X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242310002

Well Details

Well ID: 0394242310002
Loading map...
Location: 00/10-23-039-24W4/2
Location Alias: 00/10-23-39-24 W4M
Location Alias 2: 00/10-23-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 10-23-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0029663
License Date: 1965-12-22
License Status: Suspension
Spud Date: 1966-01-08
Final Drill Date: 1966-01-27
Well Total Depth: 1926.30 m
Surface Hole Latitude: 52.370733
Surface Hole Longitude: -113.349346

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-22 Obtained License
1966-01-08 Lost Circulation Occurred
1966-01-22 Drill Stem Test Performed
1966-01-27 Finished Drilling
1966-01-27 Lost Circulation Occurred
1966-01-27 Well Mode changed to Drilled and Cased
1966-01-29 Production Casing Operation Performed
1966-01-31 Perforation Treatment Performed - Jet Perforation
1966-02-03 Perforation Treatment Performed - Jet Perforation
1966-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-06 Well Began Production
1966-02-06 Well Fluid changed to Crude Oil
1966-02-06 Well Mode changed to Flowing
1966-02-12 Perforation Treatment Performed - Jet Perforation
1966-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-06 Perforation Treatment Performed - Cement Squeeze
1975-11-06 Well Fluid changed to Crude Oil
1975-11-06 Well Mode changed to Abandoned Zone
1976-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-20 Well Log Performed
1992-03-23 Perforation Treatment Performed - Cement Squeeze
1992-03-24 Perforation Treatment Performed - Jet Perforation
1992-03-24 Well Log Performed
1992-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-26 Perforation Treatment Performed - Jet Perforation
1992-03-26 Well Log Performed
1992-03-27 Perforation Treatment Performed - Cement Squeeze
1992-03-30 Perforation Treatment Performed - Jet Perforation
1992-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-04-02 Plug Back Performed
1999-08-20 Well Log Performed
1999-08-21 Perforation Treatment Performed - Jet Perforation
1999-08-21 Well Log Performed
1999-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-08-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-09-02 Well Fluid changed to Crude Oil
1999-09-02 Well Mode changed to Pumping
2007-07-15 Well Log Performed
2011-11-30 Well Fluid changed to Crude Oil
2011-11-30 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-01-31 Perforation 1898.00 1898.60 13
1992-03-24 Perforation 1890.40 1892.20 17
1992-03-25 Acid Treatment 1890.40 1892.20 0
1992-03-26 Perforation 1886.70 1888.50 17
1992-03-27 Cement Squeeze 1886.70 1888.50 0
1992-03-30 Perforation 1886.70 1887.70 17
1992-03-31 Acid Treatment 1886.70 1887.70 0
1992-04-02 Packing Device Capped w/Cement 1875.70 1884.70 0
1992-04-02 Packing Device Capped w/Cement 1843.00 1852.00 0
1999-08-21 Perforation 1856.50 1859.00 13
1999-08-22 Acid Treatment 1856.50 1859.00 0
1966-02-03 Perforation 1856.50 1858.70 13
1999-08-23 Acid Treatment 1856.50 1859.00 0
1966-02-05 Acid Treatment 1898.00 1898.60 0
1966-02-12 Perforation 1856.50 1858.70 13
1966-02-22 Acid Treatment 1856.50 1858.70 0
1966-02-25 Acid Treatment 1898.00 1898.60 0
1975-11-06 Cement Squeeze 1856.50 1858.70 0
1976-03-06 Acid Treatment 1898.00 1898.60 0
1992-03-23 Cement Squeeze 1898.00 1898.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 6053 0.0 0.0 0.0
1968 6403 0.0 0.0 0.0
1969 5135 0.0 0.0 0.0
1970 1833 0.0 0.0 0.0
1999 104 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-01-08 Lost Circulation 104.50 104.50
1966-01-27 Lost Circulation 1894.90 1898.00

For data sources see[6]

References