 7706 0.0 0.0 0.0
1986 7909 0.0 0.0 0.0
1987 8476 0.0 0.0 0.0
1988 8567 0.0 0.0 0.0
1989 8348 0.0 0.0 0.0
1990 7144 0.0 0.0 0.0
1991 8151 0.0 0.0 0.0
1992 2434 0.0 0.0 0.0
1993 8019 0.0 0.0 0.0
1994 8547 0.0 0.0 0.0
1995 7582 0.0 0.0 0.0
1996 8683 0.0 0.0 0.0
1997 8295 0.0 0.0 0.0
1998 8701 0.0 0.0 0.0
1999 8104 0.0 0.0 0.0
2000 8068 0.0 0.0 0.0
2001 8442 0.0 0.0 0.0
2002 5969 0.0 0.0 0.0
2003 8634 0.0 0.0 0.0
2004 8188 0.0 0.0 0.0
2005 6072 0.0 0.0 0.0
2006 6576 0.0 0.0 0.0
2007 4535 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References