X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242306002

Well Details

Well ID: 0394242306002
Loading map...
Location: 00/06-23-039-24W4/2
Location Alias: 00/06-23-39-24 W4M
Location Alias 2: 00/06-23-039-24 W4/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 6-23-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0107444
License Date: 1984-06-04
License Status: Suspension
Spud Date: 1984-06-16
Final Drill Date: 1984-06-28
Well Total Depth: 1945.00 m
Surface Hole Latitude: 52.366805
Surface Hole Longitude: -113.354375

For data sources see[1][2]

Well History

Date Event
1984-06-04 Obtained License
1984-06-17 Surface Casing Operation Performed
1984-06-28 Finished Drilling
1984-06-28 Well Mode changed to Drilled and Cased
1984-06-29 Well Log Performed
1984-06-30 Well Log Performed
1984-07-01 Production Casing Operation Performed
1984-07-01 Rig Released
1984-08-14 Well Log Performed
1984-08-15 Perforation Treatment Performed - Jet Perforation
1984-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-08-17 Perforation Treatment Performed - Jet Perforation
1984-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-16 Well Began Production
1984-10-16 Well Fluid changed to Crude Oil
1984-10-16 Well Mode changed to Pumping
1991-01-08 Perforation Treatment Performed - Cement Squeeze
1991-01-09 Perforation Treatment Performed - Cement Squeeze
1991-01-09 Plug Back Performed
1991-01-09 Well Fluid changed to Crude Oil
1991-01-09 Well Mode changed to Abandoned Zone
1991-01-12 Perforation Treatment Performed - Jet Perforation
1991-01-16 Perforation Treatment Performed - Acid Wash - No Pressure
1993-07-14 Perforation Treatment Performed - Cement Squeeze
1993-07-14 Well Log Performed
1993-07-15 Perforation Treatment Performed - Jet Perforation
1993-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-17 Perforation Treatment Performed - Cement Squeeze
1993-07-19 Well Log Performed
1993-07-20 Perforation Treatment Performed - Jet Perforation
1993-07-20 Well Log Performed
1993-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-21 Perforation Treatment Performed - Cement Squeeze
1993-07-22 Perforation Treatment Performed - Jet Perforation
2002-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-26 Plug Back Performed
2002-11-27 Perforation Treatment Performed - Jet Perforation
2002-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-10 Plug Back Performed
2003-09-10 Well Log Performed
2003-09-11 Perforation Treatment Performed - Jet Perforation
2003-09-11 Well Log Performed
2003-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-09-17 Perforation Treatment Performed - Jet Perforation
2003-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-12-04 Perforation Treatment Performed - Cement Plug
2019-12-04 Plug Back Performed
2019-12-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-08-15 Perforation 1904.00 1904.50 7
1993-07-15 Perforation 1894.00 1895.00 17
1993-07-16 Acid Treatment 1894.00 1895.00 0
1993-07-17 Cement Squeeze 1894.00 1895.00 0
1993-07-20 Perforation 1891.50 1892.50 17
1993-07-21 Acid Treatment 1891.50 1892.50 0
1993-07-21 Cement Squeeze 1891.50 1892.50 0
1993-07-22 Perforation 1889.00 1890.00 17
2002-11-26 Packing Device Capped w/Cement 1879.00 1887.00 0
2002-11-27 Perforation 1856.00 1862.00 17
2002-11-29 Acid Treatment 1856.00 1862.00 0
1984-08-16 Acid Treatment 1904.00 1904.50 0
2003-09-10 Packing Device Capped w/Cement 1844.00 1852.00 0
2003-09-11 Perforation 1706.00 1709.00 17
2003-09-11 Perforation 1699.50 1700.50 17
2003-09-11 Perforation 1695.50 1697.00 17
2003-09-11 Perforation 1691.00 1694.50 17
2003-09-12 Acid Treatment 1706.00 1709.00 0
2003-09-12 Acid Treatment 1699.50 1700.50 0
2003-09-12 Acid Treatment 1695.50 1697.00 0
2003-09-12 Acid Treatment 1691.00 1694.50 0
2003-09-17 Perforation 1677.00 1680.00 17
1984-08-17 Perforation 1868.00 1869.00 14
2003-09-18 Acid Treatment 1677.00 1680.00 0
2019-12-04 Cement Plug 1545.00 1704.00 0
1984-08-18 Acid Treatment 1868.00 1869.00 0
1991-01-08 Cement Squeeze 1904.00 1904.50 0
1991-01-09 Cement Squeeze 1868.00 1869.00 0
1991-01-12 Perforation 1900.00 1901.00 13
1991-01-16 Acid Wash 1900.00 1901.00 0
1993-07-14 Cement Squeeze 1900.00 1901.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1772 0.0 0.0 0.0
1985 8669 0.0 0.0 0.0
1986 8363 0.0 0.0 0.0
1987 8182 0.0 0.0 0.0
1988 8300 0.0 0.0 0.0
1989 7742 0.0 0.0 0.0
1990 8010 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References