If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0394241507000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.350577,"lon":-113.36962,"icon":""}]} |
Location: 00/07-15-039-24W4/0 | |
Location Alias: 00/07-15-39-24 W4M | |
Location Alias 2: 00/07-15-039-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 4 | |
Range: 24 | |
Section: 15 | |
County/Municipality: Lacombe County | |
Well Name: EMBER CLIVE 7-15-39-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0421953 | |
License Date: 2010-07-20 | |
License Status: Issued | |
Spud Date: 2010-08-06 | |
Final Drill Date: 2010-08-07 | |
Well Total Depth: 876.00 m | |
Surface Hole Latitude: 52.350577 | |
Surface Hole Longitude: -113.369620 |
Date | Event |
---|---|
2010-07-20 | Obtained License |
2010-08-07 | Finished Drilling |
2010-08-07 | Production Casing Operation Performed |
2010-08-07 | Surface Casing Operation Performed |
2010-08-07 | Well Mode changed to Drilled and Cased |
2010-08-08 | Rig Released |
2010-08-28 | Well Log Performed |
2010-09-25 | Perforation Treatment Performed - Jet Perforation |
2010-09-25 | Well Log Performed |
2010-10-03 | Perforation Treatment Performed - Fractured |
2010-10-09 | Well Began Production |
2010-10-09 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-10-09 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-09-25 | Perforation | 527.00 | 529.50 | 17 |
2010-09-25 | Perforation | 443.50 | 444.00 | 17 |
2010-09-25 | Perforation | 437.00 | 439.00 | 17 |
2010-09-25 | Perforation | 433.50 | 434.00 | 17 |
2010-09-25 | Perforation | 425.00 | 426.00 | 17 |
2010-09-25 | Perforation | 408.50 | 409.50 | 17 |
2010-09-25 | Perforation | 405.50 | 406.00 | 17 |
2010-09-25 | Perforation | 403.30 | 403.80 | 17 |
2010-09-25 | Perforation | 396.50 | 397.50 | 17 |
2010-09-25 | Perforation | 386.00 | 387.00 | 17 |
2010-09-25 | Perforation | 330.00 | 331.00 | 17 |
2010-09-25 | Perforation | 522.00 | 523.00 | 17 |
2010-09-25 | Perforation | 289.00 | 289.50 | 17 |
2010-10-03 | Fracture | 527.00 | 529.50 | 0 |
2010-10-03 | Fracture | 522.00 | 523.00 | 0 |
2010-10-03 | Fracture | 519.00 | 519.50 | 0 |
2010-10-03 | Fracture | 516.50 | 517.00 | 0 |
2010-10-03 | Fracture | 502.50 | 503.50 | 0 |
2010-10-03 | Fracture | 498.00 | 499.00 | 0 |
2010-10-03 | Fracture | 494.00 | 495.00 | 0 |
2010-10-03 | Fracture | 473.00 | 475.00 | 0 |
2010-10-03 | Fracture | 455.00 | 458.00 | 0 |
2010-09-25 | Perforation | 519.00 | 519.50 | 17 |
2010-10-03 | Fracture | 443.50 | 444.00 | 0 |
2010-10-03 | Fracture | 437.00 | 439.00 | 0 |
2010-10-03 | Fracture | 433.50 | 434.00 | 0 |
2010-10-03 | Fracture | 425.00 | 426.00 | 0 |
2010-10-03 | Fracture | 408.50 | 409.50 | 0 |
2010-10-03 | Fracture | 405.50 | 406.00 | 0 |
2010-10-03 | Fracture | 403.30 | 403.80 | 0 |
2010-10-03 | Fracture | 396.50 | 397.50 | 0 |
2010-10-03 | Fracture | 386.00 | 387.00 | 0 |
2010-10-03 | Fracture | 330.00 | 331.00 | 0 |
2010-09-25 | Perforation | 516.50 | 517.00 | 17 |
2010-10-03 | Fracture | 289.00 | 289.50 | 0 |
2010-09-25 | Perforation | 502.50 | 503.50 | 17 |
2010-09-25 | Perforation | 498.00 | 499.00 | 17 |
2010-09-25 | Perforation | 494.00 | 495.00 | 17 |
2010-09-25 | Perforation | 473.00 | 475.00 | 17 |
2010-09-25 | Perforation | 455.00 | 458.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2016 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8678 | 0.0 | 0.0 | 0.0 |
2013 | 8730 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8756 | 0.0 | 0.0 | 0.0 |
2016 | 8763 | 0.0 | 0.0 | 0.0 |
2017 | 8040 | 0.0 | 0.0 | 0.0 |
2018 | 8625 | 0.0 | 0.0 | 0.0 |
2019 | 8248 | 0.0 | 0.0 | 0.0 |
2020 | 1894 | 0.0 | 0.0 | 0.0 |
For data sources see[5]