If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394242304002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.363749,"lon":-113.359405,"icon":""}]} |
Location: 00/04-23-039-24W4/2 | |
Location Alias: 00/04-23-39-24 W4M | |
Location Alias 2: 00/04-23-039-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 23 | |
County/Municipality: Lacombe County | |
Well Name: FAIRBORNE CLIVE 4-23-39-24 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0030129 | |
License Date: 1966-03-01 | |
License Status: Suspension | |
Spud Date: 1966-03-17 | |
Final Drill Date: 1966-04-05 | |
Well Total Depth: 1938.50 m | |
Surface Hole Latitude: 52.363749 | |
Surface Hole Longitude: -113.359405 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-03-01 | Obtained License |
1966-04-01 | Drill Stem Test Performed |
1966-04-03 | Drill Stem Test Performed |
1966-04-05 | Drill Stem Test Performed |
1966-04-05 | Finished Drilling |
1966-04-05 | Well Mode changed to Drilled and Cased |
1966-04-07 | Production Casing Operation Performed |
1966-04-11 | Perforation Treatment Performed - Jet Perforation |
1966-04-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-04-16 | Well Began Production |
1966-04-16 | Well Fluid changed to Crude Oil |
1966-04-16 | Well Mode changed to Flowing |
1966-04-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-08-27 | Perforation Treatment Performed - Jet Perforation |
1966-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-09-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-09-04 | Well Fluid changed to Crude Oil |
1967-09-04 | Well Mode changed to Pumping |
1968-04-16 | Well Fluid changed to Crude Oil |
1968-04-16 | Well Mode changed to Suspended |
1990-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-08-14 | Perforation Treatment Performed - Cement Squeeze |
1990-08-14 | Well Fluid changed to Crude Oil |
1990-08-14 | Well Mode changed to Abandoned Zone |
1996-02-02 | Well Log Performed |
1996-02-03 | Perforation Treatment Performed - Jet Perforation |
1996-02-04 | Perforation Treatment Performed - Remedial Casing |
1996-02-10 | Well Log Performed |
1996-02-11 | Perforation Treatment Performed - Jet Perforation |
1996-09-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-12-16 | Perforation Treatment Performed - Cement Squeeze |
2002-12-19 | Perforation Treatment Performed - Jet Perforation |
2002-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-10-27 | Well Log Performed |
2011-10-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-28 | Plug Back Performed |
2011-10-28 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-04-11 | Perforation | 1908.00 | 1909.60 | 13 |
1990-08-03 | Acid Treatment | 1877.00 | 1884.00 | 0 |
1990-08-14 | Cement Squeeze | 1877.00 | 1884.00 | 0 |
1996-02-03 | Perforation | 267.00 | 268.00 | 14 |
1996-02-04 | Remedial Casing Cementing | 267.00 | 268.00 | 0 |
1996-02-11 | Perforation | 1905.00 | 1907.50 | 17 |
1996-09-26 | Acid Treatment | 1905.00 | 1907.50 | 0 |
2002-12-16 | Cement Squeeze | 1905.00 | 1909.50 | 0 |
2002-12-19 | Perforation | 1915.30 | 1916.60 | 17 |
2002-12-20 | Acid Treatment | 1915.30 | 1916.60 | 0 |
2011-10-28 | Packing Device Capped w/Cement | 1892.00 | 1900.00 | 0 |
1966-04-11 | Perforation | 1877.00 | 1881.80 | 13 |
2011-10-28 | Packing Device Capped w/Cement | 1867.00 | 1875.00 | 0 |
1966-04-15 | Acid Treatment | 1908.00 | 1909.60 | 0 |
1966-04-15 | Acid Treatment | 1877.00 | 1881.80 | 0 |
1966-04-21 | Acid Treatment | 1908.00 | 1909.60 | 0 |
1966-04-21 | Acid Treatment | 1877.00 | 1881.80 | 0 |
1966-08-27 | Perforation | 1883.40 | 1884.00 | 13 |
1966-08-31 | Acid Treatment | 1883.40 | 1884.00 | 0 |
1967-09-01 | Acid Treatment | 1877.00 | 1884.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 419 | 0.0 | 0.0 | 0.0 |
For data sources see[5]