X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242605002

Well Details

Well ID: 0394242605002
Loading map...
Location: 00/05-26-039-24W4/2
Location Alias: 00/05-26-39-24 W4M
Location Alias 2: 00/05-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 5-26-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0141206
License Date: 1989-10-06
License Status: Suspension
Spud Date: 1989-10-19
Final Drill Date: 1989-10-31
Well Total Depth: 1931.00 m
Surface Hole Latitude: 52.381407
Surface Hole Longitude: -113.360392

For data sources see[1][2]

Well History

Date Event
1989-10-06 Obtained License
1989-10-20 Surface Casing Operation Performed
1989-10-31 Finished Drilling
1989-10-31 Well Log Performed
1989-10-31 Well Mode changed to Drilled and Cased
1989-11-02 Drill Stem Test Performed
1989-11-03 Drill Stem Test Performed
1989-11-04 Production Casing Operation Performed
1989-11-05 Rig Released
1989-11-22 Perforation Treatment Performed - Jet Perforation
1989-11-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-29 Perforation Treatment Performed - Jet Perforation
1989-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-01-05 Well Began Production
1990-01-05 Well Fluid changed to Crude Oil
1990-01-05 Well Mode changed to Flowing
1990-01-27 Well Fluid changed to Crude Oil
1990-01-27 Well Mode changed to Pumping
1992-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-01 Well Fluid changed to Crude Oil
1997-09-01 Well Mode changed to Suspended
1997-09-02 Well Log Performed
1997-09-03 Perforation Treatment Performed - Cement Squeeze
1997-09-07 Perforation Treatment Performed - Jet Perforation
1997-09-07 Well Log Performed
1997-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-19 Perforation Treatment Performed - Jet Perforation
2004-07-19 Plug Back Performed
2004-07-19 Well Log Performed
2004-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-21 Perforation Treatment Performed - Jet Perforation
2004-07-21 Well Log Performed
2004-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-07-26 Well Log Performed
2004-08-01 Well Fluid changed to Crude Oil
2004-08-01 Well Mode changed to Pumping
2012-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-12 Plug Back Performed
2012-01-12 Well Fluid changed to Crude Oil
2012-01-12 Well Log Performed
2012-01-12 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-22 Perforation 1886.30 1887.80 13
2004-07-19 Perforation 1859.00 1861.00 17
2004-07-20 Acid Treatment 1859.00 1861.00 0
2004-07-21 Perforation 1848.00 1851.50 17
2004-07-22 Acid Treatment 1848.00 1851.50 0
2012-01-12 Packing Device Capped w/Cement 1835.00 1843.00 0
1989-11-23 Acid Treatment 1886.30 1887.80 0
1989-11-29 Perforation 1852.00 1853.00 13
1989-11-30 Acid Treatment 1852.00 1853.00 0
1992-06-05 Acid Treatment 1852.00 1853.00 0
1997-09-03 Cement Squeeze 1852.00 1887.80 0
1997-09-07 Perforation 1882.00 1885.00 17
1997-09-08 Acid Treatment 1882.00 1885.00 0
2004-07-19 Packing Device Capped w/Cement 1869.00 1877.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 7899 0.0 0.0 0.0
1991 8199 0.0 0.0 0.0
1992 8390 0.0 0.0 0.0
1993 8195 0.0 0.0 0.0
1994 7790 0.0 0.0 0.0
1995 8426 0.0 0.0 0.0
1996 7444 0.0 0.0 0.0
1997 792 0.0 0.0 0.0
2004 3672 0.0 0.0 0.0
2005 2016 0.0 0.0 0.0
2006 2448 0.0 0.0 0.0
2007 2616 0.0 0.0 0.0
2008 1080 0.0 0.0 0.0

For data sources see[5]

References