X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0394241507000

Well Details

Well ID: 0394241507000
Loading map...
Location: 00/07-15-039-24W4/0
Location Alias: 00/07-15-39-24 W4M
Location Alias 2: 00/07-15-039-24 W4/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 4
Range: 24
Section: 15
County/Municipality: Lacombe County
Well Name: EMBER CLIVE 7-15-39-24
Operator Name: Ember Resources Inc.
License Number: 0421953
License Date: 2010-07-20
License Status: Issued
Spud Date: 2010-08-06
Final Drill Date: 2010-08-07
Well Total Depth: 876.00 m
Surface Hole Latitude: 52.350577
Surface Hole Longitude: -113.369620

For data sources see[1][2]

Well History

Date Event
2010-07-20 Obtained License
2010-08-07 Finished Drilling
2010-08-07 Production Casing Operation Performed
2010-08-07 Surface Casing Operation Performed
2010-08-07 Well Mode changed to Drilled and Cased
2010-08-08 Rig Released
2010-08-28 Well Log Performed
2010-09-25 Perforation Treatment Performed - Jet Perforation
2010-09-25 Well Log Performed
2010-10-03 Perforation Treatment Performed - Fractured
2010-10-09 Well Began Production
2010-10-09 Well Fluid changed to Coalbed Methane-Coals Only
2010-10-09 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-25 Perforation 527.00 529.50 17
2010-09-25 Perforation 443.50 444.00 17
2010-09-25 Perforation 437.00 439.00 17
2010-09-25 Perforation 433.50 434.00 17
2010-09-25 Perforation 425.00 426.00 17
2010-09-25 Perforation 408.50 409.50 17
2010-09-25 Perforation 405.50 406.00 17
2010-09-25 Perforation 403.30 403.80 17
2010-09-25 Perforation 396.50 397.50 17
2010-09-25 Perforation 386.00 387.00 17
2010-09-25 Perforation 330.00 331.00 17
2010-09-25 Perforation 522.00 523.00 17
2010-09-25 Perforation 289.00 289.50 17
2010-10-03 Fracture 527.00 529.50 0
2010-10-03 Fracture 522.00 523.00 0
2010-10-03 Fracture 519.00 519.50 0
2010-10-03 Fracture 516.50 517.00 0
2010-10-03 Fracture 502.50 503.50 0
2010-10-03 Fracture 498.00 499.00 0
2010-10-03 Fracture 494.00 495.00 0
2010-10-03 Fracture 473.00 475.00 0
2010-10-03 Fracture 455.00 458.00 0
2010-09-25 Perforation 519.00 519.50 17
2010-10-03 Fracture 443.50 444.00 0
2010-10-03 Fracture 437.00 439.00 0
2010-10-03 Fracture 433.50 434.00 0
2010-10-03 Fracture 425.00 426.00 0
2010-10-03 Fracture 408.50 409.50 0
2010-10-03 Fracture 405.50 406.00 0
2010-10-03 Fracture 403.30 403.80 0
2010-10-03 Fracture 396.50 397.50 0
2010-10-03 Fracture 386.00 387.00 0
2010-10-03 Fracture 330.00 331.00 0
2010-09-25 Perforation 516.50 517.00 17
2010-10-03 Fracture 289.00 289.50 0
2010-09-25 Perforation 502.50 503.50 17
2010-09-25 Perforation 498.00 499.00 17
2010-09-25 Perforation 494.00 495.00 17
2010-09-25 Perforation 473.00 475.00 17
2010-09-25 Perforation 455.00 458.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 2016 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8678 0.0 0.0 0.0
2013 8730 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8756 0.0 0.0 0.0
2016 8763 0.0 0.0 0.0
2017 8040 0.0 0.0 0.0
2018 8625 0.0 0.0 0.0
2019 8248 0.0 0.0 0.0
2020 1894 0.0 0.0 0.0

For data sources see[5]

References