X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242603002

Well Details

Well ID: 0394242603002
Loading map...
Location: 00/03-26-039-24W4/2
Location Alias: 00/03-26-39-24 W4M
Location Alias 2: 00/03-26-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 26
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 3-26-39-24
Operator Name: Ember Resources Inc.
License Number: 0132336
License Date: 1988-02-17
License Status: Issued
Spud Date: 1988-03-10
Final Drill Date: 1988-03-24
Well Total Depth: 1925.00 m
Surface Hole Latitude: 52.378587
Surface Hole Longitude: -113.353609

For data sources see[1][2]

Well History

Date Event
1988-02-17 Obtained License
1988-03-11 Surface Casing Operation Performed
1988-03-24 Finished Drilling
1988-03-24 Well Log Performed
1988-03-24 Well Mode changed to Drilled and Cased
1988-03-26 Production Casing Operation Performed
1988-03-26 Rig Released
1988-04-01 Well Log Performed
1988-04-04 Well Log Performed
1988-04-05 Well Log Performed
1988-04-06 Perforation Treatment Performed - Acid Wash - No Pressure
1988-04-06 Perforation Treatment Performed - Jet Perforation
1988-04-07 Perforation Treatment Performed - Jet Perforation
1988-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-07 Well Began Production
1988-05-07 Well Fluid changed to Crude Oil
1988-05-07 Well Mode changed to Pumping
1994-02-02 Perforation Treatment Performed - Jet Perforation
1994-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-15 Perforation Treatment Performed - Cement Squeeze
1994-02-18 Perforation Treatment Performed - Jet Perforation
1994-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-23 Well Log Performed
1994-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-24 Perforation Treatment Performed - Jet Perforation
1994-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-01 Perforation Treatment Performed - Jet Perforation
1997-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-04 Perforation Treatment Performed - Cement Squeeze
1997-10-04 Well Fluid changed to Crude Oil
1997-10-04 Well Mode changed to Suspended
1997-10-09 Perforation Treatment Performed - Jet Perforation
1997-10-09 Well Log Performed
1997-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-05-22 Plug Back Performed
1999-05-23 Perforation Treatment Performed - Jet Perforation
1999-05-25 Perforation Treatment Performed - Fractured
1999-06-15 Well Fluid changed to Crude Oil
1999-06-15 Well Mode changed to Suspended
1999-06-16 Well Fluid changed to Crude Oil
1999-06-16 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-04-06 Perforation 1885.50 1887.00 13
1994-02-24 Perforation 1848.50 1849.50 17
1994-02-24 Acid Treatment 1848.50 1849.50 0
1994-03-01 Perforation 1842.00 1845.00 17
1994-03-01 Acid Treatment 1842.00 1845.00 0
1997-10-04 Acid Treatment 1842.00 1856.00 0
1997-10-04 Cement Squeeze 1885.50 1887.00 0
1997-10-04 Cement Squeeze 1842.00 1856.00 0
1997-10-09 Perforation 1876.00 1879.00 17
1997-10-10 Acid Treatment 1876.00 1879.00 0
1999-05-22 Packing Device Capped w/Cement 1864.00 1872.00 0
1988-04-06 Acid Wash 1885.50 1887.00 0
1999-05-22 Packing Device Capped w/Cement 1836.00 1844.00 0
1999-05-23 Perforation 610.50 614.50 16
1999-05-25 Fracture 610.50 614.50 0
1988-04-07 Perforation 1858.00 1859.00 13
1988-04-08 Acid Treatment 1858.00 1859.00 0
1994-02-02 Perforation 1858.00 1859.00 17
1994-02-03 Acid Treatment 1858.00 1859.00 0
1994-02-15 Cement Squeeze 1858.00 1859.00 0
1994-02-18 Perforation 1854.50 1856.00 18
1994-02-20 Acid Treatment 1854.50 1856.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 5185 0.0 0.0 0.0
1989 7965 0.0 0.0 0.0
1990 8522 0.0 0.0 0.0
1991 8279 0.0 0.0 0.0
1992 3071 0.0 0.0 0.0
1994 7076 0.0 0.0 0.0
1995 8426 0.0 0.0 0.0
1996 7872 0.0 0.0 0.0
1997 3837 0.0 0.0 0.0

For data sources see[5]

References