X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394242302000

Well Details

Well ID: 0394242302000
Loading map...
Location: 00/02-23-039-24W4/0
Location Alias: 00/02-23-39-24 W4M
Location Alias 2: 00/02-23-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 23
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 2-23-39-24
Operator Name: Tourmaline Oil Corp.
License Number: 0029934
License Date: 1966-02-01
License Status: Suspension
Spud Date: 1966-02-10
Final Drill Date: 1966-02-24
Well Total Depth: 1921.80 m
Surface Hole Latitude: 52.363495
Surface Hole Longitude: -113.349336

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-01 Obtained License
1966-02-16 Drill Stem Test Performed
1966-02-24 Finished Drilling
1966-02-24 Well Mode changed to Drilled and Cased
1966-02-25 Drill Stem Test Performed
1966-02-26 Drill Stem Test Performed
1966-02-26 Production Casing Operation Performed
1966-02-28 Perforation Treatment Performed - Jet Perforation
1966-03-04 Perforation Treatment Performed - Jet Perforation
1966-03-04 Well Began Production
1966-03-04 Well Fluid changed to Crude Oil
1966-03-04 Well Mode changed to Flowing
1966-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-03-11 Perforation Treatment Performed - Jet Perforation
1966-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1966-05-31 Perforation Treatment Performed - Acid Wash - No Pressure
1976-10-01 Well Fluid changed to Crude Oil
1976-10-01 Well Mode changed to Suspended
1977-03-09 Well Fluid changed to Crude Oil
1977-03-09 Well Mode changed to Pumping
1996-04-30 Well Fluid changed to Crude Oil
1996-04-30 Well Mode changed to Suspended
2008-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-16 Plug Back Performed
2008-07-16 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-02-28 Perforation 1891.00 1891.60 13
1966-03-04 Perforation 1891.60 1892.50 13
1966-03-04 Perforation 1858.70 1860.50 13
1966-03-10 Acid Treatment 1858.70 1860.50 0
1966-03-11 Perforation 1892.80 1894.00 13
1966-05-30 Acid Wash 1892.80 1894.00 0
1966-05-31 Acid Wash 1892.80 1894.00 0
2008-07-16 Packing Device Capped w/Cement 1868.50 1877.00 0
2008-07-16 Packing Device Capped w/Cement 1839.50 1848.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 3183 0.0 0.0 0.0
1968 3655 0.0 0.0 0.0
1969 3668 0.0 0.0 0.0
1970 5595 0.0 0.0 0.0
1971 7119 0.0 0.0 0.0
1972 2965 0.0 0.0 0.0
1973 360 0.0 0.0 0.0
1974 193 0.0 0.0 0.0
1975 6308 0.0 0.0 0.0
1976 6454 0.0 0.0 0.0
1977 5217 0.0 0.0 0.0
1978 8075 0.0 0.0 0.0
1979 8553 0.0 0.0 0.0
1980 3946 0.0 0.0 0.0
1981 1680 0.0 0.0 0.0

For data sources see[5]

References